Resolution No. 13/2002/QH11 on the Plan for Building the Son La Hydropower Project

This resolution stipulates the plan for building the Son La Hydropower Project, including location, scale, investment capital, and implementation time. The National Assembly adopted this resolution on December 16, 2002.

文号13/2002/QH11
文件类型Resolution
发布机关Central Account
签署人Nguyễn Văn An — Chủ tịch
更新30/06/2026
领域Uncategorized
发布日期16/12/2002
生效日期16/12/2002
失效日期
状态In effect
✦ 智能摘要

This resolution stipulates the plan for building the Son La Hydropower Project, including location, scale, investment capital, and implementation time. The National Assembly adopted this resolution on December 16, 2002.

要点

  • Construction Location: Iot Ong Commune, Muong La District, Son La Province
  • Project Scale: Normal water level from 205 meters to 215 meters; installed capacity from 1,970 MW to 2,400 MW; annual average power generation from 7,555 million kWh to 9,209 million kWh
  • Investment Capital: From 31 trillion VND to 37 trillion VND, of which domestic capital accounts for about 70%, foreign capital accounts for about 30%
  • Number of Resettled People by 2010: From 79,000 people to 91,000 people (from 16,000 households to 18,000 households)
  • The Prime Minister directs to continue surveying and completing project documentation, deciding on the specific normal water level of the reservoir and project scale; strictly manage the project implementation process; commence construction in 2005, generate electricity from Unit 1 in 2012, and complete the project in 2015

🌐 本文件的社会影响

  • Positive Impact: Create a large energy source for the country, promote economic and social development in Northwest region.
  • Negative Impact: Affect the lives of tens of thousands of people who need resettlement.

❓ 常见问题

What are the start and completion dates for the Son La Hydropower Project?

The Prime Minister directs to commence construction in 2005, generate electricity from Unit 1 in 2012, and complete the project in 2015 (Article 2).

What is the investment capital for the Son La Hydropower Project?

Investment capital ranges from 31 trillion VND to 37 trillion VND, with domestic capital accounting for about 70%, and foreign capital accounting for about 30% (Article 1).

What is the expected annual average power generation of the Son La Hydropower Project?

Annual average power generation from 7,555 million kWh to 9,209 million kWh (Article 1).

What is the estimated number of resettled people by 2010?

From 79,000 people to 91,000 people (from 16,000 households to 18,000 households) (Article 1).

What directives did the Prime Minister issue regarding the implementation of the Son La Hydropower Project?

The Prime Minister directs to continue surveying and completing project documentation, deciding on the specific normal water level of the reservoir and project scale; strictly manage the project implementation process (Article 2).

全文

OF THE NATIONAL ASSEMBLY

SOCIALIST REPUBLIC OF VIETNAM
Independence – Freedom – Happiness

Number: 13/2002/QH11
Hanoi, December 16, 2002
RESOLUTION
On the plan for constructing the Son La Hydroelectric Project
______________________
THE NATIONAL ASSEMBLY OF THE SOCIALIST REPUBLIC OF VIETNAM
Pursuant to the Constitution of the Socialist Republic of Vietnam in 1992, amended and supplemented by Resolution No. 51/2001/QH10 dated December 25, 2001 of the National Assembly, tenth session;
Pursuant to Resolution No. 05/1997/QH10 of the 10th National Assembly, Session 2 on the criteria for national key projects submitted to the National Assembly for consideration and decision on investment policy; Resolution No. 44/2001/QH10 dated June 29, 2001 on the investment policy for the Son La Hydroelectric Plant project - a national key project;
Based on the review of Report No. 1382/CP-CN dated November 5, 2002, Proposal No. 1425/CP-CN dated November 12, 2002, Supplementary Proposal No. 1585/CP-CN dated December 11, 2002 of the Government; Report No. 81/UBKHCNMT11 dated November 9, 2002 of the Science, Technology and Environment Committee of the National Assembly and the opinions of the National Assembly deputies;
RESOLVES

Article 1: Constructing the Son La Hydroelectric Plant in accordance with the cascade hydroelectric planning of the Da River including three stages: Hoa Binh - Son La low (Pa Vinh II route) - Lai Chau (Nam Nhun route) with the following basic parameters:

1- Construction location: Iot Ong commune, Muong La district, Son La province;

2- Project scale: With normal reservoir water level from 205m to 215m, not exceeding 215m;

Installed capacity: From 1,970 MW to 2,400 MW;

Annual average power generation: From 7,555 million kWh to 9,209 million kWh;

3- Investment capital (excluding interest): From 31,000 billion VND to 37,000 billion VND, of which domestic capital accounts for about 70%, foreign capital accounts for about 30%;

4- Number of people relocated by 2010: From 79,000 to 91,000 people (from 16,000 households to 18,000 households).

