Decision No. 28/2000/QĐ-BXD on issuing the construction site investigation machinery rate table

Decision No. 28/2000/QĐ-BXD issues the construction site investigation machinery rate table, stipulating the costs for one shift of work for various types of investigation machinery and equipment. This document replaces the old rate table and takes effect fifteen days after the date of signature.

Số hiệu28/2000/QĐ-BXD
Loại văn bảnDecision
Cơ quan ban hànhMinistry of Construction
Người kýNguyễn Mạnh Kiểm — Bộ trưởng
Cập nhật21/06/2026
NgànhConstruction
Lĩnh vựcUncategorized
Ngày ban hành15/12/2000
Ngày áp dụng30/12/2000
Ngày hết hiệu lực15/08/2019
Tình trạngExpired
✦ Tóm lược thông minh

Decision No. 28/2000/QĐ-BXD issues the construction site investigation machinery rate table, stipulating the costs for one shift of work for various types of investigation machinery and equipment. This document replaces the old rate table and takes effect fifteen days after the date of signature.

Đối tượng áp dụng

Organizations and individuals related to construction site investigation work

Các điểm cốt lõi

  • The construction site investigation machinery rate table stipulates the costs for one shift of work for various types of investigation machinery and equipment (Article 1).
  • The machinery shift price does not include fuel, energy consumption, and labor costs for operating the machinery (Article 1).
  • The rate table applies to machinery and equipment used under normal conditions; for machinery and equipment working in saline water, brackish water, and high mountain areas, the machinery shift price is adjusted with a factor of 1.07 (Article 2).
  • The rate table includes basic depreciation costs, major repairs, and regular maintenance costs for machinery and equipment (Article 1).
  • Ministries, ministerial-level agencies, People's Committees of Provinces and centrally-administered cities must implement this Decision (Article 3).

🌐 Tác động xã hội từ văn bản này

  • Helps construction site investigation units accurately prepare cost estimates for investigation work.
  • Replaces the old rate table, creating uniformity in management and use of investigation machinery and equipment.
  • May increase costs for projects requiring special investigation machinery.
  • Helps state management agencies better control the use of fixed assets.

❓ Câu hỏi thường gặp

What costs does the construction site investigation machinery rate table include?

The rate table includes basic depreciation costs, major repairs, and regular maintenance costs for machinery and equipment.

Are there any adjustment factors for machinery working in special areas?

For machinery working in saline water, brackish water, and high mountain areas, the machinery shift price is adjusted with a factor of 1.07.

Which rate table does this replace?

This rate table replaces the old rate table and takes effect fifteen days after the date of signature.

Toàn văn

MINISTRY OF CONSTRUCTION

SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness

Number: 28/2000/QĐ-BXD
Date: December 15, 2000

 

DECISION OF THE MINISTER OF CONSTRUCTION

Regarding the issuance of the construction survey machinery rate table

_____________________

THE MINISTER OF CONSTRUCTION

Pursuant to Decree No. 15/CP dated March 2, 1993 of the Government stipulating the tasks, powers, and state management responsibilities of Ministries and Ministries equivalent to Ministries.

Pursuant to Decree No. 15/CP dated March 4, 1994 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Construction.

Pursuant to Decision No. 166/1999/QĐ-BTC dated December 30, 1999 of the Minister of Finance on the management and use regulations and depreciation of fixed assets.

Based on the proposal of the Director of the Institute of Construction Economics.

 

DECISION:

Article 1. Issued together with this Decision is the "Construction Survey Machinery Rate Table".

Article 2. This machinery rate table serves as the basis for establishing survey construction unit prices and replaces the construction survey machinery rate table attached to Circular No. 22/BXD-VKT dated July 17, 1995 of the Ministry of Construction, and shall take effect nationwide uniformly 15 days from the date of signature.

Article 3. Ministries, agencies equivalent to Ministries, agencies under the Government, People's Committees of Provinces and Cities directly under the Central Government are responsible for implementing this Decision.

 

CONSTRUCTION SURVEY MACHINERY RATE TABLE

Issued together with Decision No. 28/2000/QĐ-BXD dated December 15, 2000 of the Minister of Construction

A - EXPLANATION OF CALCULATION AND APPLICATION PROVISIONS

1/ The construction survey machinery rates specified in this document define the costs for one shift of work of various types of construction survey machinery, serving as the basis for establishing survey construction unit prices and preparing cost estimates for survey construction works according to Circular No. 07/2000/TT-BXD dated July 12, 2000 of the Minister of Construction.

2/ The contents of the construction survey machinery rates include: Basic depreciation costs, major repair depreciation costs, and regular maintenance costs of machinery and equipment. The construction survey machinery rates do not include fuel and energy consumption costs during the operation of machinery and equipment, nor labor costs for operating the machinery.

