Circular No. 03/2016/TT-BTC stipulates the fee rates, collection procedures, payment, management, and utilization for the Kênh Tắt ferry and the Láng Sắt ferry on National Highway 53. This document applies to drivers of motor vehicles and similar types of vehicles on roadways.
적용 범위
Drivers of motor vehicles and similar types of vehicles
핵심 사항
- Drivers of two-wheeled motorcycles, two-wheeled motorbikes, and similar types of vehicles must pay a ferry fee of 4,000 VND per trip or 120,000 VND per month (Article 2).
- Three-wheeled motorcycles, tricycles, three-wheeled cargo vehicles, and similar types of vehicles must pay a ferry fee of 5,000 VND per trip (Article 2).
- Passenger cars with fewer than 12 seats, xe lam, and similar types of vehicles must pay a ferry fee of 25,000 VND per trip (Article 2).
- Passenger buses with 12 to under 15 seats must pay a ferry fee of 30,000 VND per trip (Article 2).
- Cargo trucks with a load capacity from 15 tons to under 18 tons, and 20-foot container trucks must pay a ferry fee of 80,000 VND per trip (Article 2).
🌐 이 문서의 사회적 영향
- Drivers of motor vehicles and similar types of vehicles will incur additional costs when using ferry services.
- Ferry management units have stable revenue sources to maintain operations and repair ferry bridges.
❓ 자주 묻는 질문
What is the ferry fee for two-wheeled motorcycles?
4,000 VND per trip or 120,000 VND per month.
What is the ferry fee for cargo trucks with a load capacity from 5 tons to under 10 tons?
55,000 VND per trip.
전문
|
MINISTRY OF FINANCE |
SOCIALIST REPUBLIC OF VIET NAM |
|
Provincial People's Committees set specific pricesNo.03/2016/TT-BTC |
Hanoi, January 8, 2016 |
CIRCULAR
REGULATIONS ON THE LEVEL OF COLLECTION, COLLECTION SYSTEM, PAYMENT, MANAGEMENT AND USE OF FEES FOR THE KÊNH TẮT FLOAT BRIDGE AND LÁNG SẮT RAILWAY FLOAT BRIDGE, NATIONAL ROUTE 53
Pursuant to the Ordinance on Fees and Charges No. 38/2001/PL-UBTVQH10 dated August 28, 2001;No. Pursuant to the Decree No. 57/2002/NĐ-CP dated June 3, 2002; Decree No. 24/2006/NĐ-CP dated March 6, 2006 of the Government detailing the implementation of the Ordinance on Fees and Charges;
Pursuant to the Decree No. 215/2013/NĐ-CP dated December 23, 2013 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Finance;y The Minister of Finance promulgates this Circular regulating the level of collection, collection system, payment, management and use of fees for the KÊNH TẮT FLOAT BRIDGE and LÁNG SẮT RAILWAY FLOAT BRIDGE, National Route 53 as follows:
Article 1. Persons Paying FeescouncillORS Persons paying fees for the KÊNH TẮT FLOAT BRIDGE and LÁNG SẮT RAILWAY FLOAT BRIDGE, National Route 53 are drivers of motor vehicles and similar vehicles.
At the proposal of VThis Circular also promulgates the Fee Collection Rate Table for the KÊNH TẮT FLOAT BRIDGE and LÁNG SẮT RAILWAY FLOAT BRIDGE."b) In addition to the lists of public services issued according to the provisions of Clause 2, Article 4 of this Decree, specialized agencies under provincial People's Committees shall report to the provincial People's Committee for decision-making on amending, supplementing, or issuing the list of public services funded by the state budget within their jurisdiction and consistent with the local budget capacity within the approved budget by the Provincial People's Assembly, and send it to the Ministry of Finance and relevant ministries and sectors for supervision during implementation."in food safety and hygiene work.
Article 3. Exemption, Reduction, Management and Use of Fees
1. The exemption, reduction, management and use of fees for the KÊNH TẮT FLOAT BRIDGE and LÁNG SẮT RAILWAY FLOAT BRIDGE, National Route 53 shall be implemented according to the provisions of Circular No. 110/2014/TT-BTC dated August 15, 2014 of the Ministry of Finance guiding the collection, payment, management and use of float bridge fees.
2. Other contents related to registration, declaration, collection, payment, management, use, and publicizing the fee collection rate for the KÊNH TẮT FLOAT BRIDGE and LÁNG SẮT RAILWAY FLOAT BRIDGE not stipulated in this Circular shall be implemented according to the guidance provided in Circular No. 63/2002/TT-BTC dated July 24, 2002 of the Ministry of Finance guiding the implementation of laws and regulations on fees and charges, Circular No. 45/2006/TT-BTC dated May 25, 2006 amending and supplementing Circular No. 63/2002/TT-BTC dated July 24, 2002, Circular No. 156/2013/TT-BTC dated November 6, 2013 of the Ministry of Finance guiding the implementation of certain provisions of the Law on Tax Administration; the Law Amending and Supplementing Certain Provisions of the Law on Tax Administration and Decree No. 83/2013/NĐ-CP dated July 22, 2013 of the Government, Circular No. 153/2012/TT-BTC dated September 17, 2012 of the Ministry of Finance guiding the printing, issuance, management and use of various types of receipts for fees and charges under the state budget, Circular No. 110/2014/TT-BTC dated August 15, 2014 of the Ministry of Finance guiding the collection, payment, management and use of float bridge fees and other relevant documents.
