Circular No. 04/2004/TT-BXD guiding the implementation of Decision No. 78/2004/QĐ-TTg dated May 7, 2004 of the Prime Minister on adjusting and supplementing some mechanisms and policies to accelerate the construction progress of residential clusters and housing in the flood-prone provinces of the Mekong Delta.

Circular No. 04/2004/TT-BXD guiding the implementation of Decision No. 78/2004/QĐ-TTg on the construction of residential clusters and housing in the flood-prone provinces of the Mekong Delta, including technical infrastructure planning, embankment construction for existing residential areas, compaction factor when raising the ground level, and management and use of clusters after investment.

Document No.04/2004/TT-BXD
Document typeCircular
Issuing authorityMinistry of Construction
Signed byNguyễn Hồng Quân — Bộ trưởng
Updated30/06/2026
SectorConstruction
FieldUncategorized
Issued date07/07/2004
Effective date03/08/2004
Expiry date
StatusIn effect
✦ Smart summary

Circular No. 04/2004/TT-BXD guiding the implementation of Decision No. 78/2004/QĐ-TTg on the construction of residential clusters and housing in the flood-prone provinces of the Mekong Delta, including technical infrastructure planning, embankment construction for existing residential areas, compaction factor when raising the ground level, and management and use of clusters after investment.

Scope of application

The flood-prone provinces of the Mekong Delta, particularly An Giang, Dong Thap, Long An, Kien Giang, Hau Giang, Vinh Long, Tien Giang, and Can Tho.

Key points

  • Essential technical infrastructure facilities in residential clusters include internal transportation, electricity supply, potable water supply, drainage, and environmental sanitation. These projects must meet requirements regarding construction area and investment capital.
  • Embankment construction for existing residential areas must be consistent with local irrigation planning and flood control measures, with the width of the embankment face not exceeding 2.5 meters, the width of the embankment base not exceeding 4.5 meters, and the height of the embankment not exceeding 2 meters.
  • The compaction factor when raising the ground level of residential clusters must not be lower than 0.85 (K $ 0.85).
  • Provincial People's Committees need to issue regulations on cluster management to protect the environment and implement cultural living standards.
  • Localities may construct durable technical infrastructure projects but must ensure compliance with the schedule set forth in Decision No. 78/2004/QĐ-TTg.

🌐 Social impact of this document

  • To improve the quality of life for residents in flood-prone areas through the construction of technical and social infrastructure.
  • To continue accelerating the construction progress of residential clusters, reduce flooding, and improve living conditions for residents.
  • To impose financial burdens on localities when mobilizing funds for the construction of technical infrastructure.
  • There needs to be close coordination among management agencies to ensure effective use of resources.

❓ Frequently asked questions

What does essential technical infrastructure in residential clusters include?

Essential technical infrastructure includes internal transportation, electricity supply, potable water supply, drainage, and environmental sanitation.

What must embankment construction for existing residential areas ensure?

The width of the embankment face must not exceed 2.5 meters, the width of the embankment base must not exceed 4.5 meters, and the height of the embankment must not exceed 2 meters.

What must the compaction factor when raising the ground level of residential clusters not be lower than?

The compaction factor must not be lower than 0.85 (K $ 0.85).

What regulations on cluster management should provincial People's Committees issue?

Issue regulations on cluster management as a basis for commune and ward People's Committees to organize management to ensure safety and implement cultural living standards.

How can localities construct durable technical infrastructure projects?

Localities may construct durable technical infrastructure projects but must ensure compliance with the schedule set forth in Decision No. 78/2004/QĐ-TTg.

Full text

MINISTRY OF CONSTRUCTION
******

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
********

Number: 04/2004/TT-BXD

Hanoi, July 7, 2004

 CIRCULAR

Guidelines for Implementing Decision 78/2004/QD-TTg dated May 7, 2004 of the Prime Minister on Adjusting and Supplementing Certain Mechanisms and Policies to Accelerate the Progress of Building Community Clusters and Housing in Provinces Frequently Affected by Flooding in the Mekong Delta
_______________________________ 

Pursuant to Decision 173/2001/QD-TTg dated November 6, 2001 of the Prime Minister on Developing the Economy and Society in the Mekong Delta Region for the Period 2001-2005;

Pursuant to Decision 1548/QD-TTg dated December 5, 2001 on Investment in Raising Ground Levels Above Floods to Construct Community Clusters in Flood-Affected Areas of the Mekong Delta in 2002;

Pursuant to Decision 78/2004/QD-TTg dated May 7, 2004 of the Prime Minister on Adjusting and Supplementing Certain Mechanisms and Policies to Accelerate the Progress of Building Community Clusters and Housing in Provinces Frequently Affected by Flooding in the Mekong Delta, the Ministry of Construction provides specific guidelines for implementing Decision 78/2004/QD-TTg dated May 7, 2004 of the Prime Minister to accelerate the progress of building community clusters and housing in provinces frequently affected by flooding in the Mekong Delta as follows:

I/ ON THE CONSTRUCTION OF CRUCIAL INFRASTRUCTURE IN COMMUNITY CLUSTERS AND LINES:

1/ The crucial infrastructure in community clusters and lines includes: internal transportation, electricity supply, water supply for daily use, drainage systems, and facilities ensuring environmental sanitation within the community clusters and lines.

2/ Regarding the planning and layout of land for constructing infrastructure:

The work of planning and laying out land for constructing technical infrastructure projects in community clusters and lines must ensure a reasonable ratio between the area allocated for technical infrastructure, social infrastructure, and residential construction.

3/ On the sources of funds for investing in crucial technical infrastructure in community clusters and lines: carried out according to point b, Clause 2, Article 2 of Decision 78/2004/QD-TTg dated May 7, 2004 of the Prime Minister and the guidance of the Ministry of Finance. For the electricity system, it shall be implemented according to the program of the electric power sector.

Priority should be given to funds from integrated programs for investing in technical infrastructure and social infrastructure, especially programs for clean water and rural environmental sanitation, rural roads. Combining investment in social infrastructure within community clusters such as schools, kindergartens, health stations... to ensure a synchronized infrastructure that meets the living conditions of the people.

4/ On the scale of construction of essential technical infrastructure:

Essential infrastructure projects in community clusters and lines must meet the following minimum requirements:

a) Internal transportation roads within community clusters and lines must connect with inter-village and inter-regional roads, with a road width not exceeding 7 meters; main roads within clusters and lines have a width not exceeding 5.5 meters; other internal roads within clusters and lines have a width not exceeding 3.5 meters.

Both sides of the road should have sidewalks for walking and to accommodate technical facilities such as electricity and water installations and planting greenery.

The road base should be compacted and have a reasonable slope to ensure drainage. The road surface can be made of compacted soil mixed with sand or laid with woven mats, with a width of 2 meters.

b) The wastewater drainage system from households can be constructed using precast concrete pipes or brickwork to ensure the drainage needs of residents in the community clusters and lines.

c) The potable water supply system in community clusters and lines should be based on actual conditions to determine the water source, treatment technology, and distribution network. Water pipes should use types that meet hygiene standards and have costs suitable for local payment capacity.

d) Community clusters need to arrange garbage collection points with appropriate disposal methods to ensure environmental sanitation. Households must have septic tanks.

For localities capable of mobilizing and allocating funds, they may construct durable and high-quality technical infrastructure but must ensure the schedule to allocate households to reside according to the deadline set by the Prime Minister in Decision No. 78/2004/QD-TTg.

đ) Localities need to establish regulations on burial sites to ensure environmental sanitation and not affect community clusters and lines. It is absolutely forbidden to build graves within the boundaries of community clusters and lines.

