Circular No. 09/2010/TT-BTNMT stipulates economic and technical norms for the national gravity grid, applicable to relevant agencies and organizations in planning and calculating construction costs for the national gravity grid. This regulation does not directly affect ordinary citizens.
适用范围
Agencies, organizations, and individuals have the responsibility to establish plans, allocate tasks, calculate unit prices of products to prepare budgets and settle accounts for the construction of the national gravity grid using state budget funds and other related organizations and individuals.
要点
- Agencies, organizations, and individuals involved in planning and calculating construction costs for the national gravity grid.
- Labor technology norms are specified for operations such as selecting points, pouring and burying markers, building retaining walls, testing machines, gravimetric sighting, and leveling calculations for the national gravity grid.
- Material and equipment norms include usage norms for materials and tools, equipment. The electricity consumption levels of electrical tools and equipment are calculated based on their power capacity, with 8 hours of work per working day (shift).
- Economic and technical norms are set for each operation such as selecting points, pouring and burying markers, building retaining walls, testing machines, gravimetric sighting, and leveling calculations for the national gravity grid.
- The service life of tools and equipment is the expected period of use in normal production activities.
🌐 本文件的社会影响
- Positive impact: Provides a legal basis for the construction and management of the national gravity grid.
- Negative impact: May impose cost burdens on organizations and individuals implementing the construction of the national gravity grid.
❓ 常见问题
Who does this economic and technical norm apply to?
This economic and technical norm applies to agencies, organizations, and individuals responsible for establishing plans, allocating tasks, calculating unit prices of products to prepare budgets and settle accounts for the construction of the national gravity grid using state budget funds and other related organizations and individuals.
What labor operations are included in the norms?
Labor norms include operations such as selecting points, pouring and burying markers, building retaining walls, testing machines, gravimetric sighting, and leveling calculations for the national gravity grid.
How are material and equipment norms defined?
Material and equipment norms include usage norms for materials and tools, equipment. Electricity consumption levels of electrical tools and equipment are calculated based on their power capacity, with 8 hours of work per working day (shift).
What is the service life of tools and equipment?
Service life of tools: measured in months. Service life of equipment: as prescribed in joint circulars guiding budget preparation between the Ministry of Finance and the Ministry of Natural Resources and Environment.
How are technical labor rates calculated when work must be suspended due to weather conditions?
Technical labor rates when work must be suspended due to weather conditions for non-specialized technical labor are calculated at a factor of 0.25.
全文
|
MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT |
SOCIALIST REPUBLIC OF VIET NAM |
|
Number: 09/2010/TT-BTNMT |
Hanoi, July 1, 2010 |
CIRCULAR
REGULATIONS ON THE ECONOMIC AND TECHNICAL STANDARDS FOR THE NATIONAL GRAVITY NETWORK
MINISTER OF NATURAL RESOURCES AND ENVIRONMENT
Pursuant to Decree No. 12/2002/NĐ-CP dated January 22, 2002 of the Government on surveying and mapping activities;
Pursuant to Decree No. 25/2008/NĐ-CP dated March 4, 2008 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Natural Resources and Environment;
Pursuant to Circular No. 01/2009/TT-BTNMT dated January 14, 2009, issued by the Minister of Natural Resources and Environment on the regulations for the national gravity network;
At the proposal of the Director of the Vietnam National Mapping Agency, the Head of the Planning Department, and the Head of the Legal Department,
c) Enterprises may be granted permission for no more than one block out of the total three dual-frequency blocks (FDD) B
Article 1. This Circular promulgates the economic and technical standards for the national gravity network.
Article 2. This Circular takes effect from August 15, 2010.
Article 3. The Minister, Heads of Ministries equivalent to Ministries, agencies under the Government, Chairpersons of Provincial People's Committees, the Director of the Vietnam National Mapping Center, Heads of agencies under the Ministry of Natural Resources and Environment, and related organizations and individuals are responsible for implementing this Circular./.
|
Place of Receipt: |
DEPUTY MINISTER |
ECONOMIC AND TECHNICAL STANDARDS
CONSTRUCTION OF THE NATIONAL GRAVITY NETWORK
(Issued together with Circular No. 09/2010/TT-BTNMT dated July 1, 2010 of the Ministry of Natural Resources and Environment)
Part 1.