Article 2: The Government is assigned to implement the project with the following requirements:

1- Based on the three tasks and five requirements set forth in Resolution No. 44/2001/QH10 of the 10th National Assembly, Session 9 and stipulated in Article 1 of this Resolution, the Prime Minister directs the continued survey, completion of the project dossier, technical design, determination of the specific normal reservoir water level and project scale ensuring absolute safety and comprehensive economic efficiency; strict management of all stages of the project implementation process; commencement of construction in 2005, first power generation in 2012, and completion of the project in 2015;

2- Complete and implement the overall plan to promote economic and social development in Northwest Vietnam, ensuring that the people who need to be relocated can settle down early and have better living conditions than their previous locations.

Article 3: Annually, the Government shall report to the National Assembly on the progress of the project implementation.

The Standing Committee of the National Assembly and the relevant agencies of the National Assembly within their functions, duties, and powers shall examine the Government's reports submitted to the National Assembly related to the project implementation situation and supervise the implementation of this Resolution.

Article 4: This Resolution takes effect from the date it is adopted by the National Assembly.

This Resolution was adopted by the National Assembly of the Socialist Republic of Vietnam, 11th term, second session, on December 16, 2002.

TM. STANDING COMMITTEE OF THE NATIONAL ASSEMBLY

CHAIRMAN

(Signed)

Nguyen Van An

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

关系图

↑ 依据及影响本文件的文件
依据 13
05/1997/QH10 Nghị quyết số 05/1997/QH10 Về tiêu chuẩn các Công trình quan trọng Quốc gia trình Quốc hội xem xét, Quyết định chủ trương đầu tư 已失效 44/2001/NQ-QH10 Nghị quyết số 44/2001/NQ-QH10 Về chủ trương đầu tư dự án nhà máy thủy điện Sơn La 生效中 40/2009/QH12 Nghị quyết số 40/2009/QH12 Về chủ trương đầu tư Dự án thủy điện Lai Châu 生效中 136/2008/QĐ-TTg Quyết định số 136/2008/QĐ-TTg Sửa đổi, bổ sung Điều 15 của Cơ chế quản lý và thực hiện Dự án thuỷ điện Sơn La ban hành kèm theo Quyết định số 207/2004/QĐ-TTg ngày 11 tháng 12 năm 2004 của Thủ tướng Chính phủ 生效中 2107/QĐ-TTg Quyết định số 2107/QĐ-TTg Về việc ban hành cơ chế quản lý và thực hiện dự án thủy điện Sơn La 生效中 43/2011/QĐ-TTg Quyết định số 43/2011/QĐ-TTg Về việc sửa đổi, bổ sung một số điều của Quy định về bồi thường, hỗ trợ và tái định cư Dự án thủy điện Sơn La ban hành kèm theo Quyết định số 02/2007/QĐ-TTg ngày 09 tháng 01 năm 2007 của Thủ tướng Chính phủ 生效中 92/QĐ-TTg Quyết định số 92/QĐ-TTg Về việc phê duyệt đầu tư Dự án thủy điện Sơn La 生效中 11/2007/QĐ-TTg Quyết định số 11/2007/QĐ-TTg Về việc sửa đổi, bổ sung một số điều về cơ chế quản lý và thực hiện Dự án thuỷ điện Sơn La ban hành kèm theo Quyết định số 207/2004/QĐ-TTg ngày 11/12/2004 已失效 31/2008/QĐ-TTg Quyết định số 31/2008/QĐ-TTg Về việc sửa đổi, bổ sung một số điều của Quy định về bồi thường, hỗ trợ và tái định cư Dự án thuỷ điện Sơn La, ban hành kèm theo Quyết định số 02/2007/QĐ-TTg ngày 09 tháng 01 năm 2007 của Thủ tướng Chính phủ 生效中 02/2007/QĐ-TTg Quyết định số 02/2007/QĐ-TTg Về việc ban hành Quy định về bồi thường, hỗ trợ và tái định cư Dự án thuỷ điện Sơn La 生效中 141/2007/QĐ-TTg Quyết định số 141/2007/QĐ-TTg Về việc sửa đổi, bổ sung một số điều của Quy định về bồi thường, hỗ trợ và tái định cư Dự án thuỷ điện Sơn La, ban hành kèm theo Quyết định số 02/2007/QĐ-TTg ngày 09 tháng 01 năm 2007 của Thủ tướng Chính phủ 生效中 31/008/QĐ-TTg Quyết định số 31/008/QĐ-TTg Về việc sửa đổi, bổ sung một số điều của Quy định về bồi thường, hỗ trợ và tái định cư Dự án thuỷ điện Sơn La, ban hành kèm theo Quyết định số 02/2007/QĐ-TTg ngày 09 tháng 01 năm 2007 của Thủ tướng Chính phủ 生效中 72/2009/QĐ-TTg Quyết định số 72/2009/QĐ-TTg Về việc sửa đổi, bổ sung một số điều của Quy định về bồi thường, hỗ trợ và tái định cư Dự án thủy điện Sơn La, ban hành kèm theo Quyết định số 02/2007/QĐ-TTG ngày 09 tháng 01 năm 2007 của Thủ tướng Chính phủ 生效中
13/2002/QH11
Resolution No. 13/2002/QH11 on the Plan for Building the Son La Hydropower Project
In effect
↓ 受本文件影响的文件
指导 7
相关 4

点击文件即可打开。红色边框=改变效力的关系。