Circular No. 01/2007/TT-BKH guiding the implementation of certain provisions of Government Decree No. 92/2006/NĐ-CP dated September 7, 2006 on the establishment, approval, and management of comprehensive socio-economic development planning.

Circular No. 01/2007/TT-BKH guides the implementation of certain provisions of Government Decree No. 92/2006/NĐ-CP on the establishment, approval, and management of comprehensive socio-economic development planning. This document stipulates the subjects required to establish plans, the time for establishing and adjusting plans, the procedures for establishing plans, sources of funding, consulting agencies, state management work on planning, contents of plans, and reporting systems.

文号01/2007/TT-BKH
文件类型Circular
发布机关Ministry of Finance
签署人Võ Hồng Phúc — Bộ trưởng
更新29/06/2026
行业Investment Planning
领域Uncategorized
发布日期07/02/2007
生效日期08/03/2007
失效日期15/12/2013
状态Expired
✦ 智能摘要

Circular No. 01/2007/TT-BKH guides the implementation of certain provisions of Government Decree No. 92/2006/NĐ-CP on the establishment, approval, and management of comprehensive socio-economic development planning. This document stipulates the subjects required to establish plans, the time for establishing and adjusting plans, the procedures for establishing plans, sources of funding, consulting agencies, state management work on planning, contents of plans, and reporting systems.

适用范围

Industries, fields, major products nationwide and locally; regions; Ministry of Planning and Investment; state management agencies on planning; organizations providing planning consultancy services; enterprises, citizens.

要点

  • Major industries, fields, and products nationwide that need to establish development plans are decided by the Prime Minister. Major industries, fields, and products locally are decided by the Chairman of the People's Committee of provinces and centrally-administered cities.
  • The period for establishing plans extends until 2020, and may be extended further depending on the nature of the planning subject. The adjustment period for plans is 45 days from the date when the competent authority receives a valid review file.
  • Funding for the establishment and adjustment of comprehensive socio-economic development plans is guaranteed by development investment capital from the state budget, with cost standards set by the Ministry of Planning and Investment.
  • Consulting agencies for plan establishment are selected through bidding or direct assignment. Bidders' files must meet all conditions regarding capacity, experience, and proposed prices.
  • The authority to review comprehensive socio-economic development plan projects is carried out by the Ministry of Planning and Investment. The decision approving the plan is published no later than 10 days from its effective date.

🌐 本文件的社会影响

  • Positive impact: Creating a legal basis for the establishment, approval, and management of comprehensive socio-economic development plans, helping industries and fields to be proactive in implementing plans.
  • Negative impact: Time and financial burden on enterprises participating in bidding for consultancy services to establish plans.

❓ 常见问题

Which industries and fields need to establish plans?

Major industries, fields, and products nationwide that need to establish development plans are decided by the Prime Minister. Major industries, fields, and products locally are decided by the Chairman of the People's Committee of provinces and centrally-administered cities.

What is the duration of the plan adjustment period?

The review period for plan projects is 45 days from the date when the reviewing authority receives a valid review file.

How is funding for the establishment and adjustment of plans ensured?

Funding for the establishment and adjustment of comprehensive socio-economic development plans, industry development plans, and major product development plans is guaranteed by development investment capital from the state budget.

Which agency has the authority to review plan projects?

The authority to review comprehensive socio-economic development plan projects is carried out by the Ministry of Planning and Investment. Plan projects for special economic zones are reviewed by the State-level Review Council established by the Prime Minister, involving relevant ministries and sectors.

When is the decision approving the plan published?

The decision approving the plan is published in writing by the planning management authorities at all levels no later than 10 days from the date it becomes effective.

全文

CIRCULAR

Guidelines for Implementing Certain Provisions of Decree No. 92/2006/NĐ-CP

dated September 7, 2006 of the Government on the Preparation, Approval, and Management of Comprehensive Development Planning for the Economy and Society

and managing the overall planning for economic and social development

Pursuant to Decree No. 61/2003/NĐ-CP dated June 6, 2003 of the Government stipulating the functions, tasks, and powers of the Ministry of Planning and Investment;

Based on Decree No. 92/2006/NĐ-CP dated September 7, 2006 of the Government on the preparation, approval, and management of overall socio-economic development planning;

Pursuant to Decree No. 99/2006/NĐ-CP dated September 15, 2006 on inspection work regarding the implementation of policies, strategies, planning, and plans;

The Ministry of Planning and Investment issues guidelines for implementing certain provisions of Decree No. 92/2006/NĐ-CP (hereinafter referred to as the Decree) concerning the content, procedures for preparation, review, and management of comprehensive development planning for the economy and society as follows:

I. GUIDELINES FOR GENERAL PROVISIONS

1. Subjects Required to Prepare Planning (guidelines for implementing Article 4 of the Decree)

a) Major industries, fields, and products nationwide that need to prepare planning for development shall be decided by the Prime Minister. Annually, the Ministry of Planning and Investment will consolidate proposals from relevant ministries and sectors and submit them to the Prime Minister for decision on the list of industries, fields, and products that need to prepare planning.

Major industries, fields, and products at the provincial level that need to prepare planning shall be decided by the Chairman of the People's Committee of the province or centrally governed city. Annually, the Department of Planning and Investment will consolidate proposals from relevant departments and sectors and submit them to the Chairman of the People's Committee of the province or centrally governed city for decision on the list of major industries, fields, and products that need to prepare planning.

b) Areas required to prepare planning: In addition to the subjects specified in Decree No. 92/2006/NĐ-CP, the planning subjects also include sea islands, economic corridors, economic belts, economic zones, and regions spanning multiple counties or communes with the function of being key economic areas of provinces.

2. Timeframe for Preparing and Adjusting Comprehensive Development Planning for the Economy and Society (guidelines for implementing Articles 5 and 7 of the Decree)

a) Period for preparing planning:

All comprehensive development planning for the economy and society is prepared for the period up to 2020 towards the goal of building Vietnam basically into a modern industrialized country. Depending on the nature of the planning subject (for example, planning for the development of airport systems, deep-water port systems, expressway systems, 220KV and 500KV power grid networks... or planning for key industries such as oil and gas, coal, electricity...), the planning may have a longer vision: about 10, 15, or 20 years beyond 2020.

b) Adjustment of planning:

Adjustment of planning involves adjusting goals, tasks, or contents already approved in the planning but found during its implementation to no longer be suitable with actual conditions, while supplementing planning for the next five years.

In cases where it is necessary to adjust planning, a report must be submitted to the competent authority for approval of the decision to implement the adjustment of planning.

3. Basis for Preparing Planning and Consistency of Planning (guidelines for implementing Points 1 and 2, Article 6 of the Decree)

The basis for preparing comprehensive development planning for the economy and society is:

- For comprehensive development planning for the economy and society at lower territorial levels, it is based on planning at higher territorial levels. For national comprehensive development planning for the economy and society, it is based on the national economic and social development strategy and the implementation situation of comprehensive development planning for the economy and society of territorial regions in the previous period.

- Planning for the development of key industries, fields, and products is based on comprehensive development planning for the economy and society at the same level and planning for the development of industries, fields, and products at higher levels. Construction planning, urban development planning, and land use planning are based on comprehensive development planning for the economy and society and planning for the development of industries and fields at the same level.

- Agreements and cooperation arrangements between Vietnam and other countries, international organizations, or between provinces of Vietnam and provinces of neighboring countries that have been officially signed.

In cases where comprehensive development planning for large territorial regions has not yet been newly prepared, provinces and centrally governed cities must closely coordinate with the Ministry of Planning and Investment (the agency responsible for preparing planning for regions) to obtain information on reviewing and adjusting large regional planning.

4. Procedures for Preparing Planning (guidelines for implementing Articles 14, 18, 21, 24, and 28 of the Decree)

All projects for comprehensive development planning for the economy and society at the national, regional, provincial, county levels, and projects for planning the development of industries and fields must seek advisory opinions from relevant agencies managing the industry and territory from the beginning of project preparation until submission for approval of the planning project.

5. Funding for Preparing and Adjusting Comprehensive Development Planning for the Economy and Society (guidelines for implementing Article 8 of the Decree)

- Funding for preparing and adjusting comprehensive development planning for the economy and society, planning for the development of key industries and products is guaranteed by state budget investment funds and allocated in the annual plan.

- Frameworks and standard cost estimates for constructing and adjusting comprehensive development planning for the economy and society at the national, territorial, provincial, and county levels; standard cost estimates for planning the development of key industries, fields, and products at the national level and planning the development of key industries and products at the provincial level are issued by the Ministry of Planning and Investment with the participation of the Ministry of Finance and related functional ministries. While there is no new decision on frameworks and standard cost estimates for planning, the preparation of project funding budgets is carried out according to Decision No. 519/2002/QĐ-BKH dated August 26, 2002 of the Minister of Planning and Investment.

6. Consulting Agencies for Preparing Planning (guidelines for implementing Point 2, Article 10 of the Decree)

Domestic and foreign research organizations with planning functions and sufficient capacity and experience to meet the requirements of planning projects can be invited by the state agency responsible for preparing planning to provide consulting services for planning construction.

The selection of consulting organizations to prepare planning projects shall be carried out through bidding or direct assignment (as stipulated in Articles 1, 2, 3, Article 20 of the Bidding Law; Article 101 of the Construction Law and Article 35 of Decree No. 111/2006/NĐ-CP guiding the implementation of the Bidding Law). The organization and conduct of bidding to select and decide on consulting organizations for preparing planning projects shall be conducted in accordance with the current provisions of the Bidding Law.

Organizations participating in bidding for planning projects must have legal status for planning activities, possess appropriate professional qualifications for planning in accordance with the nature of the planning project, and have sound financial conditions.

The tenderer's proposal for the winning bid or direct assignment must ensure the following conditions:

- Possess sufficient capacity and experience as per the request for proposal.

- Have technical proposals that meet the requirements of the request for proposal according to the evaluation criteria agreed upon by the investor.

- Propose a price not exceeding the budget estimate of the planning project within the current framework of planning development cost standards.

II. REGARDING THE STATE MANAGEMENT OF PLANNING

1. Planning work for planning (guidance for implementing Point 1, Article 11 of the Decree)

The Ministry of Planning and Investment is responsible for compiling plans to implement planning work nationwide. Central ministries, sectors, provinces, and centrally-administered cities are responsible for developing annual plans for planning work according to their state management functions, while also submitting them to the Ministry of Planning and Investment and the Ministry of Finance. The time for preparing and submitting reports on planning work plans should coincide with the time for preparing the state budget estimates annually to compile plans for submission to the Prime Minister for decision.

2. Reviewing planning projects for economic and social development

The process of reviewing planning projects for economic and social development as specified in Clause 1, Article 29 of the Decree is guided as follows:

- Requirements for maps in the review dossier: Depending on the scale of the planned territory, the maps required under Item d), Point 1, Article 29 of Decree No. 92/2006/NĐ-CP need to be designed and presented in A3 format along with the comprehensive planning report. The quantity and content of large-scale maps will be determined based on the requirements for managing and directing the implementation of the plan by leaders at various levels.

- Within no more than 7 days from receiving the review dossier of the planning project, the agency conducting the review must notify in writing the proposing agency if the dossier is incomplete.

- The review period for the planning project is 45 days from the date the reviewing agency receives a valid review dossier.

- The reviewing agency bears legal responsibility for the review results in accordance with current laws as recorded in Decree No. 92/2006/NĐ-CP.

Authority to review overall planning projects for economic and social development as specified in Article 31 of the Decree is guided as follows:

In addition to the authority to review as stipulated in Article 31 of the Decree, planning for special economic regions such as economic corridors, economic belts, border zones, and economic zones spanning multiple provinces shall be reviewed by a State-level Review Board established by the Prime Minister, involving relevant ministries and sectors, and submitted to the Prime Minister for approval.

Planning for border economic zones, inter-district or inter-commune areas with key economic functions of provinces shall be reviewed by provincial Planning and Investment Departments and submitted to the Chairman of the Provincial People's Committee for approval.