GENERAL PROVISIONS
1. Scope of Regulation: The economic and technical standards for constructing the national gravity network apply to the following tasks:
1.1. Selecting points;
1.2. Pouring and burying markers;
1.3. Building retaining walls (pouring concrete);
1.4. Testing machines;
1.5. Measuring gravity;
1.6. Calculating relative adjustments.
2. Applicability: These standards apply to agencies, organizations, and individuals tasked with establishing plans, assigning schedules, calculating unit prices to prepare budgets and final accounts for the construction of the national gravity network using state funds, and other related organizations and individuals.
3. Economic and technical standards include the following component standards:
3.1. Labor technology norms: Labor technology norms (hereinafter referred to as labor norms) are the direct labor time required to produce a product (perform a work step). The content of labor norms includes:
3.1.1. Work content: listing basic operations and main operations to perform a work step;
3.1.2. Difficulty classification: basic factors affecting the performance of a work step;
3.1.3. Staffing: specifying the number of workers and technical levels required to perform a work step;
3.1.4. Norms: specifying the direct labor time required to produce a product (perform a work step): units of measurement are individual hours or group/unit product hours. A day's work (shift) is calculated as 8 hours of work.
a) Non-productive rates are expressed in fractional form, where:
- The numerator is the technical labor rate (calculated in group hours, individual hours);
- The denominator is the general labor rate, calculated in individual hours. General laborers are hired to perform simple tasks such as transporting equipment accompanying the main machine, materials, guiding the target range, communicating, leading the way, protecting, serving measurements, digging marker pits, washing materials.
b) The technical labor rate when work must be stopped due to weather conditions is calculated at a factor of 0.25.
3.2. Material and equipment norms
3.2.1. Material and equipment norms include material usage norms and tool (equipment) usage norms.
a) Material usage norms: the quantity of materials needed to produce a product (perform a task).
b) Tool and equipment usage norms: the number of shifts (time) that direct workers need to use tools and equipment to produce a unit product (perform a task).
3.2.2. The service life of tools and equipment is the expected period of use in normal production activities, consistent with the economic and technical parameters of the tools and equipment.
a) Service life of tools: measured in months.
b) Service life of equipment: as stipulated in joint circulars guiding budget preparation between the Ministry of Finance and the Ministry of Natural Resources and Environment.
3.2.3. Electricity consumption of electric tools and equipment is calculated based on the power rating of the tools and equipment, 8 hours of work in a day shift (shift), and the usage norms of tools and equipment. The electricity level in the norm tables is calculated according to the following formula:
Electricity level = (Equipment power/hour x 8 hours x number of equipment usage shifts) + 5% loss.
3.2.4. Rates for small tools and accessories are calculated at 5% of the tool rate in the tool table.
3.2.5. Rates for minor materials and losses are calculated at 8% of the material rate in the material table.
For the task of pouring markers and building retaining walls, in addition to this rate, an additional 5% material loss rate due to transportation during construction is also calculated.
4. Abbreviations in economic and technical standards:
AbbreviationReplaces BHLĐSafety equipmentLivestockUnit of MeasurementLX3Driver grade 3KT-KTEconomics-technologyKK1Type 1 difficultyKTV10Technician grade 10KS2Engineer grade 2No.OrderPart 2.
LABOR NORMS
1. Scope of work
1.1. Selecting gravity points:
- Study technical documents; prepare thoughts, materials, supplies, and working tools;
- Move (by car) to the point location;
- Select the point, draw notes about the point, and take photos of the point location;
- Survey material sources for pouring markers and transportation means;
- Serve inspection and acceptance. Hand over results.
