Decision No. 243/QD-TTg approves Phase I of the Plan for Surveying and Assessing Coal Potential Below -300m, the Quang Ninh Coal Basin. The objective is to study the distribution laws of coal seams and assess coal reserves, with a total estimated budget of approximately 92 billion VND over a period of three years.
要点
- Vietnam National Coal-Mineral Industries Group → shall implement the Plan for Surveying and Assessing Coal Potential Below -300m with specific objectives and tasks
- Ministry of Finance → shall take the lead and coordinate to examine the capital structure for Phase I of the Plan
- Work volume → includes compiling and revising geological maps, drilling, core sampling, monitoring, and sample collection, with an estimated budget of approximately 92 billion VND
- Implementation time → Phase I from 2007 to 2009
- Phase II → will be considered after receiving the report on the results of Phase I
🌐 本文件的社会影响
- To create a scientific basis for exploration and exploitation of coal in areas below -300m, increasing potential coal reserves
- A large amount of capital is required to implement the Plan, which may put financial pressure on the Vietnam National Coal-Mineral Industries Group
❓ 常见问题
When was the Plan for Surveying and Assessing Coal Potential Below -300m approved?
The Plan was approved on February 15, 2007.
What is the main objective of the Plan?
The main objective is to study the distribution laws of coal seams at depths below -300m and assess coal reserves from -300m to the bottom of the C2 coal seam grade (grade 333).
What is the estimated budget for Phase I of the Plan?
The estimated budget for Phase I of the Plan is approximately 92 billion VND.
How long is the implementation period for Phase I of the Plan?
The implementation period for Phase I of the Plan is from 2007 to 2009, lasting three years.
When will Phase II of the Plan be considered?
Phase II of the Plan will be considered after receiving the report on the results of Phase I.
全文
Pursuant to …;
Regarding the approval of Phase I of the Plan for Surveying and Evaluating Coal Potential Below -300m Level in the Quang Ninh Coal Basin
__________________________
PRIME MINISTER
Pursuant to the Law on Organization of the Government dated December 25, 2001;
CONSIDERING THE PROPOSAL OF THE MINISTER OF NATURAL RESOURCES AND ENVIRONMENT,
DECISION:
Article 1. Approves Phase I of the Plan for Surveying and Evaluating Coal Potential Below -300m Level in the Quang Ninh Coal Basin, prepared by the Vietnam National Coal-Mineral Industries Group, with the main contents as follows:
1. Objectives: - Study the distribution laws of coal seams at depths below -300m; - Evaluate the coal reserves from -300m to the bottom of the C2 grade (grade 333) layer, which is estimated at 1 billion tons, and forecast the resources of grade P1 (grade 334 a), estimated at 3 billion tons.
2. Tasks: - Study geological structures, determine factors controlling coal-bearing strata, and the distribution laws of coal seams; - Identify coal seams and predict the existence of coal seams in some mines; - Conduct preliminary surveys on gas content in coal and geological-hydrogeological conditions at depths below -300m; - Determine reserves and evaluate forecasted resources.
3. Technical methods: - Compile and revise geological maps at a scale of 1/10,000; - Implement geophysical methods and drilling works; - Collect and analyze various types of samples, assess the quality and characteristics of coal seams.
4. Volume and budget estimate:
a) Main volume: - Compile and revise geological maps at a scale of 1/10,000 covering an area of 210 km²; - Drill 25,100m/22 drill holes; - Core logging 32,350m/22 drill holes; - Monitor geological-hydrogeological conditions at 22 drill holes and conduct water pumping tests at 3 drill holes; - Control survey III 44 points, measure and record major works 22 points, profile traverse 12.4 km, indirect traverse 12 km; - Collect 1,467 samples, analyze 1,378 samples of various types.
b) Budget estimate for Phase I is approximately 92 billion VND (ninety-two billion VND).
5. Implementation period for Phase I: 3 years (from 2007 to 2009).
6. Phase II of the Plan for Surveying and Evaluating Coal Potential Below -300m Level in the Quang Ninh Coal Basin will be considered after receiving the report on the results of Phase I.
Article 2. The Ministry of Finance shall take the lead, in coordination with the Ministries of Planning and Investment, Natural Resources and Environment, Industry, to specifically examine the capital structure for implementing Phase I of the Plan according to regulations and report to the Prime Minister for decision.
Article 3. This Decision takes effect from the date of issuance.
The Ministers of the Ministries of Natural Resources and Environment, Industry, Finance, Planning and Investment, Science and Technology, Agriculture and Rural Development, the People's Committee of Quang Ninh Province, the Vietnam National Coal-Mineral Industries Group, and related agencies are responsible for enforcing this Decision./.
VICE-PRESIDENT OF THE GOVERNMENT