3. Reporting system (guidance for implementing Point 6, Article 11 of the Decree)

All levels are responsible for reporting the results of planning project preparation, review, and approval to the planning management agency and the directly superior administrative agency within 15 days from the date of publication in the Official Gazette for compilation and reporting to the Ministry of Planning and Investment, which manages planning work nationwide.

Reports on the implementation of planning by agencies managing overall economic and social development planning at all levels shall be prepared at the end of the third quarter each year and submitted to the higher-level planning management agency.

4. Publicizing approved planning (guidance for implementing Point 7, Article 11 of the Decree)

Within no more than 10 days from the effective date of the Decision approving the plan, planning management agencies at all levels are responsible for publishing in writing the plan within their management function (excluding those requiring confidentiality) to relevant sectors and levels; simultaneously publicizing the plan through media channels to businesses, citizens, domestic and foreign investors.

5. Regarding inspection, audit, and supervision of planning (guidance for implementing Point 9, Article 11 of the Decree)

- Inspection of planning work shall be carried out in accordance with Government Decree No. 99/2006/NĐ-CP dated June 15, 2006, on inspection of policy, strategy, planning, and plan implementation.

- During the inspection, audit, and supervision process, if unreasonable aspects are found in planning projects, they should be reported to the approving authority; if violations are discovered during the implementation of the plan (activities not in accordance with the approved plan), they should be reported to the competent authority for consideration and resolution, and notified in writing to the Ministry of Planning and Investment.

- Agencies authorized to inspect and audit planning must report the results of the inspection and audit to the directly superior level within no more than 15 days from the final conclusion date of the audit and inspection according to the requirements of the competent authority.

III. REGARDING THE CONTENT OF PLANNING

OVERALL ECONOMIC AND SOCIAL DEVELOPMENT

1. Regarding environmental protection content in overall planning projects for economic and social development (guidance for implementing Points 8 of Articles 12, 16, 19, 22)

Strategic environmental assessment for planning at the stages of drafting, reviewing, approving plans, as well as implementing the contents of this assessment during the implementation of the plan must comply with the provisions of Decree No. 140/2006/NĐ-CP on environmental protection in the stages of drafting, reviewing, approving, and organizing the implementation of strategies, plans, programs, and development projects.

2. Regarding the content of the industry, sector, and product development planning project (guidance on implementing Article 26 of the Decree)

The content of the industry, sector, and product development planning will be guided by relevant ministries and sectors in conjunction with the Ministry of Planning and Investment (as stipulated in Point 3, Article 11 of the Decree).

IV. IMPLEMENTATION

1. This Circular shall take effect fifteen days from the date of publication in the Official Gazette.

2. In the course of implementation, if there are any difficulties or issues requiring discussion, please contact the Ministry of Planning and Investment directly for consideration and resolution./.