1.2. Pouring and burying markers:
- Study technical documents; prepare thoughts, materials, supplies, and transportation tools;
- Move (by car) to the marker location;
- Dig holes, make molds, pour markers, and engrave marker letters;
- Complete point notes;
- Remove formwork, take photos of the markers;
- Serve inspection and acceptance, hand over results.
1.3. Building retaining walls (pouring concrete):
- Study technical documents; prepare thoughts, materials, supplies, and transportation tools;
- Move (by car) to the marker location;
- Dig foundation holes, install formwork, mix and pour concrete, engrave letters, remove formwork, and take photos of the retaining wall;
- Hand over markers to local authorities;
- Serve inspection and acceptance, hand over results.
1.4. Machine testing:
- Contact work, prepare thoughts, materials, measuring books, and machinery;
- Move (by car) to the testing site;
- Inspect and maintain machines;
- Measure, calculate results; inspect and adjust measuring books;
- Serve inspection and acceptance, hand over products.
1.5. Gravity sighting measurement:
- Contact work, prepare thoughts, materials, measuring books, and machinery;
- Move (by car) to the point location;
- Inspect and maintain machines;
- Measure, calculate results; inspect and adjust measuring books;
- Serve inspection and acceptance, hand over products.
1.6. Relative adjustment calculation for the national gravity network:
- Prepare thoughts, initial data;
- Check documents;
- Rough calculation;
- Calculate adjustments; assess accuracy, draw diagrams, write technical reports;
- Serve inspection and acceptance, package, and hand over.
2. Difficulty Classification
Type 1: Plain area, along asphalt roads
Type 2: Lowland hills, plain areas, roads with many potholes, under maintenance.
Midland area, red earth road, gravel spread.
Low mountainous area, asphalt road, city, town.
Type 3: Mountainous area, winding roads with steep slopes
Type 4: High mountainous area, border, islands. Difficult to travel.
3. Staffing
No.Work KTV8KS2KS5LX3Group 1Select point31152Pour and bury marker31153Build fence wall3144Test machineAbsolute method measuring equipment set23128Relative method electronic measuring machine415Relative method optical mechanical measuring machine551115Sight measurementAbsolute method basic gravity, Class I23128Class I relative method satellite gravity electronic measuring machine6219Satellite relative method optical mechanical measuring machine10912226Relative method bottom gravity electronic measuring machine62197Error adjustment calculation224. Norms
No.List of tasks LivestockKK1Technical drawing boardKK3KK41Select gravity pointGroup/work pointBasic gravity1,381,001,671,002,001,502,401,50Class I gravity1,251,001,501,001,801,502,061,50Satellite gravity0,880,501,050,501,261,001,501,00Bottom gravity0,600,500,750,500,900,751,030,752Pour and bury markerGroup/work pointBasic gravity5,003,006,003,507,204,008,644,50Class I gravity4,002,004,802,505,763,006,913,50Satellite gravity3,402,004,082,504,903,005,883,50Bottom gravity5,003,006,003,507,204,008,644,503Construct fence (pour concrete)Group/work pointClass I and satellite4,862,005,832,507,003,008,403,50Bottom gravity5,832,507,003,008,403,5010,084,004Test machineAbsolute method measuring equipment setGroup/work equipment set6,356,00Relative method electronic measuring machineGroup/work 4 machines4,124,00Relative method optical mechanical measuring machineGroup/work 5 machines3,604,005Sight measurement (transported by car)Absolute method basic gravity equipment setGroup/work point12,708,0015,249,0018,2810,0021,9412,00Absolute method Class I gravity equipment setGroup/work point6,354,007,624,509,145,0010,976,00Relative method Class I gravity electronic machineGroup/work edge7,934,509,525,0011,425,5013,716,00Relative method satellite gravity electronic machineGroup/work edge2,723,003,263,503,924,004,704,50Relative method satellite gravity optical mechanical machineGroup/work edge3,993,004,793,505,754,006,894,50Relative method bottom gravity electronic machineGroup/work edge5,446,006,527,007,848,009,409,006Error adjustment calculation for relative gravity measurementGroup/work pointClass I gravity1,00Satellite gravity0,80Bottom gravity1,20- Testing level applies for one test of one group of machines and for a measurement period of six months. Testing electronic machines using the relative method, each group consists of four machines. Testing optical mechanical machines using the relative method, each group consists of five machines.
