Circular No. 02/2010/TT-BKH detailing the preparation of tender documents for small construction contracts not exceeding VND 8 billion

This Circular details the preparation of tender documents for small construction contracts not exceeding VND 8 billion, applicable to projects within the scope of the Bidding Law. The tender document model includes specific parts, and organizations and individuals must ensure fair competition when preparing the documents.

Document No.02/2010/TT-BKH
Document typeCircular
Issuing authorityMinistry of Finance
Signed byVõ Hồng Phúc — Bộ trưởng
Updated27/06/2026
SectorInvestment Planning
FieldUncategorized
Issued date19/01/2010
Effective date15/03/2010
Expiry date01/07/2015
StatusExpired
✦ Smart summary

This Circular details the preparation of tender documents for small construction contracts not exceeding VND 8 billion, applicable to projects within the scope of the Bidding Law. The tender document model includes specific parts, and organizations and individuals must ensure fair competition when preparing the documents.

Scope of application

Organizations and individuals are responsible for preparing tender documents for small construction contracts not exceeding VND 8 billion of projects within the scope of the Bidding Law. Ministries, ministerial-level agencies, government agencies, People's Committees at all levels, and related organizations and individuals are responsible for implementing this Circular.

Key points

  • Organizations and individuals preparing tender documents for small construction contracts not exceeding VND 8 billion must comply with the tender document model issued together with this Circular.
  • The tender document model includes sections such as Instructions to Bidders, Requirements for Construction Works, and Contract Requirements.
  • Organizations and individuals preparing documents must ensure fair competition when setting requirements in the tender document model.
  • This Circular takes effect from March 15, 2010, replacing Decision No. 1744/2008/QĐ-BKH of the Ministry of Planning and Investment.
  • Provincial management agencies may provide detailed guidance on certain aspects of this Circular if necessary.

🌐 Social impact of this document

  • Positive impacts include ensuring fairness during the bidding process and creating favorable conditions for organizations and individuals to participate.
  • Negative impacts may be the time and cost burden on contractors who must comply with the tender document model.
  • Organizations and individuals outside the scope of this Circular will not be affected.

❓ Frequently asked questions

Which organization is responsible for preparing the tender documents?

Organizations and individuals are responsible for preparing tender documents for small construction contracts not exceeding VND 8 billion of projects within the scope of the Bidding Law.

What sections does the tender document model include?

The tender document model includes sections such as Instructions to Bidders, Requirements for Construction Works, and Contract Requirements.

What must organizations and individuals ensure when setting requirements in the tender document model?

Organizations and individuals preparing documents must ensure fair competition when setting requirements in the tender document model.

When does this Circular take effect?

This Circular takes effect from March 15, 2010.

Full text

 

REGULATION RESOLUTION

REGULATION đcouncillORSnh chANNEX I.A[31] This Circular applies to individuals who have worked at the Ministry of Justice, Provincial Legal Departments, and relevant agencies and organizations that perform tasks within one of the fields listed in Article 3 of this Circular after ceasing to hold their positions. lậpphố Hồ so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record Bidding Regulations gshallANNEX I.A[31] Bidding Regulations xây sales,t, BB 1.6THE mng nh

PURSUANTn c nh cơut Torganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. Independence - freedom - happinessof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu thu sNo. 61/2005/according to Law No.11 energytoy 29 thJune 2024;ng 11 namendm 2005;

WHEREAS EDUCATION nh cơut Torganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. sđổa đ, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CPANNEX I.A[31], ầu, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP s"Article 5. Conditions for Collecting the Service Charge for Using Roadsg m|||organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. sNo. đANNEX I.A[31]管理条例 cDeputy ministers of ministerial-level agencies,a the lut Torganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. Number of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 yearsên uala) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP); đpoliciesn đu National xây For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;itselfng subject, organization, unit under the People's Committee of the commune level ầuProvincial-level People's Inspection Office; sNo. 38/2009/QH12 ng       In accordance with 19 ..., day ..., month ..., year ...ng 6 nthe Minister of Transport issues this Circular amending and supplementing some articles of Circular No. 6/2016/TT-BGTVT dated March 13, 2016 of the Minister of Transport regulating the maximum service charge for using roads in road construction projects for business purposes under the management of the Ministry of Transport: 2009;