Article 2. Level of Collection
2. During the implementation process, if there are any difficulties, organizations and individuals are requested to report to the Ministry of Finance for further guidance and supplementation. Provincial People's Committees set specific prices- National Assembly Office;
- Supreme People's Procuratorate;
- Inspectorate of Ministries, Agencies under the Government;
- Government Portal;policies - Ministry of Finance, Provincial Tax Department, State Treasury of Tra Vinh Province; Provincial People's Committees set specific prices- Legal Document Inspection Department;, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CPFEE COLLECTION RATE TABLE FOR THE KÊNH TẮT FLOAT BRIDGE AND LÁNG SẮT RAILWAY FLOAT BRIDGE, NATIONAL ROUTE 53, amended and supplemented by Decree No. 109/2025/NĐ-CP and Decree No. 193/2025/NĐ-CP, supplementing (if any).
Article 4. Organization of Implementation
1. This Circular takes effect from March 1, 2016.
(Attached to Circular No. 03/2016/TT-BTC dated January 8, 2016 of the Ministry of Finance)
|
Place of Receipt: |
DEPUTY MINISTER |
Buses with 15 seats up to less than 30 seats
Buses with 30 seats up to less than 50 seats/201Buses with 50 seats up to less than 100 seats
|
Provincial People's Committees set specific pricesố tt |
Buses with 100 seats and above |
Unit of Measurement |
Rate of Collection |
|
1 |
Cargo vehicles with a load capacity of less than 3 tonsắCargo vehicles with a load capacity of 3 tons up to less than 5 tons Cargo vehicles with a load capacity of 5 tons up to less than 10 tons Cargo vehicles with a load capacity of 10 tons up to less than 15 tons |
Renting the entire float bridge type 60 tons |
120.000 |
|
2 |
VND/trip |
đồRenting the entire float bridge type 100 tons |
5.000 |
|
3 |
VND/trip |
đồRenting the entire float bridge type 100 tons |
25.000 |
|
4 |
Note: The fee collection rates mentioned above apply separately at each ferry station: KÊNH TẮT FLOAT BRIDGE, LÁNG SẮT RAILWAY FLOAT BRIDGE.policies đpoliciesn under 15 hourspolicies energyồi |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
30.000 |
|
5 |
Passenger vehicles from 15 hourspolicies đpoliciesn under 30 hourspolicies energyồi |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
40.000 |
|
6 |
Passenger vehicles from 30 hourspolicies đpoliciesn under 50 hourspolicies energyồi |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
45.000 |
|
7 |
Passenger vehicles from 50 hourspolicies energyồi and above |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
50.000 |
|
8 |
Cargo vehicles with load capacity under 3 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home AffairsFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
40.000 |
|
9 |
Cargo vehicles with load capacity from 3 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsa) Units base on the accounting account system issued in this Circular to apply appropriate accounting accounts suitable for their activities.policiesn under 5 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home AffairsFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
45.000 |
|
10 |
Cargo vehicles with load capacity from 5 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsa) Units base on the accounting account system issued in this Circular to apply appropriate accounting accounts suitable for their activities.policiesn under 10 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home AffairsFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
55.000 |
|
11 |
Cargo vehicles with load capacity from 10 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairsa) Units base on the accounting account system issued in this Circular to apply appropriate accounting accounts suitable for their activities.policiesn under 15 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home AffairsFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
70.000 |
|
12 |
Cargo vehicles with load capacity from 15 tons to under 18 tons, container vehicles 20 feet specialized agency under the People's Committee of the province/city.ontainer 20 feet |
Cargo vehicles with a load capacity of 15 tons up to less than 18 tons, 20-foot container vehicles |
80.000 |
|
13 |
Rent entire ferrypoliciesn ferry type 60 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home AffairsFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
đồng/ferrypoliciesFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
100.000 |
|
14 |
Rent entire ferrypoliciesn ferry type 100 tonsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home AffairsFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
đồng/ferrypoliciesFor power plants invested under the Build-Operate-Transfer (BOT) model, n is determined according to the operational period of the power plant stipulated in the BOT contract. |
200.000 |
Note: The fee levels stated above apply separately at each ferry terminal: Kênh Tắt ferry, Láng ferry Provincial People's Committees set specific pricescut.
원본 문서(PDF)
관계도
문서를 클릭하면 열립니다. 빨간 테두리=효력을 변경하는 관계.
번역본
이 문서는 다음 언어로 제공됩니다: