Decision No. 186/2000/QD-BTC promulgates the toll rates for the Quan Hau Bridge on National Highway 1A.

Decision No. 186/2000/QD-BTC promulgates the toll rates for the Quan Hau Bridge - National Highway 1A applicable to vehicles from motorcycles to trucks with high load capacity. The toll rates are specifically defined for each category and include both regular tickets and monthly passes.

文号186/2000/QÐ-BTC
文件类型Decision
发布机关Ministry of Finance
签署人Phạm Văn Trọng
更新16/06/2026
领域Uncategorized
发布日期21/11/2000
生效日期01/12/2000
失效日期
状态In effect
✦ 智能摘要

Decision No. 186/2000/QD-BTC promulgates the toll rates for the Quan Hau Bridge - National Highway 1A applicable to vehicles from motorcycles to trucks with high load capacity. The toll rates are specifically defined for each category and include both regular tickets and monthly passes.

适用范围

Drivers of traffic vehicles and management units of the Quan Hau Bridge - National Highway 1A

要点

  • Motorcycles must pay a toll of VND 500 per trip or VND 7,000 per month (Article 1)
  • Cars with 12 to 30 seats and vehicles with a load capacity of 2 to less than 4 tons must pay a toll of VND 20,000 per trip or VND 300,000 per month (Article 1)
  • Trucks with a load capacity of 18 tons or more and container trucks of 40 feet or more must pay a toll of VND 70,000 per trip or VND 1,000,000 per month (Article 1)
  • This Decision takes effect from December 1, 2000, and abolishes all previous regulations that conflict with this Decision (Article 3)
  • The toll collection agency of the Quan Hau Bridge - National Highway 1A shall implement the collection, payment, and management of tolls according to the guidelines set out in Circular No. 57/1998/TT-BTC (Article 2)

🌐 本文件的社会影响

  • Citizens and businesses must pay additional costs when using the Quan Hau Bridge - National Highway 1A
  • To create revenue for the state budget from bridge tolls
  • To help manage vehicle traffic through the bridge more effectively

❓ 常见问题

What is the toll rate for motorcycles passing through the Quan Hau Bridge?

Motorcycles must pay a toll of VND 500 per trip or VND 7,000 per month.

What is the toll rate for trucks with a load capacity of 18 tons or more and container trucks of 40 feet or more?

Trucks with a load capacity of 18 tons or more and container trucks of 40 feet or more must pay a toll of VND 70,000 per trip or VND 1,000,000 per month.

When does this Decision take effect?

This Decision takes effect from December 1, 2000.

全文

MINISTRY OF FINANCE
-----------

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
-----------

Number: 186/2000/QĐ-BTC

Hanoi, November 21, 2000

 

Pursuant to …; OF THE MINISTER OF FINANCE

Regarding the issuance of toll rates for Quán Hàu Bridge - National Route 1A

-----------------------------

THE MINISTER OF FINANCE

Pursuant to Decree No. 15/CP dated March 2, 1993 of the Government on the tasks, powers, and responsibilities for state management of Ministries and ministerial-level agencies;
Pursuant to the Prime Minister's Decision No. 853/1997/CT-TTg dated October 11, 1997 on combating smuggling under new circumstances;
Pursuant to Decree No. 04/1999/NĐ-CP dated January 30, 1999 of the Government on fees and charges under the state budget;
After receiving the opinion of the Ministry of Transport (document number 3478/BGTVT-TCKT dated October 13, 2000);
At the proposal of the Director General of the Tax Department,

DECISION:

Article 1: The toll rate table for Quán Hàu Bridge - National Route 1A is hereby attached to this Decision.

The toll rates stipulated herein shall apply to the entities responsible for collection and payment as prescribed in Circular No. 57/1998/TT-BTC dated April 27, 1998 of the Ministry of Finance guiding the system of bridge and road tolls managed by the State, Circular No. 75/1998/TT-BTC dated June 2, 1998 of the Ministry of Finance guiding amendments and supplements to Point 1.d, Section A, Part IV and Point 3.n, Section I of Circular No. 57/1998/TT-BTC dated April 27, 1998 of the Ministry of Finance, and Circular No. 05/1999/TT-BTC dated January 13, 1999 of the Ministry of Finance guiding amendments and supplements to Point 3, Section I of Circular No. 57/1998/TT-BTC dated April 27, 1998.

Article 2: The toll collection agency for Quán Hàu Bridge - National Route 1A shall implement the collection, payment, and management of collected toll fees in accordance with the provisions of Circular No. 57/1998/TT-BTC dated April 27, 1998 of the Ministry of Finance guiding the system of bridge and road tolls managed by the State.

Article 3: This Decision shall take effect from December 1, 2000. All previous regulations on toll rates that conflict with the provisions of this Decision are hereby abolished.

Article 4: Organizations and individuals subject to toll payments, units assigned by the Ministry of Transport to organize toll collection for Quán Hàu Bridge - National Route 1A, and related agencies shall be responsible for implementing this Decision.

 Place of Receipt:

Ministries, ministerial-level agencies, government agencies

- People's Committee of provinces and centrally administered cities, (signed)

- Tax Department, State Treasury of Quang Binh Province,

- To be filed: Office (HC,TH), General Corporation (HC, NV4).

 

MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT

DEPUTY MINISTER

 

(Signed)

Pham Van Trong

 

 

TABLE OF TOLL RATES FOR QUÁN HÀU BRIDGE NATIONAL ROUTE 1A.
(Issued together with Decision No.: 186/2000/QĐ-BTC dated November 11, 2000 of the Minister of Finance)

No.

Object of Toll Collection

Rate of Collection

 

 

REGULAR TICKET

(VND/ticket/time)

QUARTERLY TICKET

(VND/ticket/month)

1

Motorcycles

500

7.000

2

Tricycle, tractor, farm vehicle, lotus flower vehicle

5.000

75.000

3

Passenger cars up to 11 seats, public buses, and vehicles with a load capacity under 2 tons

10.000

150.000

4

Passenger cars from 12 to 30 seats and vehicles with a load capacity from 2 to under 4 tons

20.000

300.000

5

Passenger cars from 31 seats and above and vehicles with a load capacity from 4 tons to under 10 tons

25.000

370.000

6

Vehicles with a load capacity from 10 tons to under 15 tons

30.000

450.000

7

Vehicles with a load capacity from 15 tons to under 18 tons and container trucks with a length of 20 feet and above to under 40 feet

50.000

750.000

8

Trucks with a load capacity of 18 tons and above and container trucks with a length of 40 feet and above

70.000

1.000.000

 

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

关系图

186/2000/QÐ-BTC
Decision No. 186/2000/QD-BTC promulgates the toll rates for the Quan Hau Bridge on National Highway 1A.
In effect

点击文件即可打开。红色边框=改变效力的关系。