Circular No. 22/1999/TT-BTC of the Ministry of Finance guiding the state financial management regime for non-repayable aid sources

This Circular stipulates the confirmation of aid goods and aid funds, as well as the financial management regulations for non-repayable aid sources. It includes templates for certificates confirming aid goods and aid funds, along with detailed guidance on how to declare and utilize aid sources.

Số hiệu22/1999/TT-BTC
Loại văn bảnCircular
Cơ quan ban hànhMinistry of Finance
Người kýLê Thị Băng Tâm
Cập nhật16/06/2026
NgànhUnclassified
Lĩnh vựcBudget Management
Ngày ban hành26/02/1999
Ngày áp dụng13/03/1999
Ngày hết hiệu lực08/09/2001
Tình trạngExpired
✦ Tóm lược thông minh

This Circular stipulates the confirmation of aid goods and aid funds, as well as the financial management regulations for non-repayable aid sources. It includes templates for certificates confirming aid goods and aid funds, along with detailed guidance on how to declare and utilize aid sources.

Đối tượng áp dụng

Units receiving aid from the Government, international organizations, or non-governmental organizations

Các điểm cốt lõi

  • Regulations on the confirmation of aid goods and aid funds
  • Guidance on detailing declarations of consignments and purposes of use
  • Provisions on financial management for non-repayable aid sources
  • Final account report on aid receipts and expenditures in accordance with current regulations of the Ministry of Finance
  • The transfer of assets after the completion of the project

🌐 Tác động xã hội từ văn bản này

  • Strengthening management and efficient use of aid sources
  • Minimizing risks of loss and waste during the implementation of aid programs and projects
  • Ensuring compliance with state financial laws

❓ Câu hỏi thường gặp

Which circulars does this Circular replace?

This Circular replaces Circular No. 30 TC/VT dated June 12, 1997; No. 137/1998/TT/BTC dated October 19, 1998 of the Ministry of Finance.

What should units do if they encounter difficulties during implementation?

If there are difficulties, units need to promptly reflect them to the Ministry of Finance for research and resolution.

Toàn văn

MINISTRY OF FINANCE
********

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
********

Number: 22/1999/TT-BTC

Hanoi, February 26, 1999

 

CIRCULAR

OF THE MINISTRY OF FINANCE NUMBER 22/1999/TT-BTC DATED FEBRUARY 26, 1999 GUIDING THE REGIME OF STATE FINANCIAL MANAGEMENT FOR NON-REPAYABLE GRANTS

Implementing the State Budget Law which was adopted by the National Assembly of the Socialist Republic of Vietnam at its ninth session on March 20, 1996; the Law Amending and Supplementing Certain Provisions of the State Budget Law No. 06/1998/QH10 dated May 20, 1998 and current guiding legal documents under the Law; Decree No. 87/CP dated August 5, 1997 of the Government promulgating the Regulation on Management and Utilization of Official Development Assistance (ODA); Decision No. 28/1999/QĐ-TTg dated February 23, 1999 of the Prime Minister promulgating the Regulation on Management and Utilization of Grants from Foreign Non-Governmental Organizations; the Ministry of Finance guides the regime of state financial management for non-repayable grants as follows:

I. GENERAL PRINCIPLES:

1. Non-repayable grants referred to herein are assistance without repayment conditions from governments, United Nations development organizations, intergovernmental organizations, international financial institutions, foreign non-governmental organizations (NGOs) for economic and social development purposes, or other humanitarian purposes implemented in Vietnam. It includes: the transfer of knowledge, technology, goods, assets, money (foreign currency or Vietnamese dong) from abroad to Vietnam through programs or projects, or not according to programs or projects but with humanitarian nature approved by competent authorities, and emergency relief funds aimed at mitigating war and natural disaster consequences.

Any other transfers not stipulated above shall be considered as gifts or presents not within the scope of management guided by this Circular.

2. Ministries, Central Sector Agencies, and localities must implement project grant appraisal and approval procedures in accordance with the provisions of Decree No. 87-CP dated August 5, 1997 of the Government and Decision No. 28/1999/QĐ-TTg of the Prime Minister mentioned above. For non-project grants within the authority of Ministers, Heads of Central Sector Agencies, and Chairmen of Provincial People's Committees, before approving, they must seek the opinion of the Minister of Finance or a person authorized by the Minister of Finance.

