Circular No. 13/2010/TT-BCT stipulates the method for establishing the operating cost sequence and procedures for constructing operating costs for the power system and electricity market.

Circular No. 13/2010/TT-BCT stipulates the method for establishing the operating cost sequence and procedures for constructing operating costs for the power system and electricity market to ensure transparency and fairness in electricity business operations.

Document No.13/2010/TT-BCT
Document typeCircular
Issuing authorityMinistry of Industry and Trade
Signed byĐỗ Hữu Hào — Bộ trưởng
Updated27/06/2026
SectorIndustry and Trade
FieldElectricity
Issued date15/04/2010
Effective date01/06/2010
Expiry date25/11/2021
StatusExpired
✦ Smart summary

Circular No. 13/2010/TT-BCT stipulates the method for establishing the operating cost sequence and procedures for constructing operating costs for the power system and electricity market to ensure transparency and fairness in electricity business operations.

Key points

  • The power system → shall apply the method for establishing the operating cost sequence to construct operating costs, as provided for in Article 3.
  • Organizations and individuals operating in the electricity sector → must comply with the procedures for constructing operating costs for the power system and electricity market as set forth in Article 4.
  • Operating costs for the power system → shall be determined based on factors such as scale, capacity, and operating time, according to Article 5.
  • The electricity market → must comply with regulations on constructing operating costs to ensure transparency and fairness, as per Article 6.
  • A control and monitoring system → shall be applied to ensure the accuracy of the process of establishing the operating cost sequence, pursuant to Article 7.

🌐 Social impact of this document

  • Positive: Enhances transparency in managing operating costs for the power system, helping electricity businesses operate more fairly.
  • Negative: May increase technical and human resource burdens for organizations operating in the electricity sector.

❓ Frequently asked questions

How is the method for establishing the operating cost sequence applied?

According to Article 3, the method for establishing the operating cost sequence is applied to construct operating costs for the power system. This method is based on factors specified in the document.

What procedures must organizations and individuals operating in the electricity sector comply with?

According to Article 4, organizations and individuals must comply with the procedures for constructing operating costs for the power system and electricity market as prescribed.

Operating costs for the power system are determined based on which factors?

According to Article 5, operating costs for the power system are determined based on factors such as scale, capacity, and operating time.

What regulations must the electricity market comply with regarding the construction of operating costs?

According to Article 6, the electricity market must comply with regulations on constructing operating costs to ensure transparency and fairness.

What role does the control and monitoring system play in the process of establishing the operating cost sequence?

According to Article 7, a control and monitoring system is applied to ensure the accuracy of the process of establishing the operating cost sequence.

Full text

CIRCULAR

Provisions on the method for establishing the sequence, procedures for constructing operating costs of the electricity system and the electricity market

_____________________________

The contents of the document are reflected in the attached file.

The original file of this document is being updated. Please read the full text and check back later.

Download

The original file of this document is being updated. Please read the full text and check back later.

Relations map

13/2010/TT-BCT
Circular No. 13/2010/TT-BCT stipulates the method for establishing the operating cost sequence and procedures for constructing operating costs for the power system and electricity market.
Expired

Click a document to open. A red border = a relation that changes validity.