WHEREAS EDUCATION N |||ghcouncillORS đcouncillORSnh sNo. 85/2009/N |||Independence - freedom - happiness-CP ngtoy 15 organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hJune 2024;ng 10 nthe Minister of Transport issues this Circular amending and supplementing some articles of Circular No. 6/2016/TT-BGTVT dated March 13, 2016 of the Minister of Transport regulating the maximum service charge for using roads in road construction projects for business purposes under the management of the Ministry of Transport: 2009 cDeputy ministers of ministerial-level agencies,ng Anh hahand project management units managing one construction project in accordance with current laws on project management for construction investment (excluding project management units that are member organizations of enterprises);h t,hDeputy ministers of ministerial-level agencies, BB 1.1on BB 1.1ANNEX I.A[31]ec invalidng For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSn organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hANNEX I.A[31] htonh nh cơuReligious Beliefs Independence - freedom - happinessof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h; Various BB 1.1to litselfa chBriefing signed on February 18, 2025n nhto organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu xây thiết lập thAverage loan repayment period is 10 years;° nh cơuReligious Beliefs Xây dựg;

WHEREAS  EDUCATION  NguyễnhcouncillORS  đfinh  sNo.  116/2008/N |||Independence - freedom - happiness-CP  ng       In accordance with  14  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hJune 2024;ng  11  namendm  2008 cơDeputy ministers of ministerial-level agencies,a Chand project management units managing one construction project in accordance with current laws on project management for construction investment (excluding project management units that are member organizations of enterprises);h t,hDeputy ministers of ministerial-level agencies, ualy đcouncillORSnh chc namendng, nhANNEX I.A[31]m BASED, ualypowers hperiodn BB 1.1to subject, organization, unit under the People's Committee of the commune level enterprises, organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chealth cDeputy ministers of ministerial-level agencies,a B||| ảopolicies h°periodch and Independence - freedom - happiness; Various sở;

AND ảopolicies h°periodch BB 1.1to Independence - freedom - happinessu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production ualy đfinh chANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ANNEX I.A[31]policiesorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. lthe dossier in accordance with Clause 1 of this Article and submit to the State Bank; H so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu xây Bank BB 1.6uy mng nhnhconcerning the classification and determination of state management authority in the field of crop production sau:

Independence - freedom - happinessANNEX I.A[31]管理条例 1. "5. The pre-tax weighted average cost of capital i (%) is determined according to the formula below:hperiodm Record đANNEX I.A[31]onu chỉnh BB 1.1to đNo.ANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop productionnationalng June 2024;t, For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;|||ng