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

下载

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

关系图

↑ 依据及影响本文件的文件
依据 28
92/2006/NĐ-CP Nghị định số 92/2006/NĐ-CP Về lập, phê duyệt và quản lý quy hoạch tổng thể phát triển kinh tế - xã hội 生效中 99/2006/NĐ-CP Nghị định số 99/2006/NĐ-CP Về công tác kiểm tra việc thực hiện chính sách,chiến lược, quy hoạch, kế hoạch 生效中 61/2003/NĐ-CP Nghị định số 61/2003/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Kế hoạch và Đầu tư. 已失效 318/2013/QĐ-UBND Quyết định số 318/2013/QĐ-UBND ban hành Quy định về quản lý quy hoạch trên địa bàn tỉnh Bắc Giang 已失效 1739/QĐ-UBND Quyết định số 1739/QĐ-UBND Phê duyệt Quy hoạch phát triển mạng lưới cửa hàng xăng dầu tỉnh Hà Giang đến năm 2015 已失效 1827/QĐ-UBND Quyết định số 1827/QĐ-UBND Phê duyệt quy hoạch phát triển ngành cơ khí thành phố Hồ Chí Minh đến năm 2010, tầm nhìn đến năm 2020 生效中 20/2017/NQ-HĐND Nghị quyết số 20/2017/NQ-HĐND Về thông qua Quy hoạch phát triển ngành thương mại Thành phố Hồ Chí Minh đến năm 2025, định hướng đến năm 2030. 生效中 2217/QĐ-UBND Quyết định số 2217/QĐ-UBND Về việc phê duyệt Đề án Quy hoạch phát triển ngành dịch vụ thành phố Hải Phòng đến năm 2020 do Ủy ban nhân dân thành phố Hải Phòng ban hành 已失效 2436/QĐ-UBND Quyết định 2436/QĐ-UBND năm 2007 phê duyệt quy hoạch phát triển ngành Công nghiệp hóa chất thành phố Hồ Chí Minh đến năm 2010, có tính đến năm 2020 do Ủy ban nhân dân thành phố Hồ Chí Minh ban hành 生效中 391/QĐ-UBND Quyết định số 391/QĐ-UBND v/v năm 2008 phê duyệt đề cương và dự toán kinh phí lập quy hoạch phát triển mạng lưới xăng dầu tỉnh Điện Biên giai đoạn đến năm 2020 do Ủy ban nhân dân tỉnh Điện Biên ban hành 生效中 07/2008/QĐ-UBND Quyết định số 07/2008/QĐ-UBND Phê duyệt Quy hoạch tổng thể phát triển kinhh tế - xã hội thành phố Thái Nguyên đến năm 2020 已失效 19/2012/QĐ-UBND Quyết định số 19/2012/QĐ-UBND Phê duyệt Quy hoạch tổng thể phát triển kinh tế - xã hội huyện Đồng Hỷ đến năm 2020 已失效 03/2008/QĐ-UBND Quyết định số 03/2008/QĐ-UBND Phê duyệt Quy hoạch chăn nuôi, giết mổ, chế biến, tiêu thụ: Trâu, bò các loại gia súc trên địa bàn tỉnh Bình Phước giai đoạn 2006-2020 已失效 27/2011/NQ-HĐND Nghị quyết số 27/2011/NQ-HĐND Thông qua điều chỉnh Quy hoạch tổng thể phát triển kinh tế - xã hội tỉnh Đắk Nông đến năm 2020 已失效 67/2011/QĐ-UBND Quyết định số 67/2011/QĐ-UBND Phê duyệt Quy hoạch tổng thể phát triển kinh tế - xã hội huyện Định Hóa đến năm 2020 已失效 37/2011/QĐ-UBND Quyết định số 37/2011/QĐ-UBND Phê duyệt Quy hoạch Tổng thể phát triển kinh tế- xã hội huyện Đại Từ đến năm 2020 已失效 19/2008/QĐ-UBND Quyết định số 19/2008/QĐ-UBND Về việc phê duyệt “Quy hoạch phát triển công nghệ thông tin tỉnh Gia Lai đến năm 2015 và định hướng đến năm 2020” 已失效 16/2011/NQ-HĐND Nghị quyết số 16/2011/NQ-HĐND Thông qua Quy hoạch phát triển giao thông vận tải tỉnh Lâm Đồng đến năm 2020 và định hướng đến năm 2030 