3/ The construction survey machinery rates are determined based on the following grounds:

a/ Original price of machinery and equipment including: Actual purchase price minus any discounts or rebates (if applicable); interest on loans for machinery and equipment before they are put into use; transportation, loading and unloading costs; maintenance costs; storage, repair, and refurbishment costs before putting them into use (if applicable); installation, trial run, tax, and registration fee costs (if applicable).

b/ Annual depreciation rate of machinery and equipment: As prescribed in Decision No. 166/1999/QĐ-BTC dated December 30, 1999 of the Minister of Finance on the management, use, and depreciation of fixed assets and Decision No. 02/1999/QĐ-BXD dated January 11, 1999 of the Minister of Construction on the annual depreciation rate of various types of construction machinery and equipment.

4/ This construction survey machinery rate table applies to machinery and equipment used under normal conditions. For machinery and equipment used in saline water, brackish water, or high mountain areas, the machinery rates will be adjusted by a factor of 1.07.

 

B - CONSTRUCTION SURVEY MACHINERY RATE TABLE

Serial number

TYPE OF MACHINE AND EQUIPMENT

MACHINERY RATE (VND/SHIFT)

(PER PERSON/CASE)

1

Hand drill set

37.050

2

Ykb-25 drill machine

21.500

3

CBY-150-3ub drill machine set

400.951

4

F-60L or B-40L drill machine

790.969

5

Tower and hoist of hand drill set

26.250

6

Drilling pump combination

477.251

7

SPT test drill machine

400.951

8

Gouda static penetration machine

376.250

9

RA-50 dynamic penetration machine

43.000

10

GA press machine

243.667

11

SPT test kit

12.190

12

Horizontal compression GA frame

430.000

13

DK9 air compressor (600m3/h)

131.387

14

250/50 water pump

76.300

15

100-ton jack

42.764

16

10-ton pneumatic crane

546.701

17

7.5KW water pump

10.280

18

12-ton truck

363.043

19

2.5-3.0KW generator

8.226

20

CBR machine

91.375

21

Analytical scale

5.125

22

Drying cabinet

9.150

23

50-ton hydraulic jack

30.546

24

Water distillation machine

3.978

25

pH meter

4.575

26

Furnace

9.548

27

Analytical balance

7.320

28

Fume hood

7.320

29

Electric stove

310

30

460W water pump

1.830

31

Photometric colorimeter

67.100

32

Flame photometer

25.620

33

Cutting machine

1.647

34

Single-stage compressor

10.980

35

Permeability coefficient determination machine

43.920

36

Sand bath

915

37

Three-axis cutter

328.250

38

Vacuum pump

7.161

39

Strain-controlled cutter

109.800

40

Compactor

6.405

41

Sample extraction jack

30.546

42

Rock core drill machine

33.855

43

Rock core press machine

100.650

44

Rock saw and grinder

12.200

45

Modulus determination machine

18.300

46

Plate scale

3.660

47

Large sample cutter

10.980

48

Soil mixer

5.490

49

12-ton truck

363.043

50

Litvinop press machine

16.470

51

Caragang flow test machine

4.117

52

Microscope

10.980

53

Telescope

2.472

54

Theo 020 machine

27.467

55

Theo 010 machine

41.200

56

Ditomat machine

151.066

57

Ni 030 machine

18.883

58

Miabala measuring device

2.006

59

Dalta 020 machine

18.540

60

ES-125 seismic machine

86.000

61

Triosx-12 seismic machine

258.000

62

Triosx-24 seismic machine

301.000

63

UJ-18 machine

32.250

64

MF-2-100 machine

32.250

65

Camera

5.640

66

Walkie-talkie

5.875

67

Standard cargo truck

375.750

68

5-ton internal transport truck

161.496

69

Benkenman boom set

16.125

70

Echo sounder

32.250

71

5-ton wooden boat

48.484

72

30CV motorboat

38.144

73

150CV speedboat

280.214

74

River current meter

25.200

75

5-ton anchor winch

34.203

76

Machine winch

17.588

77

BMM current meter

10.080

78

7-ton boat

66.019

79

Wave recorder

92.400

80

Wind recorder

10.080

81

Wild-T3 machine

41.200

82

P30 hand drill

19.003

83

B10 air compressor (1200m3/h)

383.236

84

Pump For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%; 48

1.830

85

Pump For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%; 100

76.300

86

0.5m3 drum

500

87

MO-10 hammer

9.223

88

7.5KW welding transformer

9.443

89

Lighting transformer

9.443

90

CB-5M fan

10.286

 

THE MINISTER
(Signed)
Nguyen Manh Kiem
Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Tải văn bản

Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Bản đồ quan hệ

28/2000/QĐ-BXD
Decision No. 28/2000/QĐ-BXD on issuing the construction site investigation machinery rate table
Expired

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.