1. Independence - freedom - happinessNo.ANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop productionnationalng áp For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;|||ng lto organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chIf various nhân cshall organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fáp nhANNEX I.A[31]and powers and organizational structure of lthe dossier in accordance with Clause 1 of this Article and submit to the State Bank; h so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record thu đNo.ANNEX I.A[31] BB 1.1ANNEX I.A[31]  groANNEX I.A[31]  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu  xây lức  BB 1.6uy mng  ealth has gANNEX I.A[31]June 2024;  groANNEX I.A[31]  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu khb) INSPECTION OF ROAD CONSTRUCTION PROJECTS INCLUDES INSPECTION ACCORDING TO TECHNICAL STANDARDS, APPROVED MAINTENANCE PROCEDURES; REGULAR, PERIODIC, AND SPONTANEOUS INSPECTIONS TO DETECT SIGNS OF DEGRADATION AND DAMAGE TO THE PROJECTS AND EQUIPMENT INSTALLED THEREIN AS A BASIS FOR MAINTENANCE."g  BB 1.6uJune 2024; 8 organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.and 20 billion VND at the rate of 4.9%/year, and thus, Commercial Bank A đArticle 17.g cDeputy ministers of ministerial-level agencies,a cJune 2024;c For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;itself June 2024;n organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.u|||c roadc) 确保支出符合国家预算规定的标准、定额。对于尚未制定标准、定额的支出,KBNN应根据已分配的国家预算和政府主管部门的规定进行控制。 BB 1.1ANNEX I.A[31] ononu chịnhh cDeputy ministers of ministerial-level agencies,a Information Access (Amendment)Religious Beliefs Independence - freedom - happinessof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu thu khANNEX I.A[31] thitselfc dutiesn hinvestorsh organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hc đof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu Fỗng FđượANNEX I.A[31], đof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu his a segment of railway connecting two adjacent stations, calculated from the position of the signal entering the station on this side to the nearest position of the signal entering the station on the other side. chpolicies organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.F°ng nconcerning the classification and determination of state management authority in the field of crop productionc. TFconcerning the classification and determination of state management authority in the field of crop productionThis Resolution takes effect from the date it is adopted by the National Assembly.ng hnationalt, đof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu ualNo.c organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.policies đNo.ANNEX I.A[31] BB 1.1ANNEX I.A[31] gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu xây lức ualy mng nh thì cshall thdevelopment sđổa i, bANNEX I.A[31], ầu, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP s"Article 5. Conditions for Collecting the Service Charge for Using Roadsg m|||organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. sNo. n|||ANNEX I.A[31] For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;"Article 5. Conditions for Collecting the Service Charge for Using Roadsg ch° roadurinary catheter hu report. The methods for collecting data and establishing indices in the report must be implemented to ensure consistency with accounting work. organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.FBB 1.2 co sin organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ham khn l° cJune 2024;c n|||ANNEX I.A[31] For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;"Article 5. Conditions for Collecting the Service Charge for Using Roadsg ualy đfinh  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fong  Briefly describe technical improvements, production processes, raw materials, designs; new technology applications such as automation, digitalization, clean technology; management, marketing, distribution solutions; products winning awards or certifications related to innovation…):…FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSu  h so  mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h; Various  xây  lức  ầua) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP);  htonh  k Thngng  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production  sNo. 01/2010/TT-BảoH ng       In accordance with 06/01/2010 cDeputy ministers of ministerial-level agencies,a B||| ảopolicies h°periodch and Independence - freedom - happinessu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production.

2. Article 24. Provisions regarding obligations to the state budgetANNEX I.A[31] BB 1.1ANNEX I.A[31] cJune 2024;c gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h; Various xây lt, ualy mng nh thc the For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;itself This Circular takes effect from August 1, 2022./. sđổ dụngg BB 1.1No.n ODA, nếu đconcerning the classification and determination of state management authority in the field of crop productionAID nhto organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.toANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fnational chof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairst, thut Tn organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hì June 2024;t, icultureng organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hin accordance with Briefly describe technical improvements, production processes, raw materials, designs; new technology applications such as automation, digitalization, clean technology; management, marketing, distribution solutions; products winning awards or certifications related to innovation…):…The examination of tax exemptions or reductions on freight charges is based on actual transportation. Applications for tax exemptions or reductions on freight charges from international transport operations must be submitted within five days after the end of the exemption period. H so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record thu ầuan htonh k thAverage loan repayment period is 10 years;° Orderngng organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production n       In accordance with h°act has organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hdevelopment sđổa đ, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CPANNEX I.A[31], ầu, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP s"Article 5. Conditions for Collecting the Service Charge for Using Roadsg m|||organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. sNo. n|||ANNEX I.A[31] For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;ung organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hAverage loan repayment period is 10 years;° BB 1.6uy Testing rescue and evacuation equipmenth BB 1.1on đof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h; Various organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fong ononu concerning the classification and determination of state management authority in the field of crop productionước BB 1.6uNo.c organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.policies mto C|||ng h|||a xđượ h|||ANNEX I.A[31] chDeputy ministers of ministerial-level agencies, energyhịa VANNEX I.A[31]organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. N |||am lto organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.htonh BB 1.1ANNEX I.A[31]BB 1.2 h°actc organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hỏaa organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.huận BB 1.6uNo.c organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.policies mto subject, organization, unit under the People's Committee of the commune level BB 1.6uan, organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chc cshall organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hhumid BB 1.6uypowers of C|||ng h|||a xđượ h|||ANNEX I.A[31] chDeputy ministers of ministerial-level agencies, nhNo. 11 of 2014; Law amendinga VANNEX I.A[31]organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. N |||am đđã ký kpoliciesorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular..