生效中 101/2007/QĐ-UBND Quyết định số 101/2007/QĐ-UBND Về việc phê duyệt quy hoạch phát triển Bưu chính - Viễn thông trên địa bàn tỉnh Gia Lai đến năm 2015 và định hướng đến năm 2020 已失效 2646/QĐ-UBND Quyết định số 2646/QĐ-UBND Về việc phê duyệt điều chỉnh Quy hoạch Bưu chính, Viễn thông và Công nghệ thông tin tỉnh Bình Phước giai đoạn 2006 - 2010, định hướng đến năm 2020 生效中 24/2011/NQ-HĐND Nghị quyết số 24/2011/NQ-HĐND Về việc Điều chỉnh Quy hoạch tổng thể phát triển kinh tế - xã hội tỉnh Yên Bái thời kỳ 2006 - 2020 已失效 84/2009/QĐ-UBND Quyết định số 84/2009/QĐ-UBND Về sửa đổi, bổ sung một số điều của Quy định về định mức chi phí lập, thẩm định quy hoạch và điều chỉnh quy hoạch tổng thể phát triển kinh tế - xã hội, quy hoạch phát triển ngành và quy hoạch các sản phẩm chủ yếu trên địa bàn thành phố Hồ Chí Minh ban hành kèm theo Quyết định số 77/2008/QĐ-UBND ngày 29 tháng 10 năm 2008 của Ủy ban nhân dân thành phố. 已失效 31/2008/QĐ-UBND Quyết định số 31/2008/QĐ-UBND Phê duyệt Quy hoạch ngành Điều tỉnh Bình Phước giai đoạn 2006 - 2020 生效中 03/2010/NQ-HĐND Nghị quyết số 03/2010/NQ-HĐND Về Quy hoạch tổng thể phát triển kinh tế - xã hội tỉnh Lạng Sơn đến năm 2020 已失效 01/2008/QĐ-UBND Quyết định số 01/2008/QĐ-UBND Phê duyệt Quy hoạch chăn nuôi, giết mổ, chế biến, tiêu thụ gia cầm tập trung trên địa bàn tỉnh Bình Phước giai đoạn 2006 - 2020 已失效 150/QĐ-UBND Quyết định số 150/QĐ-UBND v/v năm 2008 phê duyệt dự án "Quy hoạch tổng thể phát triển Du lịch tỉnh Điện Biên giai đoạn đến năm 2020" 生效中 21/2011/QĐ-UBND Quyết định số 21/2011/QĐ-UBND Ban hành Quy định về lập, thẩm định, phê duyệt và quản lý quy hoạch tổng thể phát triển kinh tế - xã hội trên địa bàn tỉnh Ninh Thuận 生效中 18/2007/QĐ-UBND Quyết định số 18/2007/QĐ-UBND Về việc phê duyệt Quy hoạch phát triển kinh tế - xã hội miền Tây tỉnh Quảng Trị đến năm 2010, có tính đến năm 2015 已失效
01/2007/TT-BKH
Circular No. 01/2007/TT-BKH guiding the implementation of certain provisions of Government Decree No. 92/2006/NĐ-CP dated September 7, 2006 on the establishment, approval, and management of comprehensive socio-economic development planning.
Expired
↓ 受本文件影响的文件
相关 22
21/2011/QĐ-UBND Quyết định số 21/2011/QĐ-UBND Về việc ban hành Quy chế Thi đua, Khen thưởng 已失效 77/2008/QĐ-UBND Quyết định số 77/2008/QĐ-UBND Ban hành quy chế làm việc mẫu của cơ quan chuyên môn, cơ quan thuộc Ủy ban nhân dân tỉnh Bà Rịa - Vũng Tàu 生效中 2646/QĐ-UBND Quyết định 2646/QĐ-UBND năm 2009 bổ nhiệm giám định viên pháp y do Chủ tịch Ủy ban nhân dân thành phố Hồ Chí Minh ban hành 生效中 16/2011/NQ-HĐND Nghị quyết số 16/2011/NQ-HĐND Về việc thông qua quy định mức thu, chế độ thu, nộp, quản lý và sử dụng lệ phí cấp Giấy phép kinh doanh vận tải bằng xe ô tô áp dụng trên địa bàn tỉnh Gia Lai 已失效 03/2010/NQ-HĐND NGHỊ QUYẾT SỐ 03/2010/NQ-HĐND VỀ CHUYỂN ĐỔI CÁC TRƯỜNG MẦM NON BÁN CÔNG TRÊN ĐỊA BÀN TỈNH QUẢNG NGÃI SANG