Circular No. 02/2018/TT-BKHĐT guiding the implementation of certain contents of Decision No. 38/2016/QĐ-TTg dated September 14, 2016 of the Prime Minister on issuing some policies for forest protection, development, and investment support for infrastructure and public service tasks for agricultural and forestry companies.

This Circular provides detailed regulations on forest production development projects for the period 2016-2020 pursuant to Decision No. 38/2016/QĐ-TTg. The Circular guides the support for afforestation, survey design, issuance of land use right certificates, construction of forestry seedling infrastructure, and wood processing with specific cost levels for each project component.

文号02/2018/TT-BKHĐT
文件类型Circular
发布机关Ministry of Finance
签署人Nguyễn Chí Dũng — Bộ trưởng
更新18/06/2026
领域Uncategorized
发布日期14/05/2018
生效日期29/06/2018
失效日期
状态In effect
✦ 智能摘要

This Circular provides detailed regulations on forest production development projects for the period 2016-2020 pursuant to Decision No. 38/2016/QĐ-TTg. The Circular guides the support for afforestation, survey design, issuance of land use right certificates, construction of forestry seedling infrastructure, and wood processing with specific cost levels for each project component.

适用范围

This Circular applies to the Ministers, Heads of ministerial-level agencies, agencies under the Government; Chairpersons of provincial People's Committees directly under the central government, and related units in implementing forest production development projects for the period 2016-2020.

要点

  • Support for afforestation: from VND 5,000 to VND 10,000 per hectare depending on the region and type of tree.
  • Survey, design, and contract signing costs: VND 300 per hectare.
  • Issuance of land use right certificate: VND 150 to VND 300 per hectare.
  • Firebreak road: VND 30,000 per kilometer.
  • Support for MDF factory: VND 20 million per factory.
  • New nursery: VND 300,000 per nursery.

🌐 本文件的社会影响

  • Enhancing investment in forest production development, contributing to environmental protection and biodiversity.
  • Supporting people in afforestation and issuance of land use right certificates.
  • Developing the wood processing industry, creating jobs and income for workers.

❓ 常见问题

When does this Circular take effect?

This Circular takes effect from June 19, 2018.

How are ongoing projects prior to this Circular applied?

Projects being implemented according to previous regulations will continue until the end of 2015. Unimplemented components (unapproved technical designs, budgets) will be subject to new regulations.

全文

MINISTRY OF PLANNING AND INVESTMENT ___

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
_____________

No.:  02/2018/TT-BKHĐT

Hanoi, on 14 the 5 Implementing the Agreement Establishing the ASEAN-Australia-New Zealand Free Trade Area signed on February 27, 2009 at the 14th Summit Meeting in Thailand between the member states of the Association of Southeast Asian Nations and Australia and New Zealand;

CIRCULAR

Guidelines for Implementing Certain Provisions of Decision No. 38/2016/QĐ-TTg dated September 14, 2016 of the Prime Minister on Issuing Certain Policies for Forest Protection and Development and Investment Support for Infrastructure and Public Service Tasks for Agricultural and Forestry Companies

_____________

Pursuant to the Law on Public Investment dated June 18, 2014;

Pursuant to Decree No. 86/2017/NĐ-CP dated July 25, 2017 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Planning and Investment;

Pursuant to Decree No. 118/2014/NĐ-CP dated December 17, 2014 of the Government on the reorganization, reform, development, and enhancement of operational efficiency of agricultural and forestry companies;

Pursuant to Decree No. 136/2015/NĐ-CP dated December 31, 2015 of the Government guiding the implementation of some provisions of the Public Investment Law;

Pursuant to Decision No. 38/2016/QĐ-TTg dated September 14, 2016 of the Prime Minister on issuing certain policies for forest protection and development and investment support for infrastructure and public service tasks for agricultural and forestry companies;

At the proposal of the Director of the Department of Agricultural Economysession number,

The Minister of Planning and Investment issues this Circular guiding the implementation ofcertain provisions of Decision No. 38/2016/QĐ-TTg dated September 14, 2016 of the Prime Minister on issuing certain policies for forest protection and development and investment support for infrastructure and public service tasks for agricultural and forestry companies.