3. Non-repayable grants are a source of revenue for the state budget and must be accounted for and managed in accordance with the State Budget Law.

4. The Ministry of Finance uniformly manages state finances for all sources of non-repayable grants, from participating in financial opinions on the policy of using grants, appraising projects, allocating capital for projects, to researching and proposing financial management mechanisms, implementing grant confirmation and accounting into the budget; guiding and inspecting compliance with financial management regimes, auditing final accounts, guiding asset, material, and capital handover of projects after completion in accordance with the provisions of this Circular.

- The Financial Accounting Departments of Ministries and Sector Agencies have the responsibility to assist the Heads of Ministries and Sector Agencies in managing finances for all non-repayable grant programs and projects received and implemented by Central Ministries and Sector Agencies.

- The Price and Finance Departments of Provinces and Municipalities directly under the Central Government have the responsibility to assist the People's Committee of the Province or Municipality in managing finances for all non-repayable grant programs and projects, grants received and implemented by local units; supervising the implementation of central grant programs and projects on their territory.

5. Program Directors, Project Directors, and Heads of units directly utilizing non-repayable grants are responsible under the law for implementing the objectives, targets, and other commitments recorded in each program and project as well as the financial management regime guided by this Circular.

II. SPECIFIC PROVISIONS:

A. ESTABLISHING AND COMBINING BUDGET PROJECTIONS.

Annually, based on the Circular guiding the establishment of state budget projections of the Ministry of Finance, commitment or agreement documents, and plans for implementing programs and projects or notifications of grant distribution by the competent authority to the unit, the situation of project implementation in the year; units or project leaders establish budget revenue and expenditure projections regarding non-repayable grants and counterpart funds (if any) together with their own budget projections and submit them to the project's competent authority and the same-level finance department:

- Projects under Ministries and Sectors send to the Financial Accounting Department of the Ministry or Sector.

- Projects of provinces and municipalities send to the Price and Finance Departments.

Ministries, Central Sector Agencies, and Price and Finance Departments are responsible for combining budget revenue and expenditure projections regarding non-repayable grants within their management scope and counterpart fund needs (if any) and submit them to the Ministry of Finance for inclusion in the state budget, reporting to the Government for approval by the National Assembly.

Counterpart fund projections are established in accordance with Joint Circular No. 06/1998/TTLT-BKH-BTC dated August 14, 1998 of the Ministry of Planning and Investment and the Ministry of Finance guiding the management mechanism for counterpart funds for programs and projects using Official Development Assistance (ODA) sources.

Budget revenue and expenditure projections regarding non-repayable grants are established according to Model No. 3 attached to this Circular.

B. IMPLEMENTATION OF RECEIVING, MANAGING, AND ACCOUNTING THROUGH THE STATE BUDGET OF GRANT FUNDS

1. Grant Confirmation:

1.1- Non-repayable grants that require grant confirmation include:

- Goods and equipment transferred from abroad to domestic units via import channels according to programs and projects.

- Goods and equipment purchased domestically by the foreign side and then transferred to domestic units according to signed programs and projects.

- Goods and equipment listed in grant project catalogs, brought in for experts' use according to agreements and will be handed over to units after the completion of grant programs and projects.

- Humanitarian aid and emergency relief funds sent unilaterally by the foreign side to domestic receiving organizations.

- Foreign currency or Vietnamese currency transferred from abroad to domestic units for direct use in programs and projects (including grants for office operational expenses of project offices as committed in the project documentation).

- Goods, money (foreign currency or Vietnamese Dong) transferred from abroad to domestic units not under approved programs or projects.

- Consulting services and technical services paid from the sources of non-reimbursable aid programs and projects reflected through supplementary contracts signed between the project leader and consulting companies both domestic and foreign.

1.2- Recipients required to complete confirmation procedures for aid:

All non-reimbursable aid programs and projects must complete aid confirmation procedures. The heads of programs, directors of projects, or leaders of units directly using non-reimbursable aid funds are responsible for signing the declaration forms for aid confirmation.

1.3- Time and location for confirmation:

Upon receipt of aid goods or money, or notification thereof, or immediately after acceptance of consulting and technical services, the relevant entities must proceed to the Ministry of Finance or the International Aid Management and Reception Board's representative offices in Ho Chi Minh City and Da Nang to complete the aid confirmation procedures.

1.4- Issuing the aid confirmation certificate:

The aid confirmation certificate shall be issued in four identical copies: the receiving unit retains two copies for the purpose of completing the receipt procedures and as a basis for accounting records; the International Aid Management and Reception Board retains two copies. In cases where vehicles or motorcycles are received, the receiving unit must issue an additional copy of the aid confirmation certificate for registration with the traffic authority. The details of the aid consignment declared on the aid confirmation certificate must match the import documentation.

The aid confirmation certificates for money and goods shall be issued according to the unified form attached to this Circular (Form No. 1 and No. 2).

For aid not under programs or projects:

- In cases where the aid recipients are under the management of central ministries or sectors: they must complete the aid confirmation procedures as stipulated above, while simultaneously notifying in writing the Financial Accounting Department of the respective ministry or sector to monitor, manage, and compile periodic reports to the Ministry of Finance according to Form No. 4 attached to this Circular.

- In cases where the aid recipients are under local management: They must notify in writing the Provincial Department of Finance and Price Control (the aid monitoring department) or the District Finance Office (if the recipient unit is managed by district, county, or town authorities) about the aid organization, the name of the recipient unit, and the specific purpose of each aid grant for monitoring and management.

The Provincial Department of Finance and Price Control and the District Finance Offices are responsible for compiling all aid grants, verifying and examining the legality of the data, and proactively processing accounting entries into the local budget according to the provisions of this Circular. Monthly or quarterly, depending on the volume of aid, the District Finance Offices will prepare reports according to Form No. 4 attached to this Circular and submit them to the Provincial Department of Finance and Price Control for consolidation and reporting to the Ministry of Finance.

2. Necessary documents for aid confirmation:

2.1- For aid goods include:

- Legal project documentation (approval documents for programs and projects by competent authorities; project documents, agreements, protocols, exchange letters, or officially signed agreements with foreign partners clearly stating the list, quantity, type, and value of approved goods).

- Approval documents for commercial contracts as currently prescribed, accompanied by commercial invoices (Invoice) or invoices issued by the Ministry of Finance if purchasing domestically.

- Ocean bill of lading (Bill of Lading) or air waybill (Airway Bill).

- Detailed packing list (Packing List).

For programs and projects conducted through bidding in Vietnam to purchase equipment, goods, and consulting services using aid funds, in addition to the aforementioned documents, the winning bidder must also provide the following related documents:

+ Bid result minutes and decision recognizing the winning bidder (if applicable)

+ Supply contract for goods and services signed between the Project Leader and the winning bidder (the bid price in the contract must clearly state that it does not include indirect taxes payable for imported consignments)

+ Commercial contract for direct imports.

Aid confirmation applies only to the winning bidder or designated bidder who directly imports equipment and goods.

2.2- For aid money includes:

- Legal project documents

- Bank notification or sponsor announcement along with a detailed plan for using aid money.

2.3- Cases requiring additional documentation:

- For aid programs implemented over several years where the project documentation does not detail specific lists and quantities of goods, annual agreements between sponsors and implementing agencies must be supplemented with specific regulations regarding the list, quantity, type of goods, or monetary amounts as mentioned above.

- Where the signed documents do not specify the list of goods, the unit must provide a detailed explanation of the aid consignment; the value of the aid goods must not exceed the total project budget and must be confirmed by the managing agency. For items subject to import restrictions, written approval from the Prime Minister or authorized agency is required.

- When there is a change in the list or type of aid goods, or changes in budget items increasing the project budget beyond the approved limit, a new approval document from the Prime Minister is required.

- Goods or foreign currency or Vietnamese dong aid not under a project sent from abroad to domestic organizations shall only be accepted by the units after obtaining written approval from the competent authority as stipulated in Article 5 of the Management and Utilization Regulation for Foreign Non-Governmental Organizations' Aid attached to Decision No. 28/1999/QĐ-TTg dated February 23, 1999 of the Prime Minister. In this case, necessary documents for confirming the aid include:

+ A confirmation or notification letter from the donor.

+ An authorization letter from the competent authority mentioned above to accept the aid.

+ For goods, additional shipping documents, cargo receipt, and detailed packing list are required.

- When a unit receives on behalf of multiple units, the receiving unit must prepare a detailed distribution list for each recipient and a power of attorney from the units that will use the aid.

- In cases where shipping documents, invoices, and detailed lists are not immediately available upon receipt of the aid (due to delayed documentation), the unit must provide a notice from the airport or transportation company and submit the missing documents as soon as they are received to the International Aid Reception and Management Board or the entity that issued the aid confirmation certificate.

3. Accounting into the state budget.

3.1- Non-repayable aid amounts must be fully and promptly accounted for in the state budget. The following documents serve as the basis for accounting:

- An aid confirmation certificate issued by the Ministry of Finance to the units.

- Other documents proving the transfer and use of aid such as bidding contracts, commercial contracts, consulting contracts, disbursement progress reports from authorized banks, liquidation minutes of contracts...

3.2- The value to be accounted for in the state budget at various levels is the original currency value reflected on the aforementioned documents converted into VND according to the accounting exchange rate published by the Ministry of Finance at each time point.

- In cases where aid goods have no original currency value, a provisional valuation based on the import price of similar goods during the same period is applied; or when actual inspection reveals discrepancies in quantity or price compared to the declared confirmed values, within 60 days from the date of issuing the aid confirmation certificate, the unit must re-evaluate the value of the goods and send the revaluation report to the financial authority at the same level for adjusting the accounting into the state budget. The revaluation is conducted by a Valuation Committee established by the unit's supervising authority with the participation of representatives from the financial pricing authority at the same level. The process follows current regulations.

3.3- Funds belonging to aid projects but directly spent by the foreign side, such as consultant fees, training costs, survey expenses, internship costs, and other expenditures incurred abroad without expenditure proof documents, shall not be accounted for in the state budget.

3.4- Timing of Accounting: Accounting of non-repayable aid into the state budget shall be carried out immediately after the financial authorities at all levels obtain one of the documents proving the receipt and use of aid as specified in Point 3.1, Section 3, Part B.

3.5- Allocation of Accounting into the State Budget:

- For aid received and managed by units under Ministries and Central Departments: The Ministry of Finance shall handle the accounting of the aid value into the central state budget.

- For aid received and managed by units under localities: Provincial or City Departments of Finance and Price Control or District, County, and Town Finance Offices shall handle the accounting of the aid value into the local state budget.

3.6- Method of Accounting:

3.6.1. For projects under allocation:

- Allocation of capital for basic construction investment:

Record aid revenue in Chapter 160, Type 10, Clause 8 (or 9), Sub-item corresponding to the current State Budget Classification; record temporary advance payments for basic construction investment through the Investment Development General Department (or Investment Development Bureau) and send a detailed list of aid-receiving units to the investment development agency for allocation according to the current management system for basic construction investment.

- Allocation of administrative and public service expenses:

Record aid revenue as above and record expenditures for beneficiary units according to the corresponding Chapter, Type, Clause, Item, and Sub-item of the current State Budget Classification.

For social organizations and occupational social organizations not listed in the Chapter provisions of the current State Budget Classification, or those without a relationship with the budget, the revenue recording still follows the above regulations, but expenditures are recorded in Chapter 150 "Other Units," Type, Clause, Category, Item, and Sub-item corresponding to the current State Budget Classification.

For undetermined aid usage units: Record aid revenue according to the allocated regulations, simultaneously determine the usage plan according to the agreed commitments and objectives with the aid provider, submit to the competent authority for decision-making, then distribute to the usage units and follow the above procedures for budget allocation.

In cases where non-repayable aid income is transferred from higher-level budgets to lower-level budgets for expenditure, the accounting into the budgets at various levels shall be carried out according to the provisions in Point 7, Part I of Circular No. 444 TC/NSNN dated December 18, 1998 of the Ministry of Finance guiding, supplementing, and amending the accounting of state budget revenues and expenditures according to the State Budget Classification system.

3.6.2. Projects under loan repayment:

For investment projects in production and business areas subject to government loans to enterprises, the Ministry of Finance shall sign a mandate contract with the Investment Development General Department or commercial banks to manage and recover loaned funds from enterprises using aid, and simultaneously handle the accounting of revenue and loan disbursements through the State Treasury according to the current State Budget Classification.