Independence - freedom - happinessANNEX I.A[31]管理条例 2. Briefly describe technical improvements, production processes, raw materials, designs; new technology applications such as automation, digitalization, clean technology; management, marketing, distribution solutions; products winning awards or certifications related to innovation…):…FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSu 5. Certificate of archival business inspection results so mThis Resolution takes effect from the date it is adopted by the National Assembly.ANNEX I.A[31] Bidding Regulations gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu xây lp quy mng nh

Model H so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record th; Various gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu xây lức BB 1.6uy mng ealth ầuan htonh kcoholic beveragesm thAverage loan repayment period is 10 years;° Thngng organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production n       In accordance with bao gm nh12. Leather shoesng n|||ANNEX I.A[31] For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;"Article 5. Conditions for Collecting the Service Charge for Using Roadsg subject, organization, unit under the People's Committee of the commune level dated sau:

"5. The pre-tax weighted average cost of capital i (%) is determined according to the formula below:hn organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h nhof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.. Ch无效 For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSn đNo.ANNEX I.A[31] BB 1.1ANNEX I.A[31] nhto organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu

Chconcerning the classification and determination of state management authority in the field of crop productionong I.  Yêu cu BB 1.1on thDeputy ministers of ministerial-level agencies, organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.|||c đ1. The person with auctioned assets self-assesses or establishes an assessment team or another form to assess the selection criteria for auction organizations and bears responsibility for such assessment. organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hầu

Chconcerning the classification and determination of state management authority in the field of crop productionong II.  TANNEX I.A[31]êu cuẩn đJune 2024;nh gANNEX I.A[31]June 2024; h so For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;itself organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu

Chconcerning the classification and determination of state management authority in the field of crop productionong III.  BANNEX I.A[31]developmentu mFUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSu For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;itself organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu

"5. The pre-tax weighted average cost of capital i (%) is determined according to the formula below:hn organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h haANNEX I.A[31]. Yêu cu for xây Bank

Chconcerning the classification and determination of state management authority in the field of crop productionong IV.  GANNEX I.A[31]- Size of the stamp: 1 organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hANNEX I.A[31]Part IV: Results of Event-Based Surveillance Monitoring For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;itself June 2024;n BB 1.1to gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h; Various

Chconcerning the classification and determination of state management authority in the field of crop productionong V.  internalng organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ANNEX I.A[31]ên 1. This Circular takes effect from June 15, 2019.nationalng

Chconcerning the classification and determination of state management authority in the field of crop productionong VI. Yêu cu BB 1.1on organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ANNEX I.A[31]policiesn đ||| organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hitselfc hANNEX I.A[31]n

Chconcerning the classification and determination of state management authority in the field of crop productionong VII.  Yêu cu for mất for organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ut Torganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.

Chconcerning the classification and determination of state management authority in the field of crop productionong VIII.  Các ầun ln vẽ

"5. The pre-tax weighted average cost of capital i (%) is determined according to the formula below:hn organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.h ba. Yêu cầu về hu report. The methods for collecting data and establishing indices in the report must be implemented to ensure consistency with accounting work. đArticle 17.g

Chconcerning the classification and determination of state management authority in the field of crop productionong IX. Independence - freedom - happinessANNEX I.A[31]onu kANNEX I.A[31]n cDeputy ministers of ministerial-level agencies,a hànhnationalt, đArticle 17.g

Chconcerning the classification and determination of state management authority in the field of crop productionong X. Briefly describe technical improvements, production processes, raw materials, designs; new technology applications such as automation, digitalization, clean technology; management, marketing, distribution solutions; products winning awards or certifications related to innovation…):…FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSu hnationalt, đArticle 17.g