Chapter 1 - GENERAL PROVISIONS

Article 1. Scope of Regulation and Applicability

2. Applicability:

This Circular guides the implementation of certain provisions stipulated in Decision No. 38/2016/QĐ-TTg dated September 14, 2016 of the Prime Minister on issuing certain policies for forest protection and development and investment support for infrastructure and public service tasks for agricultural and forestry companies (hereinafter referred to as Decision No. 38/2016/QĐ-TTg), including:

a) Standard support levels as set out in Appendix I attached hereto.

b) Implementation contents of projects for forest protection and development, afforestation; scattered tree planting; seedling forests, seedling gardens; high-quality forest seed production; seedling nurseries; forest road support; high-tech forest zones; wood processing; investment support projects for infrastructure and public service tasks for agricultural and forestry companies.

c) Project completion inspection.

第二条 组织和实施奖励工作的支出水平,如政府第152/2025/NĐ-CP号决定关于分级授权和奖励领域的分权规定

This Circular applies to organizations, households, individuals, and community residents as stipulated in Clause 2, Article 2 of Decision No. 38/2016/QĐ-TTg.

Article 2. Interpretation of Terms

1. State-established organizations in this Circular include: State-owned enterprises (state-run enterprises), Forest Inspection Stations, Border Guard Posts, management boards of protective forests, management boards of special-use forests (including national parks, nature reserves, species and habitat conservation areas), and other boards established by the state in accordance with the law.

2. Forest engineering works in this Circular include: Afforestation, forest care (including construction and transformation of seedling forests, seedling gardens, experimental forests, integrated agriculture and forestry afforestation, replacement afforestation); forest protection and encirclement regeneration; seed production (seedlings); nursery construction; firebreak construction.

3. Forest engineering cycle: Forest protection and encirclement regeneration contract averaging 5 years; Small timber afforestation, encirclement regeneration with supplementary planting averaging 7 years; Large timber afforestation, averaging 10 years. The Provincial People's Committee decides specifically on the forest engineering cycle when approving the project.

4. A forest protection and development project is a project that includes one or more components throughout the forest engineering cycle, including: Production forest afforestation; special-purpose forest afforestation; protective forest afforestation; scattered tree planting; forest protection and encirclement regeneration; infrastructure works serving forest engineering.

5. Infrastructure works serving forest engineering include: Fire lookout towers; fire warning signs; internal regulations signs; afforestation project signs; nurseries; firebreaks; forest protection stations; forest workers' huts; forest fire prevention works; dormitories for agricultural and forestry company employees.

Chapter 2 - SPECIFIC PROVISIONS

Article 3. Establishment, Review, and Approval of Investment Projects

The establishment, review, and approval of projects shall be carried out in accordance with the provisions of the Public Investment Law and Decree No. 136/2015/NĐ-CP dated December 31, 2015 of the Government guiding the implementation of certain Articles of the Public Investment Law and Decree No. 59/2015/NĐ-CP dated June 18, 2015 of the Government on project management for construction investment.

Article 4. Scope of Projects

1. The scale of a forest protection and development project, a reforestation project must be at least 500 hectares; for mangrove forests, it must be at least 300 hectares. In cases where a province does not have sufficient area, the People's Committee of the province may establish a forest protection and development project.

2. Within the territory of a district, only one forest protection and development project using central budget funds managed by localities can be established. Central budget support is provided according to the provisions of Clause 4, Article 17, Decision No. 38/2016/QĐ-TTg. If there is already a special-use forest management board in the area, that board will act as the project sponsor.

Article 5. Implementation of Reforestation and Forest Protection and Development Projects by State-Owned Organizations as Project Sponsors

1. The implementation of forest protection and development projects, reforestation, and regeneration with supplementary planting must be stably contracted to people from planting, care, and protection stages according to the forestry cycle and benefit sharing as stipulated in Decision No. 38/2016/QĐ-TTg.