3.6.3. For projects using aid as credit funds for revolving loans, poverty alleviation, or loans to small and medium-sized enterprises: Record aid revenue and record expenditures in Item 151, Sub-item 05 according to the corresponding Chapter, Type, and Clause of the current State Budget Classification.

Regarding interest rates and the distribution and use of interest income:

- If the project documentation clearly specifies the interest rate and the use of interest, implement according to these provisions.

- In cases where the sponsor does not specify concretely, the interest rate for loans shall be implemented according to the preferential interest rate currently applied for ongoing poverty alleviation loans in the locality.

- The recovered interest shall be distributed and used according to the principle that, after deducting bank service fees (if any), a reasonable proportion shall be allocated to cover the management costs of project management boards at all levels, with the remainder being used to replenish the revolving fund to offset inflation.

The financial authority at the same level shall coordinate with the implementing agency to specify the ratio and the use of interest income according to the general principles set forth above for each project.

- Quarterly, the implementing agency must report to the financial authority at the same level on the situation regarding the use of the aforementioned interest income. Based on these reports, the financial authority will process the recording of revenue and expenditure for the allocation or loan through the budget at various levels for the specific purposes of the recovered interest income.

C. ACCOUNTING FOR THE RECEIPT AND USE OF AID:

During the use of aid, units must promptly and fully reflect all sources of funds and goods received (both in quantity and value) on accounting vouchers and ledgers in accordance with the provisions of the State Budget Law, the Accounting Statistics Ordinance, and the current accounting regulations issued by Decision No. 999 TC/QĐ/CĐKT dated November 2, 1996 of the Minister of Finance; additionally, they must also perform accounting as required by the donor (if applicable).

- In cases where the actual amount of aid received by the unit differs from the confirmed amount due to differences between the buying rate of foreign currency at major (or minor) banks and the rate published by the Ministry of Finance, the unit shall record the exchange rate difference in account 413 (Exchange Rate Difference) along with the bank's documentation. The balance of this account will be processed during the annual settlement review or upon completion of the project.

- Units may use non-reimbursable aid in the form of goods, equipment, etc., which have not yet been transferred ownership rights (project not yet completed) during the implementation of the project. These units must still fully record such usage on relevant accounts outside the balance sheet to meet management requirements.

D. OTHER MANAGEMENT REGIMES RELATED:

1. Aid Usage Regime:

- All expenditure activities must have specific budgets and be based on approved items by the funding organization, spending accurately according to the intended recipients and purposes without exceeding the agreed limits with the foreign party.

- In cases where project documents do not contain detailed and specific budgets, the implementing units must base their expenditures on the commitments made with the foreign side and domestic expenditure standards.

- Apart from the specific expenses clearly stated in the project documents, units may not use aid funds for any other purpose without authorization. Project directors or directly supervising authorities may not reallocate aid funds among units except with written permission from the aid organization and the project approval authority.

- For projects receiving aid funds deposited in banks, quarterly or annually, the implementing unit must submit a report along with the bank's notice and interest calculation slip to the financial authority at the same level for the processing of revenue recording and supplementary funding for the project. Only after receiving the accounting documentation from the financial authority can the implementing unit record additional income from aid and use it for project objectives during the project period.

- For projects funded through administrative and public service allocations, procurement of equipment and services must comply with the provisions in the project documents and the current government regulations on purchasing goods and equipment as stipulated in Decision No. 20-TC/KBNN dated January 17, 1996 of the Minister of Finance.

- For projects using aid funds for basic construction investment, office building repairs, architectural works, and infrastructure projects, bidding or tender selection must be organized according to the provisions in the project documents and the current government regulations on managing bids for basic construction investment projects.

2. Liquidation of Aid Assets:

- During project implementation, the project leader may propose the liquidation of equipment and goods that have exceeded their useful life or are damaged beyond repair. Such liquidation must be approved in writing by the funding organization or the project management authority.

- Equipment from aid sources becomes state property after being handed over to the user unit and must be managed according to the current state asset management and liquidation regulations. For administrative and public service units, the disposal of aid assets must comply with the regulations on the handling of unused and unusable assets in administrative and public service agencies as stipulated in Decision No. 1163-TC/QLCS dated December 21, 1996 of the Minister of Finance.