+ When machines are used for more than six months, additional testing levels are calculated according to the above principle.
+ When the number of machines changes, the level is recalculated proportionally.
- In cases where satellite gravity points use old coordinates, the selection point level is determined according to the provisions for the Base Geodetic Network Continuation work at the Economic and Technical Surveying Map Norms issued by Decision No. 05/2006/QĐ-BTNMT dated May 26, 2006 of the Ministry of Natural Resources and Environment.
- In cases where gravity measurements are taken using the relative method with only half the number of machines (four electronic machines or five optical mechanical machines), the level is calculated at a factor of 1.20 times the gravity measurement level.
Part 3.
STANDARDS FOR MATERIALS AND EQUIPMENT
1. Tools
1.1. Select gravity point: per point
No.List of tasks LivestockDuration (months) Basic gravity Class I gravitySatellite gravityBottom gravity1Cold-resistant protective clothingunit184,003,602,521,802Raincoatunit184,003,602,521,803Backpackunit188,007,205,043,604Plastic water bottleunit128,007,205,043,605Macheteunit120,100,100,106Flashlightunit120,250,250,200,157Areaunit360,030,030,030,038Axe (two types)unit240,020,020,020,029Rubber glovesPair62,001,801,260,9010High-top shoesPair128,007,205,043,6011Steel file boxunit481,601,441,000,7212Hard hatunit128,007,205,043,6013Plastic wrapping film 1munit91,601,441,000,7214Map tubeunit241,601,441,000,7215Protective clothingunit98,007,205,043,6016RegulationsBook480,050,050,050,0517SocksPair68,007,205,043,6018Measuring tape 50munit120,100,100,050,0519Triangular rulerunit240,050,050,030,0320Compassunit240,050,050,030,0321Road atlasBook480,030,030,030,0322Digital cameraunit480,010,010,010,01Level on difficult type 3, levels for other difficult types calculated according to the following table:
KKCoefficient 10,6920,8341,201.2. Pour and bury marker: per point
No.Tool listLivestockDuration (months) Basic gravity Class I gravitySatellite gravityBottom gravity1Cold-resistant protective clothingunit1814,4011,529,8014,402Raincoatunit1814,4011,529,8014,403Backpackunit1828,8023,0419,6028,804Plastic water bottleunit1228,8023,0419,6028,805Compassunit240,020,020,020,026Shovelunit121,401,150,981,407Flashlightunit120,500,500,500,508Axe (two types)unit240,050,050,050,059Rubber glovesPair61,401,150,981,4010High-top shoesPair1228,8023,0419,6028,8011Steel file boxunit485,764,513,925,7612Hard hatunit1228,8023,0419,6028,8013Plastic wrapping film 1mSheet95,764,513,925,7614Map tubeSheet245,764,513,925,7615Protective clothingunit928,8023,0419,6028,8016RegulationsBook480,050,050,050,0517SocksPair628,8023,0419,6028,8018Angle gaugeunit240,050,050,050,0519Triangular rulerunit240,050,050,050,0520Spadeunit121,401,150,981,4021Tin bucketunit121,401,150,981,4022Shovelunit121,401,150,981,4023Crowbarunit361,401,150,981,4024Pickaxeunit361,401,150,981,4025Hammerunit61,401,150,981,4026Smoothing boardunit31,401,150,981,4027Wire cutterunit361,401,150,981,4028Water pump 0.125unit360,050,050,050,0529Flexible hose 10munit60,050,050,050,0530Letter engraving setunit351,401,150,981,4031Levelunit240,020,020,020,0232Road atlasBook480,020,020,020,0233Digital cameraunit480,010,010,010,0134Areaunit360,050,050,050,05Level on difficult type 3, levels for other difficult types calculated according to the following table:
