Circular No. 07/2000/TT-BXD guiding the establishment of unit prices for surveying and construction investigation costs and management of such costs

Circular No. 07/2000/TT-BXD guides the establishment of unit prices and management of costs for surveying and construction activities, specifying factors such as machine unit prices, labor costs, general expenses, land tax, and campsite fees.

文号07/2000/TT-BXD
文件类型Circular
发布机关Ministry of Construction
签署人Nguyễn Mạnh Kiểm — Bộ trưởng
更新21/06/2026
行业Construction
领域Uncategorized
发布日期12/07/2000
生效日期07/06/2000
失效日期09/10/2005
状态Expired
✦ 智能摘要

Circular No. 07/2000/TT-BXD guides the establishment of unit prices and management of costs for surveying and construction activities, specifying factors such as machine unit prices, labor costs, general expenses, land tax, and campsite fees.

适用范围

Organizations and individuals conducting surveying and construction work

要点

  • Machine unit prices are calculated based on the number of main machine shifts, budget estimate ratios for other machines, and budget estimate shift prices for machines (Article 1)
  • General expenses for surveying work amount to 70% of labor costs (Article 2)
  • Preliminary taxable income is 6% of the survey cost (Article 3)
  • The pre-tax budget estimate for survey work is established based on unit prices, volume of work, and other costs such as writing plans and reporting survey results (Annex 2, Part I)
  • Campsite fees for surveying projects outside cities and residential areas are calculated at 5% of the total value of survey work (Annex 2, Part III)

🌐 本文件的社会影响

  • Assist units conducting surveying and construction to have a legal basis for accurately preparing cost estimates
  • Strengthen management and control of costs during the survey process
  • Costs for businesses may increase if machine and labor usage are not optimized

❓ 常见问题

How is the machine unit price calculated?

Machine unit prices are calculated based on the number of main machine shifts, budget estimate ratios for other machines, and budget estimate shift prices for machines (Article 1)

What are the general expenses for surveying work?

General expenses for surveying work amount to 70% of labor costs (Article 2)

How is preliminary taxable income defined?

Preliminary taxable income is 6% of the survey cost (Article 3)

How is the post-tax budget estimate for survey work calculated?

The post-tax budget estimate for survey work is calculated by adding 10% of the pre-tax budget estimate value to the pre-tax budget estimate (Annex 2, Part II)

What are the campsite fees for surveying construction projects outside cities and residential areas?

Campsite fees are calculated at 5% of the total value of survey work (Annex 2, Part III)

全文

CIRCULAR

q=1

Where:

CVietnamese language domain namesAs above

signing and implementing AgreementsVietnamese language domain namesThe budgeted standard for the ratio of other machines to the main machine for type i survey work; percent.

Type of main machine q = 1, …, n-1, n.

Provincial People's Committees set specific pricesịqThe budgeted standard number of shifts of the main machine j for one unit volume of type i survey work; shift.

GqBudgeted cost per shift of machine q (unit price per shift); Vietnamese dong.

The cost per shift includes basic depreciation, major repair depreciation, and regular maintenance costs of the machine and equipment.

2. Common costs (Pinternational)

"5. The pre-tax weighted average cost of capital i (%) is determined according to the formula below:international =      CDepreciation of fixed assets in year i of the project xKpi                                                (6)

Where:

"5. The pre-tax weighted average cost of capital i (%) is determined according to the formula below:internationalAs above

CDepreciation of fixed assets in year i of the projectLabor costs (as above)

signing and implementing AgreementspiThe budgeted common cost ratio according to the type of survey work i; calculated at 70%.

3. Prepaid income tax (Lorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.Calculated according to current regulations at 6% of the survey cost.

 

ANNEX 2

METHOD FOR ESTIMATING THE BUDGETED PRICE OF SURVEY WORK

(Attached to Circular No./2000/TT-BXD dated month day year 2000)

I. THE BUDGETED PRICE OF SURVEY WORK BEFORE TAX IS CALCULATED AS FOLLOWS:                                      n

Dorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular. = Ginternationalx KNumber of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 years + PB + LT

                                                             i=1

Where:

Dorganize credit institutions, foreign bank branches are responsible for organizing the implementation of this Circular.The estimated survey work cost excluding value-added tax; Vietnamese dong.

GinternationalUnit price of type i survey work (according to the survey unit price issued by the province or city where the survey work is carried out); Vietnamese dong.

signing and implementing AgreementsNumber of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 yearsQuantity of type i survey work; appropriate physical units.

i: Type of survey work i=1, ..., n-1, n.

PB: Cost of preparing plans and compiling survey result reports.

LT: Campsite costs (if applicable).

Each factor is calculated as follows:

1. Survey unit price (Ginternational): Established according to the guidance method in Appendix 1 attached to Circular No./2000/TT-BXD dated month day year 2000.

2. Quantity of survey work (KNumber of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 years): Determined according to the approved survey plan by the competent authority.

3. Costs for preparing plans and compiling survey result reports (PB) are determined as follows:

For construction geological survey work, it is calculated as:

                                                                                                 n

5% Ginternational x KNumber of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 years

                                                 i=1

For topographic survey work, it is calculated as:

                                                                                                 n

                                    6% Ginternational x KNumber of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 years

                                                 i=1

4. Campsite costs for construction projects not located in cities or residential areas are calculated as:

                                                                         n

                                    5% Ginternational x KNumber of employees and workers directly involved in the joint venture and association activities of the organization over the last 03 years

                                                 i=1

II. BUDGETED PRICE OF SURVEY WORK AFTER TAX (INCLUDING VALUE-ADDED TAX)

                                                Dst= Dt (1+T)

Where:

Dst: Estimated survey work cost after tax; Vietnamese dong.

Dt: As above.

T: Value-added tax rate for survey work according to current regulations, calculated at 10% of the pre-tax estimated survey work cost; Vietnamese dong.

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

下载

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

关系图

↑ 依据及影响本文件的文件
07/2000/TT-BXD
Circular No. 07/2000/TT-BXD guiding the establishment of unit prices for surveying and construction investigation costs and management of such costs
Expired

点击文件即可打开。红色边框=改变效力的关系。