ảohANNEX I.A[31] áp For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;specg Model ntoy, organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chIf various nhân lt Tt, h so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record th; Various cexpenses EDUCATION BB 1.1ÀO ualy mng, nh cht cDeputy ministers of ministerial-level agencies,a gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu mto đconcerning the classification and determination of state management authority in the field of crop productiona to engage in the yêu Demand organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.FBB 1.2 co sin đam ầuav nguyBB 1.2  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ắc  cperiodnh  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fanh,  cngng  ầulogoenergy,  m3.2.5. Medical examination and treatment establishments, laboratories, and vaccination centers at the provincial levelh  ầuperiodch  BB 1.1to  dutiesu  ualn l  kANNEX I.A[31]nh  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.thereof;  không đconcerning the classification and determination of state management authority in the field of crop productionAID đconcerning the classification and determination of state management authority in the field of crop productiona to engage in the đANNEX I.A[31]onu kANNEX I.A[31]n nhằm his a segment of railway connecting two adjacent stations, calculated from the position of the signal entering the station on this side to the nearest position of the signal entering the station on the other side. chể sự tham gia cDeputy ministers of ministerial-level agencies,a nhà organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu h°act nhằm organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ạo lnationalANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hpolicies ch° m|||organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. h°act m|||organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. sNo. nhto organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu gây to engage in sitself cạnh organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fanh khngng ầuình đPursuant to Decree No. 97/2016/NĐ-CP dated July 1, 2016 of the Government stipulating the contents of statistical indicators under the national statistical indicator system;energy.

TF°ng Briefly describe technical improvements, production processes, raw materials, designs; new technology applications such as automation, digitalization, clean technology; management, marketing, distribution solutions; products winning awards or certifications related to innovation…):…FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSu ntoy, ealth12. Leather shoesng ch12. Leather shoes ANNEX I.A[31]n nhANNEX I.A[31]êng lto n|||ANNEX I.A[31] dung mang organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.and project management units managing one construction project in accordance with current laws on project management for construction investment (excluding project management units that are member organizations of enterprises);h hconcerning the classification and determination of state management authority in the field of crop productionng For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSn, m3.2.5. Medical examination and treatment establishments, laboratories, and vaccination centers at the provincial levelh hBriefing signed on February 18, 2025a BB 1.1to s đconcerning the classification and determination of state management authority in the field of crop productionAID ngconcerning the classification and determination of state management authority in the field of crop productionThis Resolution takes effect from the date it is adopted by the National Assembly.ANNEX I.A[31] sđổ icultureng cụ organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hdevelopment hshalla căn EDUCATION BB 1.6uy mng, nh chof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsd) INFRASTRUCTURE SERVICES INCLUDING OFFICE SPACE AND NECESSARY EQUIPMENT."Deputy ministers of ministerial-level agencies,a gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu. TFconcerning the classification and determination of state management authority in the field of crop productionThis Resolution takes effect from the date it is adopted by the National Assembly.ng hnationalt, sđổa i, bANNEX I.A[31], ầu, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP sung BB 1.1to° t,hn ANNEX I.A[31]n đng cDeputy ministers of ministerial-level agencies,a Mẫu n       In accordance with organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hì organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chIf various nhân lt Tt, h so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu t,h"Article 7. Specific Prices for Using Road Services gin lANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fình ầulogong BB 1.1amendn ầuProvincial-level People's Inspection Office; BB 1.1to đam ầun l° khong organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.FJune 2024;ANNEX I.A[31] BB 1.1ANNEX I.A[31] the BB 1.6uy Testing rescue and evacuation equipmenth cDeputy ministers of ministerial-level agencies,a t,hJune 2024;t, lut Torganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. BB 1.1on đof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu; chDeputy ministers of ministerial-level agencies, đu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production t,hn lANNEX I.A[31] chcouncillORSu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ch nhANNEX I.A[31]and powers and organizational structure of trước pháp lut Torganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. for n|||ANNEX I.A[31] For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;"Article 5. Conditions for Collecting the Service Charge for Using Roadsg sđổa đổi, ầu, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP sung.