KKCoefficient 10,6920,8341,201.3. Build fence wall for Class I gravity, satellite gravity and bottom gravity points: per point
No.Tool listLivestockDuration (months) Class I gravity, satellite Bottom gravity1Cold-resistant protective clothingunit1811,2013,442Raincoatunit1811,2013,443Backpackunit1822,4026,884Plastic water bottleunit1222,4026,885Compassunit240,020,026Shovelunit121,121,347Flashlightunit120,500,608Axe (two types)unit240,050,059Rubber glovesPair61,121,3410High-top shoesPair1222,4026,8811Steel file boxunit485,766,9212Hard hatunit1222,4026,8813Plastic wrapping film 1mSheet95,606,7214Map tubeSheet245,606,7215Protective clothingunit922,4026,8816RegulationsBook480,050,0517SocksPair622,4026,8818Angle gaugeunit240,050,0519Triangular rulerunit240,050,0520Spadeunit121,121,3421Tin bucketunit121,121,3422Shovelunit121,121,3423Crowbarunit361,121,3424Pickaxeunit361,121,3425Hammerunit61,121,3426Smoothing boardunit31,121,3427Wire cutterunit361,121,3428Water pump 0.125unit360,050,0529Flexible hose 10munit60,050,0530Letter engraving setunit351,121,3431Levelunit240,020,0232Road atlasBook480,020,0233Digital cameraunit480,010,01Level on difficult type 3, levels for other difficult types calculated according to the following table:
KKCoefficient 10,6920,8341,201.4. Test machine: per group of machines
No.List LivestockDuration (months) Absolute method measuring equipment set Relative method electronic measuring machine Relative method optical mechanical measuring machine 1Multimeterunit360,020,01240W soldering ironunit240,020,013Box-type pressure gaugeunit240,024Fan 0.07 kWunit367,625Desk fan 0.07 kWunit367,626Adjustable wrench 7-22 mmbox480,057Crosshead screwdriverbox480,058Slotted screwdriverbox480,050,020,029Wire cuttersunit360,0210Pliersunit360,020,010,0111Thermometerunit240,010,010,0112Battery chargerunit960,500,2513C ÷ +60unit605,081,83145-pin extension cord 5munit125,081,83153-pin extension cord 5munit125,081,8316Flexible hose Ø10m60,0517Flexible hose Ø5m60,0518Cold-resistant protective clothingunit1820,328,238,6419Backpackunit1840,6416,468,6420Plastic water bottleunit1240,6416,468,6421Foam pad 40x40Sheet65,081,830,0522Foam pad 1x1.2mSheet45,081,831,4423Machine shock absorberunit65,081,831,4424Macheteunit120,050,0525Flashlightunit120,770,310,2426Folding chair for writingunit65,0813,83,7727High-top shoesPair1216,468,6428Steel file boxunit485,081,833,7729Hard hatunit1216,468,6430Plastic sheet to cover machine 5mSheet91,831,4431Plastic sheet 1mSheet95,081,837,5432Protective clothingunit940,6416,468,6433RegulationsBook480,050,050,0534Tripod standunit365,0835SocksPair616,468,641.5. Measure gravity:
- Measure basic gravity, Class I by absolute method equipment set: per point.
- Measure Class I gravity, satellite gravity by relative method electronic machine: per edge.