II/ FOR THE CONSTRUCTION OF EMBANKMENTS AROUND EXISTING COMMUNITY AREAS:

To serve as a basis for determining the allocation of funds according to Article 3 of Decision 78/2004/QD-TTg dated May 7, 2004 of the Prime Minister, embankment construction must adhere to the following principles:

1/ Projects for constructing embankments around existing community areas must be included in the Program for Building Community Clusters and Housing, consistent with local and regional flood control and irrigation plans, and must be agreed upon by the Ministry of Agriculture and Rural Development.

2/ The specifications for constructing embankments around existing communities are defined as follows for fund allocation purposes: the width of the embankment top should not exceed 2.5 meters, the width of the embankment bottom should not exceed 4.5 meters, and the height of the embankment should not exceed 2 meters.

For localities capable of mobilizing additional funding, embankments can be constructed with larger specifications but must still meet the completion deadlines stipulated by the Prime Minister in Decision No. 78/2004/QD-TTg.

3/ The allocation of funds for embankment construction between central government budget and revenue from beneficiaries or other mobilized funds is specified by the Ministry of Finance.

III/ ON THE COMPACTION FACTOR WHEN RAISING THE GROUND LEVEL OF COMMUNITY CLUSTERS AND LINES:

Based on the actual conditions of community clusters and lines in the Mekong Delta region frequently affected by flooding and the requirements for construction on these clusters and lines, specialized agencies of provinces and centrally administered cities investing in community clusters require consulting organizations to determine specific compaction factors for each cluster and line in design documents, but these factors must not be lower than 0.85 (K ≥ 0.85).

IV/ ON THE MANAGEMENT AND USE OF COMMUNITY CLUSTERS AND LINES AFTER INVESTMENT:

Rural clusters and community lines are rural residential points that have been invested with technical infrastructure and social infrastructure to ensure safe and stable living conditions for households. Therefore, provincial People's Committees need to issue management regulations for clusters and community lines as a basis for commune People's Committees and wards to organize management, thereby contributing to ensuring safety, protecting the environment, implementing cultural and civilized living standards of the community. Mobilize mass movements to plant trees to protect waves and safeguard clusters, community lines, and embankments while improving the environment of these clusters and community lines.

This Circular takes effect 15 days after its publication in the Official Gazette. During implementation, if there are any difficulties, localities are requested to report to the Ministry of Construction for guidance on implementation or amendments.

Place of Receipt:
- Government Office;
- Ministries: Justice, Finance, Planning and Investment, Agriculture and Rural Development, State Bank of Vietnam, Education Support Fund, Social Policy Bank;
- Provincial People's Committees and City People's Committees: An Giang, Dong Thap, Long An, Kien Giang, Hau Giang, Vinh Long, Tien Giang, Can Tho;
- Official Gazette;
- To be filed with the Office and the Department.

THE MINISTER OF CONSTRUCTION


(Signed)



Nguyen Hong Quan

 

The original file of this document is being updated. Please read the full text and check back later.

Relations map

↑ Basis & documents that affect this document
Based on 4
302/2004/QĐ-UB Quyết định số 302/2004/QĐ-UB V/v ban hành Quy định về quản lý, sử dụng các cụm, tuyến dân cư và nhà ở vượt lũ trên địa bàn thành phố Cần Thơ In effect 56/2020/QĐ-UBND Quyết định số 56/2020/QĐ-UBND Ban hành Quy định về cao độ thiết kế cho các công trình xây dựng trên địa bàn tỉnh An Giang In effect
04/2004/TT-BXD
Circular No. 04/2004/TT-BXD guiding the implementation of Decision No. 78/2004/QĐ-TTg dated May 7, 2004 of the Prime Minister on adjusting and supplementing some mechanisms and policies to accelerate the construction progress of residential clusters and housing in the flood-prone provinces of the Mekong Delta.
In effect

Click a document to open. A red border = a relation that changes validity.