LOẠI HÌNH TRƯỜNG CÔNG LẬP 已失效 31/2008/QĐ-UBND Quyết định số 31/2008/QĐ-UBND V.v quy định một số điều về quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Hải Dương 已失效 67/2011/QĐ-UBND QUYẾT ĐỊNH SỐ 67/2011/QĐ-UBND BAN HÀNH QUY ĐỊNH GIẢI QUYẾT THỦ TỤC HÀNH CHÍNH THEO CƠ CHẾ “MỘT CỬA” TẠI SỞ TÀI CHÍNH TỈNH NINH THUẬN 已失效 07/2008/QĐ-UBND Quyết định số 07/2008/QĐ-UBND Ban hành Quy chế Tổ chức và hoạt động của Phòng Tiếp công dân tỉnh Quảng Trị 已失效 150/QĐ-UBND Quyết định số 150/QĐ-UBND Về Quy định mức trợ cấp ngày công lao động, hỗ trợ tiền ăn cho lực lượng Dân quân tự vệ 已失效 84/2009/QĐ-UBND Quyết định số 84/2009/QĐ-UBND Ban hành Đề án kiểm soát dân số các vùng biển, đảo và ven biển tỉnh Bà Rịa – Vũng Tàu giai đoạn 2009 - 2020 已失效 03/2008/QĐ-UBND Quyết định số 03/2008/QĐ-UBND Về việc ban hành quy chế quản lý và sử dụng kinh phí sự nghiệp kinh tế đối với hoạt động khuyến công trên địa bàn tỉnh 已失效 01/2008/QĐ-UBND Quyết định số 01/2008/QĐ-UBND Về việc Ban hành văn bản quy phạm pháp luật hết hiệu lực pháp luật 生效中 23/2011/QĐ-UBND Quyết định số 23/2011/QĐ-UBND Ban hành quy định quản lý, vận hành sử dụng hệ thống giao ban điện tử trực tuyến tỉnh nghệ an 生效中 101/2007/QĐ-UBND Quyết định số 101/2007/QĐ-UBND Về việc chuyển các trường trung học phổ thông bán công thành trường trung học phổ thông công lập và học sinh trung học phổ thông bán công (hệ B) trong các trường trung học phổ thông công lập sang hệ công lập 已失效 19/2008/QĐ-UBND Quyết định số 19/2008/QĐ-UBND Về việc thành lập Sở Thông tin và Truyền thông tỉnh Hậu Giang 已失效 32/2010/QĐ-UBND Quyết định số 32/2010/QĐ-UBND Ban hành quy định về quản lý nhà nước đối với hoạt động đo đạc và bản đồ trên địa bàn tỉnh Long An 已失效 24/2011/NQ-HĐND Nghị quyết số 24/2011/NQ-HĐND Về việc quyết định về ưu đãi và hỗ trợ đầu tư, quy trình và thủ tục thực hiện ưu đãi và hỗ trợ đầu tư áp dụng trên địa bàn tỉnh Gia Lai 已失效 19/2012/QĐ-UBND QUYẾT ĐỊNH SỐ 19/2012/QĐ-UBND VỀ VIỆC BAN HÀNH QUY CHẾ QUẢN LÝ TÀI CHÍNH CỦA CÁC TRUNG TÂM HỌC TẬP CỘNG ĐỒNG TẠI XÃ, PHƯỜNG, THỊ TRẤN TRÊN ĐỊA BÀN TỈNH BÌNH THUẬN 生效中 37/2011/QĐ-UBND Quyết định số 37/2011/QĐ-UBND Ban hành các nguyên tắc, tiêu chí và định mức phân bổ vốn đầu tư phát triển cho cấp huyện từ nguồn vốn ngân sách địa phương giai đoạn 2012 – 2015 và quy định hỗ trợ có mục tiêu từ vốn đầu tư do tỉnh quản lý 已失效 27/2011/NQ-HĐND Nghị quyết số 27/2011/NQ-HĐND Về việc phê chuẩn điều chỉnh, bổ sung quyết toán ngân sách nhà nước năm 2009 của huyện Đakrông 已失效 18/2007/QĐ-UBND Quyết định số 18/2007/QĐ-UBND Về việc thu hồi Quyết định số 871/1998/QĐ/UBT ngày 25/5/1998 của Uỷ ban nhân dân tỉnh Vĩnh Long 生效中 20/2010/QĐ-UBND Quyết định số 20/2010/QĐ-UBND về việc bổ sung, sửa đổi một số điều Quy chế tuyển dụng công chức xã, phường, thị trấn ban hành kèm theo Quyết định số 3417/2004/QĐ-UB ngày 30 tháng 11 năm 2004 của UBND tỉnh 已失效

点击文件即可打开。红色边框=改变效力的关系。