No.Tool list LivestockDuration (months) Absolute method basic gravity measurement Absolute method Class I gravity measurement Relative method Class I gravity electronic machine measurement 1Multimeterunit360,020,020,03240W soldering ironunit240,020,020,033Box-type pressure gaugeunit240,020,024Fan 0.70 kWunit365,482,745Desk fan 0.70 kWunit365,482,746Adjustable wrench 7-22 mmbox480,050,037Crosshead screwdriverbox480,050,038Slotted screwdriverbox480,050,030,059Wire cuttersunit360,020,0110Pliersunit360,020,010,0311Thermometerunit240,010,010,0312Battery chargerunit960,500,500,5013C ÷ +60unit6014,627,317,00145-pin extension cord 5munit1214,627,317,00153-pin extension cord 5munit1214,627,317,0016Flexible hose Ø10m60,050,0517Flexible hose Ø5m60,050,0518Cold-resistant protective clothingunit1858,5029,2532,4519Backpackunit18116,9958,5064,9020Plastic water bottleunit12116,9958,5064,9021Foam pad 40x40Sheet614,627,317,0022Foam pad 1x1.2mSheet414,627,317,0023Machine shock absorberunit614,627,317,0024Macheteunit120,050,0525Flashlightunit120,400,3126Folding chair for writingunit614,627,3146,2027High-top shoesPair12116,9958,5064,9028Steel file boxunit4814,627,317,0029Hard hatunit12116,9958,5064,9030Plastic sheet to cover machine 5mSheet914,627,314,9431Plastic sheet 1mSheet914,627,317,0032Protective clothingunit9116,9958,5064,9033RegulationsBook480,050,050,0534Tripod standunit3614,627,3135SocksPair6116,9958,5064,9036Tentunit247,3137Water pumpunit240,050,0538Grounding wirem2414,627,3139100W light bulbunit1214,627,31Level on difficult type 3, levels for other difficult types calculated according to the following table:
KKCoefficient 10,6920,8341,201.6. Error adjustment calculation for relative method gravity network measurement: per point
No.Tool list LivestockDuration (months) Class I gravity Satellite gravity Bottom gravity 1Casio calculatorunit360,050,050,052Axe (two types)unit240,050,050,053Steel file boxunit480,800,640,964Plastic wrapping film 1mSheet90,800,640,965Map tubeunit240,800,640,966Protective clothingunit91,601,281,927RegulationsBook480,030,030,03The above level applies for electronic machine error adjustment calculation, the level for optical mechanical machine error adjustment calculation is 1.50 times the above level.
2. Equipment
No.ListLivestockKK1Technical drawing boardKK3KK41Select pointper point1.1Basic gravity9-12 seat carunit0,700,851,001,20TOTAL:liters44,0044,0044,0044,00Lubricating oilliters2,202,202,202,201.2Class I gravity9-12 seat carunit0,500,600,720,86TOTAL:liters33,0033,0033,0033,00Lubricating oilliters1,651,651,651,651.3Satellite gravity9-12 seat carunit0,350,420,500,60TOTAL:liters22,0022,0022,0022,00Lubricating oilliters1,101,101,101,101.4Bottom gravity9-12 seat carunit0,250,300,360,43TOTAL:liters16,5016,5016,5016,50Lubricating oilliters0,830,830,830,832Pour and bury markerper point2.1Basic gravity9-12 seat carunit0,700,851,001,20TOTAL:liters44,0044,0044,0044,00Lubricating oilliters2,202,202,202,202.2Class I gravity9-12 seat carunit0,500,600,720,86TOTAL:liters33,0033,0033,0033,00Lubricating oilliters1,651,651,651,652.3Satellite gravity9-12 seat carunit0,350,420,500,60TOTAL:liters22,0022,0022,0022,00Lubricating oilliters1,101,101,101,102.4Bottom gravity9-12 seat