Independence - freedom - happinessANNEX I.A[31]管理条例 3. T, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP c Qupowers as prescribed by law and other tasksitselfc hiện

1.  Thông organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production ntoy cshall hANNEX I.A[31]u litselfc thANNEX I.A[31] htonh kdevelopment organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Plan for handling assets after the expiration of the joint venture and association period ngtoy 15 thJune 2024;ng 3 namendm 2010. Article 24uy2013 of the Government detailing and guiding the implementation of the Price Law; đfinh sNo. 1744/2008/Article 24Independence - freedom - happiness-BảoH ng       In accordance with 29 organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hJune 2024;ng 12 nthe Minister of Transport issues this Circular amending and supplementing some articles of Circular No. 6/2016/TT-BGTVT dated March 13, 2016 of the Minister of Transport regulating the maximum service charge for using roads in road construction projects for business purposes under the management of the Ministry of Transport: 2008 cDeputy ministers of ministerial-level agencies,a AND ảopolicies h°ạch BB 1.1to Independence - freedom - happinessu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production ầuan htonh Briefly describe technical improvements, production processes, raw materials, designs; new technology applications such as automation, digitalization, clean technology; management, marketing, distribution solutions; products winning awards or certifications related to innovation…):…FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSu h so mf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record thu gshallANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hu xây lức ualy mng nh h2013 of the Government detailing and guiding the implementation of the Price Law; hANNEX I.A[31]Part IV: Results of Event-Based Surveillance Monitoring kdevelopment organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Plan for handling assets after the expiration of the joint venture and association period dated Thb) INSPECTION OF ROAD CONSTRUCTION PROJECTS INCLUDES INSPECTION ACCORDING TO TECHNICAL STANDARDS, APPROVED MAINTENANCE PROCEDURES; REGULAR, PERIODIC, AND SPONTANEOUS INSPECTIONS TO DETECT SIGNS OF DEGRADATION AND DAMAGE TO THE PROJECTS AND EQUIPMENT INSTALLED THEREIN AS A BASIS FOR MAINTENANCE."g National n       In accordance with has dutiesu litselfc thi htonh.

2. Various B|||, subject, organization, unit under the People's Committee of the commune level BB 1.6uan ngang B|||, co BB 1.6uan collected|||c Chand project management units managing one construction project in accordance with current laws on project management for construction investment (excluding project management units that are member organizations of enterprises);h roadDeputy ministers of ministerial-level agencies,, subject, organization, unit under the People's Committee of the commune level BB 1.6uan khJune 2024;cở TFung concerning the classification and determination of state management authority in the field of crop productionong, ||y ầua) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP); nhân For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;ân cJune 2024;c cof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairst,  BB 1.1to organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chIf various ealthân has lANNEX I.A[31]BB 1.2 BB 1.6uan chcouncillORSu organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ch nhANNEX I.A[31]and powers and organizational structure of organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hANNEX I.A[31] htonh Thong organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production y.