E. REPORTING, INSPECTION, SETTLEMENT, AND TRANSFER REGIME:

1. Reporting System:

Quarterly and annually, the heads of programs, project directors, and leaders of units directly using non-reimbursable aid must prepare reports on the receipt and use of aid according to Model No. 4 attached to the Circular and submit them to the project management authority. The project management authority is responsible for consolidating the overall situation of receipt and use of all projects under its jurisdiction and submitting it to the financial authority as follows:

- Projects under central ministries and sectors shall be sent to the Financial Accounting Department of the respective ministry or sector for consolidation and submission to the Ministry of Finance.

- Local projects shall be sent to the Provincial Finance and Price Bureau for consolidation and submission to the Ministry of Finance.

Reports on receipt and use must comprehensively reflect all contents as required and within the time frame specified in Article 28 of Decree No. 87-CP dated August 5, 1997 of the Government and Article 18 of the Regulation promulgated by Decision No. 28/1999/QĐ-TTg dated February 23, 1999 of the Prime Minister. In case of violation of the reporting system, the Ministry of Finance will temporarily suspend the confirmation of aid for subordinate units of ministries, sectors, and localities until the reports are received.

2. Inspection schedule:

Financial authorities at all levels shall be responsible for regularly inspecting and guiding subordinate units to strictly implement financial management systems for non-repayable aid funds as prescribed in this Circular:

- The Financial Accounting Departments of central ministries and sectors shall audit and guide assistance programs and projects received and implemented by subordinate units of central ministries and sectors.

- Departments of Finance and Prices of Provinces and Cities and District and County Offices of Finance and Prices shall inspect and guide programs, projects, and non-repayable aid funds received and implemented by local subordinate units.

- In cases where necessary, the Ministry of Finance may directly or cooperate with financial authorities at various levels to conduct inspections on programs, projects, or non-repayable aid funds received and implemented by subordinate units under central ministries, sectors, or localities.

3. Settlement System

Annually and upon completion of projects, based on current regulations, the directors of aid programs and projects, and heads of units using aid funds shall be responsible for preparing detailed settlement reports on income and expenditure of aid funds as follows:

3.1- For construction investment projects: The settlement process shall be carried out in accordance with the provisions of Circular No. 66 TC/ĐTPT dated November 2, 1996, issued by the Ministry of Finance, which guides the settlement of construction investment capital.

3.2- For administrative and public service projects:

The content and format of the settlement report shall be implemented according to the provisions of Decision No. 999 TC/QĐ/CĐKT dated November 2, 1996, issued by the Minister of Finance regarding the issuance of the Administrative and Public Service Accounting System.

3.2.1- Annual Settlement:

The Ministry of Finance shall lead the review of annual settlement reports on income and expenditure of aid funds from central ministries and sectors, together with the review of administrative and public service budget settlements. Based on the audit report on aid fund settlements, the Department of Administrative and Public Services will announce the total approved settlement amount for administrative and public service expenses, including the settlement of aid funds from central ministries and sectors. Counterpart funds for projects shall be settled like the settlement of state budget funds provided according to current regulations.

Departments of Finance and Prices of Provinces and Cities and District and County Offices of Finance and Prices shall lead the review of annual settlement reports on income and expenditure of aid funds from units under their management, together with the review of administrative and public service budget settlements.

3.2.2- Project Settlement:

The Financial Accounting Departments of central ministries and sectors and Departments of Finance and Prices of Provinces and Cities shall lead the review of project settlements within their jurisdiction.

In cases where a central project management board is established according to the decision of the supervising ministry or sector, the project director shall be responsible for submitting the settlement report to the supervising authority (Financial Accounting Department) and the Ministry of Finance for the review of project management boards' settlements.

3.3- Some Points to Note When Settling Accounts:

If there is excess money when the project ends, the project director shall report the handling plan to the supervising authority and the same-level financial authority (as stipulated in the section on submitting settlement reports). The financial authority shall be responsible for reviewing and deciding. Any use of these funds without approval from the financial authority is a violation of the State Budget Law and will be recovered and deposited into the state budget at various levels.

For ongoing programs and projects, the remaining aid funds in the accounts of programs and projects at the end of the fiscal year shall be transferred to the next year for continued implementation.

- Approval of project settlement reports for completed projects must comply with current regulations of the Ministry of Finance.