carunit0,250,300,360,43TOTAL:liters16,5016,5016,5016,50Lubricating oilliters0,830,830,830,833Build fence wallper point3.1Class I gravity, satellite9-12 seat carunit0,350,420,500,60TOTAL:liters22,0022,0022,0022,00Lubricating oilliters1,101,101,101,103.2Bottom gravity9-12 seat carunit0,250,300,360,43TOTAL:liters16,5016,5016,5016,50Lubricating oilliters0,830,830,830,834Test machine4.1Absolute method measuring equipment setper equipment setMeasuring equipment setunit5,72Two 9-12 seat cars2 pieces2,00Car fuel 22 liters/100 kmliters15,00Lubricating oilliters0,75Oscillatorunit3,0EnergykW2.584.2Relative method electronic measuring machineper group of machinesElectronic machineFour units1,839-12 seat car2 pieces2,00Car fuel 22 liters/100 kmliters33,00Lubricating oilliters1,654.3Relative method optical mechanical measuring machineper group of machinesOptical mechanical machineFive units2,889-12 seat car2 pieces2,00TOTAL:liters16,50Lubricating oilliters0,835Sight measurement5.1Absolute method basic gravity measuring equipment setper pointEquipment setunit7,629,1410,9613,169-12 seat carunit0,700,851,001,20Car fuel (22 liters/100 km)liters44,0044,0044,0044,00Lubricating oilliters2,202,202,202,20Oscillatorunit7,629,1410,9613,16Optical mechanical machine2 pieces7,629,1410,9613,16EnergykW2.602.602.602.605.2Class I gravity-Absolute method:per pointEquipment setunit3,814,575,486,589-12 seat carunit0,500,600,720,86Car fuel 22 liters/100 kmliters33,0033,0033,0033,00Lubricating oilliters1,651,651,651,65Generator 3.5 l/hunit3,814,575,486,58Fuel for generatorliters106,68127,96153,44184,24Oscillatorunit3,814,575,486,58Optical mechanical machine2 pieces3,814,575,486,58-Relative methodper edgeElectronic machineEight units4,765,716,858,229-12 seat car2 pieces0,500,600,720,86TOTAL:liters66,0066,0066,0066,00Lubricating oilliters3,303,303,303,305.3Satellite gravity-Relative method electronic measuring machineper edgeElectronic machineEight units1,631,962,362,829-12 seat car2 pieces0,350,420,500,60TOTAL:liters44,0044,0044,0044,00Lubricating oilliters2,202,202,202,20-Relative method optical mechanical measuring machineper edgeOptical mechanical machineTen units2,392,873,454,139-12 seat car2 pieces0,350,420,500,60TOTAL:liters44,0044,0044,0044,00Lubricating oilliters2,202,202,202,205.4Relative method bottom gravity electronic machine measurementper edgeElectronic machineEight units3,263,924,725,649-12 seat car2 pieces0,250,300,360,43TOTAL:liters16,5016,5016,5016,50Lubricating oilliters0,830,830,830,836Error adjustment calculationper point6.1Class I gravityComputer 0.4 kWunit1,20Laser printer 0.4 kWunit0,01Photocopier 1.5 kWunit0,012.2 kilowatt air conditionerunit0,27ElectricitykW9,18Softwarecopyright1,206.3Satellite gravityComputer 0.4 kWunit0,96Laser printer 0.4 kWunit0,01Photocopier 1.5 kWunit0,012.2 kilowatt air conditionerunit0,21ElectricitykW7,23Softwarecopyright0,966.3Bottom gravityComputer 0.4 kWunit1,44Laser printer 0.4 kWunit0,01Photocopier 1.5 kWunit0,012.2 kilowatt air conditionerunit0,32ElectricitykW11,00Softwarecopyright1,44The above level applies for electronic machine error adjustment calculation, the level for optical mechanical machine error adjustment calculation is 1.50 times the above level.