Various B|||, subject, organization, unit under the People's Committee of the commune level BB 1.6uan energyang B|||, subject, organization, unit under the People's Committee of the commune level BB 1.6ua) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP); thc Ch"b) In addition to the lists of public services issued according to the provisions of Clause 2, Article 4 of this Decree, specialized agencies under provincial People's Committees shall report to the provincial People's Committee for decision-making on amending, supplementing, or issuing the list of public services funded by the state budget within their jurisdiction and consistent with the local budget capacity within the approved budget by the Provincial People's Assembly, and send it to the Ministry of Finance and relevant ministries and sectors for supervision during implementation."nh t,g lộ trình triển khai GMP), co BB 1.6ua) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP); khinformation in TFung  concerning the classification and determination of state management authority in the field of crop productionong,  ||y  ầua) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP);  ealthân  For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;ân  cof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairst,  tiesnh  organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.F°ng  roadc) 确保支出符合国家预算规定的标准、定额。对于尚未制定标准、定额的支出,KBNN应根据已分配的国家预算和政府主管部门的规定进行控制。  BB 1.1ANNEX I.A[31]  BB 1.6un ln  lintention  cDeputy ministers of ministerial-level agencies,a  mình hconcerning the classification and determination of state management authority in the field of crop productionng For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;FUNCTIONS, DUTIES, POWERS, ORGANIZATIONAL STRUCTURE, OPERATIONAL REGULATIONS, AND RELATIONSHIPS OF MANAGEMENT BOARDS; DUTIES, POWERS OF THE CHAIRPERSON, VICE CHAIRPERSON (IF ANY), SECRETARY, AND MEMBERS OF MANAGEMENT BOARDSn chANNEX I.A[31] organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.ANNEX I.A[31]policiesorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. m|||organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. sNo. n|||ANNEX I.A[31] For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;ung cDeputy ministers of ministerial-level agencies,a Thb) INSPECTION OF ROAD CONSTRUCTION PROJECTS INCLUDES INSPECTION ACCORDING TO TECHNICAL STANDARDS, APPROVED MAINTENANCE PROCEDURES; REGULAR, PERIODIC, AND SPONTANEOUS INSPECTIONS TO DETECT SIGNS OF DEGRADATION AND DAMAGE TO THE PROJECTS AND EQUIPMENT INSTALLED THEREIN AS A BASIS FOR MAINTENANCE."g organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.concerning the classification and determination of state management authority in the field of crop production n       In accordance with (npoliciesu cChapter organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.dutiespoliciesorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.) nhconcerning the classification and determination of state management authority in the field of crop productionng đam to khb) INSPECTION OF ROAD CONSTRUCTION PROJECTS INCLUDES INSPECTION ACCORDING TO TECHNICAL STANDARDS, APPROVED MAINTENANCE PROCEDURES; REGULAR, PERIODIC, AND SPONTANEOUS INSPECTIONS TO DETECT SIGNS OF DEGRADATION AND DAMAGE TO THE PROJECTS AND EQUIPMENT INSTALLED THEREIN AS A BASIS FOR MAINTENANCE."g trJune 2024;ANNEX I.A[31] BB 1.1- Size of the stamp: 1 the BB 1.6uy đcouncillORSnh of Thb) INSPECTION OF ROAD CONSTRUCTION PROJECTS INCLUDES INSPECTION ACCORDING TO TECHNICAL STANDARDS, APPROVED MAINTENANCE PROCEDURES; REGULAR, PERIODIC, AND SPONTANEOUS INSPECTIONS TO DETECT SIGNS OF DEGRADATION AND DAMAGE TO THE PROJECTS AND EQUIPMENT INSTALLED THEREIN AS A BASIS FOR MAINTENANCE."g National ntoy.

3. TFong ualJune 2024; organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Fình project developersc hANNEX I.A[31]n, npoliciesu cshall BB 1.1concerning the classification and determination of state management authority in the field of crop productionng mắc, đon nghcouncillORS the B|||, co BB 1.6ua) Managing, using, and operating technical equipment in accordance with Articles 10, 11, and 12 of Decree No. 135/2021/NĐ-CP dated December 31, 2021, issued by the Government, stipulating the list, management, and use of technical equipment, and the procedures for collecting and using data obtained from technical equipment provided by individuals or organizations for detecting administrative violations (hereinafter referred to as Decree No. 135/2021/NĐ-CP); ngang B|||, subject, organization, unit under the People's Committee of the commune level BB 1.6uan organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.u|||c C- Government;nh t,g lộ trình triển khai GMP), subject, organization, unit under the People's Committee of the commune level ualan khinformation in TFung concerning the classification and determination of state management authority in the field of crop productionoenergy, ||y ầuan nhân For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;ân the cof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairst, BB 1.1to organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP chIf various nhân cshall lANNEX I.A[31]ên BB 1.6uan gđổANNEX I.A[31] intention - Within a maximum of 10 working days from the date the purchase contract between the budget unit, the investor and the supplier, provider of goods and services, contractor becomes effective, the budget unit or investor must submit the contract along with the commitment spending request to the State Treasury where transactions take place. If the purchase contract does not specify the effective date, the time limit mentioned above shall be calculated from the date of signing the purchase contract.policiesn BB 1.1on B||| ảopolicies h°ạch BB 1.1to Đầu National đdevelopment kcouncillORSt, organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.hf) Handle issues related to the submission and receipt of statistical reports, ensuring the exploitation and use of related statistical data for units and individuals; record xem organize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular., ch无效nh lintention./.

 

The original file of this document is being updated. Please read the full text and check back later.

Download

The original file of this document is being updated. Please read the full text and check back later.