2. The project sponsor signs a reforestation and forest protection and development contract with households and groups participating in reforestation including technical design guidance and approved forestry works budget.

3. When people are assigned land for reforestation and forest development, they can plant forests themselves first and then receive support afterward according to the prescribed standards.

4. For long-term stable agricultural land transferred to people, they can plant forests themselves first. Areas planted into forests will be prioritized for inclusion in provincial reforestation and forest protection and development projects supported after investment and capital support according to regulations.

5. A list of households participating in reforestation and forest development is publicly posted at the commune People's Committee, village cultural house, and community about the area and amount received.

6. For reforestation land of agricultural and forestry companies that have been privatized according to Decree No. 118/2014/NĐ-CP dated December 17, 2014 of the Government, when the state owns more than 50% of the charter capital and receives support to implement reforestation projects, it will be stably contracted to household families.

Article 6. Implementation of Reforestation and Forest Protection and Development Projects by Private Enterprises, Limited Liability Companies, Joint Stock Companies with State Ownership Below 50% of Charter Capital, Partnership Companies, and Cooperatives as Project Sponsors

1. The project sponsor prepares technical design documents and works budget, self-approves technical design documents and works budget according to Clause 2, Article 19, Decision No. 38/2016/QĐ-TTg.

2. The project sponsor can independently carry out reforestation and forest development and receive post-investment support according to the prescribed standards when the forest is accepted.

Article 7. Implementation of Scattered Tree Planting

1. The project sponsor organizes seedling cultivation or contracts to purchase seedlings, plans planting, and organizes for participants to register planting specifying planting location, planting time, and tree species.

2. Household scattered tree planting along field boundaries combines with protecting agricultural crops.

3. Scattered trees on public land (roads, ditches) are prioritized to be contracted to organizations such as Youth Union, Veterans Association, Farmers' Association, Women's Union, cooperatives, and community residents to plant and benefit from.

4. Scattered tree planting is implemented through planting first and receiving post-investment support when the trees are accepted.

Article 8. Implementation of investment in fire prevention forest boundary roads (firebreak roads)

1. The investor shall prepare an investment plan (master plan) for firebreak roads. State support funds shall not be used for compensation and land clearance if the firebreak road passes through areas owned by forest owners.

2. When preparing the plan (master plan), priority should be given to supplementing fire prevention forest boundary roads for production forests that were planted previously but have not yet received support.

Article 9. Implementation of investment and ordering services for agricultural and forestry companies (as stipulated in Clause 2, Article 1 of Decree No. 118/2014/NĐ-CP)

1. Agricultural and forestry companies with protective and production forests that are natural forests not yet at harvest age, based on the current quota for managing and protecting forests, shall prepare a budget estimate for support at 50% of the average quota for managing and protecting forests as specified in Point a, Clause 2, Article 15 of Decision No. 38/2016/QĐ-TTg. The cycle for supporting ordered forest protection quotas is five years. The Department of Agriculture and Rural Development shall review and report to the People's Committee of the province for approval and assignment of the ordered forest management and protection plan to the agricultural and forestry company for forest management and protection.

2. Support for building forest management and protection stations, fire prevention facilities, and collective housing for workers.

a) Agricultural and forestry companies shall develop a forest protection and development project including the construction of forest management and protection stations, fire prevention facilities, and collective housing for workers.

b) In cases where agricultural and forestry companies do not develop forest protection and development projects or afforestation projects but require the construction of forest management and protection stations, fire prevention facilities, and collective housing for workers, these companies shall develop separate projects for these facilities. These facilities may use standard designs for common use to reduce administrative procedures for businesses. Provincial People's Committees shall issue standard designs for implementation.

c) After the project is approved, the investor shall implement the design and construction and shall be supported post-investment according to the standards set out in Appendix I.

Article 10. Acceptance of forest protection and development projects, seedling forest projects; seedling nurseries; high-quality tree seedling production; seedling nurseries; high-tech forestry zones; wood processing projects of private enterprises, limited liability companies, joint-stock companies with state ownership below 50% of the charter capital, and partnership companies shall be supported post-investment

1. Based on the acceptance proposal from the investor, the Department of Agriculture and Rural Development shall take the lead in inviting relevant agencies to accept the investor's project within 15 days.