3. Materials
3.1. Select gravity point: calculate for 1 point
No.Material list LivestockBasic gravity Class I gravitySatellite gravityBottom gravity1Records and documents on cadastral surveying and mapping.sheet1,001,001,001,002Small red paint can 0.3 kgbox0,100,100,100,103Brush pen for paintingunit1,001,001,001,004NotebookBook0,100,100,100,105Battery for lampPair0,200,200,200,206Wooden post (4x4x30) cmunit1,001,001,00Materials are calculated equally for all types of difficulties
3.2. Pouring and burying markers: calculate for 1 point
No.Material list LivestockBasic gravity Class I gravitySatellite gravityBottom gravity1Bronze markerunit1,001,001,001,002Battery for lampPair0,200,200,200,203Handover achievement recordsheet3,003,003,003,004NotebookBook0,100,100,100,105Black sandm31,501,201,201,506Yellow sandm30,950,700,700,957Steel binding wirekilograms0,550,400,400,5581x2 stonem31,301,001,001,3094x6 stonem30,200,200,200,2010Nails ≤ 10 cmkilograms1,000,800,801,011Fine red granite gravelm22,6412Ceramic brick 30x30Article 2. General provisions on economic and technical standards28,0013Formwork boardm30,040,040,040,0414Wood trimm30,010,010,010,0115Round steel bar φ10kilograms19,5013,0013,0019,5016Round steel bar φ12kilograms9,808,008,009,8017Cement P400kilograms650,00436,00436,00650,0018White cementkilograms1,2019Waterm30,500,300,300,5020Ink printing oilliters0,250,250,250,2521TOTAL:liters0,500,500,500,503.3. Constructing first-class gravity point retaining wall, satellite gravity point retaining wall, and bottom gravity point retaining wall: calculate for 1 point
No.Material listLivestockLevel1Battery for lampPair0,202NotebookBook0,103Black sandm31,094Yellow sandm30,3051x2 stonem30,3764x6 stonem30,057Nails ≤ 10 cmkilograms0,728Formwork boardm30,049Wood trimm30,0110Cement P400kilograms176,5011Waterm30,1312Ink printing oilliters0,2513Anti-settlement pile Φ6 length 2munit5314TOTAL:liters0,50- Material level number 13 (anti-settlement pile) is only calculated when settlement prevention is required.
- Material level for constructing first-class gravity point retaining wall and satellite retaining wall: calculated at 1.00 times the specified level above.
- Material level for constructing bottom gravity point retaining wall: calculated at 1.50 times the specified level above.
3.4. Gravity meter testing: calculate for 1 group of machines
No.Material list LivestockAbsolute method measuring equipment setRelative method electronic measuring machine Relative method optical mechanical measuring machine 1NotebookBook1,001,002Bottom gravity point notesheet8,008,003Bottom gravity result sheetsheet2,002,004A4 papergrams0,010,010,015Balancing foot cleaning fuelliters1,000,500,506Solderroll1,001,007Pine resinkilograms0,050,058Nylon ropem5,003,003,009Result calculation notebookBook1,001,0010Adjustment result sheetsheet2,002,001,0011CD-ROM discunit1,001290% alcohol0liters0,5013Acetoneliters0,5014Aircraft fuelliters0,5015Medium-sized adhesive taperoll0,1016Special lubricating oilliters0,3017Cooling waterliters10,003.5. Gravimetric sighting measurement
3.5.1. Absolute gravimetric measurement method: calculate for 1 point
No.Material listLivestockBasic gravity Class I gravity1Topographic mapsheet1,001,002CD-ROM discunit1,001,003Calculation tablesheet0,10,14Solderroll0,250,205Pine resinbox0,250,20690% alcohol0liters0,500,407Acetoneliters0,500,408Aircraft fuel type A5liters0,500,409Medium-sized adhesive taperoll0,100,1010Special lubricating oilliters0,300,2011Elevation point notesheet1,001,0012Coordinate point notesheet1,001,0013Cooling waterliters10,0010,0014Balancing foot cleaning fuelliters1,001,003.5.2. Relative gravimetric measurement method: calculate for 1 side
No.Material list LivestockClass I gravitySatellite gravityBottom gravity 1Adjustment sheetsheet2,002,003,002Large batteryPair0,203White A4 papersheet0,100,100,154Topographic mapsheet1,001,001,005Solderroll1,001,001,006Pine resinkilograms0,050,050,057Balancing foot cleaning fuelliters0,50,50,508Gravity point notesheet2,002,002,009Nylon ropem5,005,005,0010Result calculation notebookBook1,001,001,0011NotebookBook1,0012CD-ROM discunit1,001,001,003.6. Relative gravimetric measurement grid error calculation: calculate for 1 point
No.Material listLivestockLevel1Topographic mapsheet1,002Result consolidation tablesheet0,203Calculation tablesheet0,104Result calculation notebookBook0,105Handover achievement recordsheet0,306Measurement result evaluation notebookBook0,107Polygon closure diagram setsheet0,108Laser inkbox0,0019Medium-sized adhesive taperoll0,1010A4 papergrams0,05Material levels are calculated equally for all types of gravity points.