This Decision stipulates the分级审批of technical design and estimate (TKKT-DT) for forestry projects for units authorized to do so. These units have the authority to review certain specific types of projects under certain conditions and investment levels.
适用范围
The General Directors of the Associations, Corporations, and Companies listed in the attached decision.
要点
- The General Directors of the Associations, Corporations, and Company Directors have the authority to review TKKT-DT for forestry projects below the level requiring feasibility studies and not funded by state investment.
- Types of projects authorized for review include: residential buildings, small processing plants, transportation works, irrigation works, forest engineering works, land reclamation, infrastructure serving forest protection and small items with an investment of up to 100 million VND.
- The Associations, Corporations, and Companies must strengthen their departments responsible for reviewing TKKT-DT and submit annual consolidated reports to the Ministry of Forestry.
- Heads of relevant units are responsible for implementing this Decision.
🌐 本文件的社会影响
- Units authorized to review may reduce time and procedures for the process of preparing and reviewing TKKT-DT for forestry projects.
- Units assigned分级审批will enhance internal project management capabilities.
❓ 常见问题
What conditions must units authorized to review TKKT-DT for forestry projects meet?
Units are only authorized to review TKKT-DT for forestry projects below the level requiring feasibility studies and not funded by state investment.
What types of projects are authorized for review?
Types of projects include: residential buildings, small processing plants, transportation works, irrigation works, forest engineering works, land reclamation, infrastructure serving forest protection and small items with an investment of up to 100 million VND.
How must the Associations, Corporations, and Companies submit consolidated reports to the Ministry of Forestry?
Annually, the Associations, Corporations, and Companies must submit consolidated reports to the Ministry of Forestry including a list of projects and items they have reviewed and approved TKKT-DT for that year (name, scale, grade, approved budget estimate) and a list of staff tasked with reviewing TKKT-DT for that year and the next.
Are units assigned分级审批responsible for anything?
Heads of relevant units are responsible for implementing this Decision.
For which forestry projects does this Decision apply?
This Decision applies to forestry projects listed in the attached decision, including units such as the Corporation of Timber Products Services Export-Import I (Hanoi), the Corporation of Timber Products Services Export-Import II (Da Nang) and many other units.
全文
|
MINISTRY OF FORESTRY |
SOCIALIST REPUBLIC OF VIET NAM |
|
Number: 632/LSCN |
Hanoi, August 18, 1993 |
Pursuant to …;
Delegation of authority to review technical design - budget estimate (TKKT-DT) for forestry works
(TKKT-DT) forestry works
THE MINISTER OF FORESTRY
Pursuant to Decree No. 237/HĐBT dated September 19, 1985 of the Council of Ministers promulgating the Regulations on preparation, examination, and approval of construction project designs;
Pursuant to Circular No. 01/TT-LB dated March 9, 1991 of the Joint Ministry of Construction - State Committee for Science, Technology and Environment - Finance - National Bank of Vietnam guiding the implementation of the Management Regulations for Construction Projects 385/HĐBT;
Considering the proposal for delegation of authority to review TKKT-DT from the Associations, Corporations, and Companies,
DECISION:
Article 1- Authorizes the General Directors of the Associations and Corporations and the Directors of Companies (with attached list) to review TKKT-DT for forestry works according to the following provisions:
1- Conditions for projects authorized to be reviewed:
Below the level requiring technical economic feasibility study;
Not funded by state capital (state budget, non-repayable aid, preferential loans or interest-free loans according to state plans...).
2- Specific types of projects authorized to be reviewed as follows:
a- Architectural works.
Civilian houses and residential buildings up to Class III;
Small processing plants with investment capital of 300 million dong or less;
b- Transportation works.
Forest roads of Class III or lower with gravel surface;
Bridges up to 10 meters long;
Culverts up to 50 meters long;
Various types of drains.
c- Water conservancy works.
Small water canals, irrigation channels, and drainage ditches.
d- Forestry works.
Seedling nurseries, germplasm gardens, seedling forests, botanical gardens, and plant collections;
Reforestation;
Forest enclosure and enrichment;
Care and protection.
e- Other works.
Land reclamation and soil improvement;
Infrastructure works serving development and construction;
Minor components with investment capital of 100 million dong or less, supplementing main works already approved.
In addition, the General Directors and Directors are also authorized to review TKKT-DT for certain types of works funded by state capital under Project 327-CT according to Point II-3-a of Circular No. 12-LSCN dated August 18, 1993 of the Ministry of Forestry "guiding some issues regarding technical economic feasibility studies, budget estimates, and construction of Project 327-CT".
Article 2.
The Associations, Corporations, and Companies must strengthen their departments responsible for reviewing TKKT-DT.
The review and approval of TKKT-DT must be based on current state regulations governing construction management.
Annual reports summarizing the reviews and approvals of TKKT-DT for the year must be submitted to the Ministry including the following contents:
List of works and components reviewed and approved for TKKT-DT during the year (name, scale, grade, approved budget estimate).
List of staff assigned to review TKKT-DT during the year and projected for the next year.
Article 3. The General Directors and Directors of the units delegated authority and the Heads of related units are responsible for implementing this Decision.
All provisions contrary to this Decision are hereby abolished.
|
Tran Son Thuy (Signed) |
LIST
UNITS AUTHORIZED TO REVIEW TKKT-DT FOR FORESTRY WORKS
(Attached to Decision No. 632-LSCN dated September 18, 1993 of the Ministry of Forestry)
(Attached to Decision No. 632-LSCN dated September 18, 1993 of the Ministry of Forestry)
1- Corporation of Forestry Product Services and Production Export-Import I (Hanoi).
2- Corporation of Forestry Product Services and Production Export-Import II (Da Nang).
3- Corporation of Forestry Product Services and Production Export-Import III (Ho Chi Minh City).
4- Company of Seedlings and Reforestation Services (Hanoi).
5- Association of Wood Processing Enterprises (Ha Bac).
6- Association of Pulp Raw Material Enterprises (Vinh Phu).
7- Association of Forestry-Agriculture-Industry Complex Song Hieu (Nghe An).
8- Association of Forestry-Agriculture-Industry Complex Kon Ha Nung (Gia Lai).
9- Association of Forestry-Agriculture-Industry Complex Easuop (Dac Lac).
10- Association of Forestry-Agriculture-Industry Complex Gia Nghia (Dac Lac).
11- Association of Forestry-Agriculture-Industry Complex La Nga (Dong Nai).
关系图
点击文件即可打开。红色边框=改变效力的关系。