4- Transfer of Assets After Project Completion:

4.1- Projects that have been approved for settlement must immediately proceed with asset transfer. The asset transfer committee shall include: the project director as chairman, representatives of the supervising authority of the implementing unit, and representatives of the same-level financial authority as members.

- For projects managed by central ministries and sectors, a representative of the Ministry of Finance should be included.

- For projects managed by localities, a representative of the Department of Finance and Prices should be included.

4.2- The asset transfer committee for aid projects shall base its actions on approved project settlement reports and carry out asset transfer procedures for aid projects to units in accordance with current regulations on state asset transfer.

III. IMPLEMENTATION PROVISIONS:

1. This Circular replaces Circulars No. 30 TC/VT dated June 12, 1997; No. 137/1998/TT/BTC dated October 19, 1998, issued by the Ministry of Finance, and shall take effect fifteen days after the date of signature.

2- During the guidance, inspection, and supervision of the implementation of aid programs and projects, financial authorities at all levels must firmly handle or promptly recommend to the Ministry of Finance and relevant legal authorities to deal with violations of financial management systems for non-repayable aid funds as prescribed in this Circular.

3- During the implementation, if there are difficulties, ministries, sectors, localities, units, and project sponsors need to promptly reflect them to the Ministry of Finance for research and resolution.

 

 

Le Thi Bang Tam

(Signed)

 

 

FORM NO. 1

MINISTRY OF FINANCE
Number TC/XNVT

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness

CERTIFICATE OF RECEIVED AID GOODS

I. SELF-FILLED SECTION BY THE RECIPIENT UNIT:

A. Basic Information:

1. Source of Aid: Government International Organization Non-Governmental Organization

2. Name of the Donor Organization:

3. Form of Aid:

Program Name

Implementation From:

To:

Project Name:

Implementation From:

To:

Emergency:

 

 

4. Total Value of Aid: - Original Currency:

- Converted to USD:

5. Approval Document or Permission to Receive Aid from Competent Authority:

No.: Date: Issued By:

6. Main Project Sponsor:

7. Direct User of Aid Goods:

Subordinate to (Ministry, Central Agency): Managed by

Subordinate to (Province, City, Special Zone): Managed by

8. Unit Authorized to Receive Aid Goods:

B. Detailed Goods Lots and Purpose of Use:

1. Ship/Airplane Name: Port: Arrival Date:

2. Domestic Purchased Goods at:

Bill of Lading or Sales Invoice No., Date

Goods Name

Quantity (Cases)

Weight (Kg)

Value of Received Goods

Purpose of Use

 

 

 

 

Original Currency

Paid in Vietnamese dong

Total Amount in VND

 

 

 

 

 

 

 

 

 

* Exchange Rate (VND/1USD)

MODEL NO. 2

MINISTRY OF FINANCE

Number TC/XNVT

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness

CERTIFICATE OF RECEIVED AID FUNDS

I. SELF-FILLED SECTION BY THE RECIPIENT UNIT:

A. Basic Information:

1. Source of Aid: Government International Organization Non-Governmental Organization

2. Name of the Donor Organization:

3. Form of Aid:

Program Name

Implementation From:

To:

Project Name:

Implementation From:

To:

Emergency:

 

 

4. Total Value of Aid: - Original Currency:

- Converted to USD:

5. Approval Document or Permission to Receive Aid from Competent Authority:

No.: Date: Issued By:

6. Main Project Sponsor:

7. Direct User of Aid Goods:

Subordinate to (Ministry, Central Agency): Managed by

Subordinate to (Province, City, Special Zone): Managed by

8. Unit Authorized to Receive Aid Goods:

9. Bank Account Number of the Recipient Unit:

Location:

B. Detailed Funds and Purpose of Use:

1. Received in Original Currency:

2. Converted to USD:

3. Exchange Rate (VND/1USD):

4. Converted to Vietnamese Dong:

5. Received in Vietnamese Dong:

6. Total Amount in Vietnamese Dong Received:

Where:

+ Usage

+ Usage

+ Usage

+ Usage

+ Usage

Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Tải văn bản

Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Bản đồ quan hệ

22/1999/TT-BTC
Circular No. 22/1999/TT-BTC of the Ministry of Finance guiding the state financial management regime for non-repayable aid sources
Expired
↓ Văn bản chịu tác động từ văn bản này
Bãi bỏ 1

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.