2. Content of acceptance: Acceptance of project components or the entire project volume requiring support according to the standards set out in Appendix I; including acceptance of actual capacity of equipment (if applicable).

3. Acceptance team: The leader of the Department of Agriculture and Rural Development shall chair the Acceptance Board, members including representatives from the Department of Planning and Investment, the Department of Finance, and other relevant agencies.

4. The acceptance record of the Acceptance Board is sufficient basis for disbursing post-investment support funds to the investor.

5. Payment documents: The investor shall submit payment documents requesting disbursement of support funds including: the acceptance record, the support fund decision from the competent authority sent to the State Treasury for disbursement of the support amount.

Article 11. Acceptance of support projects and works before completion

1. The acceptance of forestry production works shall be carried out in accordance with Circular No. 23/2016/TT-BNNPTNT dated June 30, 2016 of the Ministry of Agriculture and Rural Development and current regulations.

2. For the remaining projects (as stipulated in Decision No. 38/2016/QĐ-TTg), implementation and acceptance shall be conducted in accordance with current construction regulations.

Chapter 3 - IMPLEMENTATION PROVISIONS

Article 12. Responsibility for Implementation

The Minister, Heads of Ministries at the level of ministerial departments, Heads of provincial People's Committees under the central government, and Heads of related units shall be responsible for implementing this Circular.

Article 13. Effective Date

1. This Circular takes effect from June 19, 2018.

2. Matters not covered in this Circular shall be implemented in accordance with current regulations.

3. This Circular replaces Joint Circular No. 03/2012/TTLT-BKHĐT-BNNPTNT-BTC dated June 5, 2012, and Joint Circular No. 04/2013/TTLT-BKHĐT-BNNPTNT-BTC dated August 19, 2013, issued by the Ministry of Planning and Investment, Ministry of Agriculture and Rural Development, and Ministry of Finance to guide the implementation of Decisions No. 147/2007/QĐ-TTg dated September 10, 2007, and No. 66/2011/QĐ-TTg dated December 9, 2011 of the Prime Minister on certain policies for developing production forests during the period 2007-2015.

4. Projects currently being implemented according to Joint Circular No. 03/2012/TTLT-BKHĐT-BNNPTNT-BTC dated June 5, 2012, and Joint Circular No. 04/2013/TTLT-BKHĐT-BNNPTNT-BTC dated August 19, 2013, guiding the implementation of Decisions No. 147/2007/QĐ-TTg dated September 10, 2007, and No. 66/2011/QĐ-TTg dated December 9, 2011 on certain policies for developing production forests during the period 2007-2015, shall continue to be implemented after January 1, 2016, in accordance with Clause 2, Article 21 of Decision No. 38/2016/QĐ-TTg, either in accordance with the aforementioned Joint Circulars or this Circular; components of the project that have not yet been implemented (not yet approved for technical design and budget estimate) shall be applied in accordance with this Circular.

5. In the course of implementation, if there are difficulties or obstacles, please promptly report them to the Ministry of Planning and Investment and relevant ministries and sectors for study and appropriate amendment and supplementation.

 

  Place of Receipt:
- Prime Minister, Deputy Prime Ministers;
- Central Party Office;
- National Assembly's Office;
- President's Office;
- Office of the Central Steering Committee for Anti-Corruption;
- Supreme People's Procuracy:
- Supreme People's Court;
- State Audit Agency;
- Ministries, agencies equivalent to ministries, and government agencies;
- Provincial People's Committees under the Central Government;
- Provincial Departments of Planning and Investment under central cities;
- Department of Legal Drafting - Ministry of Justice;
- Official Gazette;
- Government Website; Ministry of Planning and Investment Website;
- Units under the Ministry;
- To be filed with the General Department of Archives and the State Audit Office (5 copies);

MINISTRY HEAD

(Signed)

 

 




Nguyen Chi Dung

ANNEX I

 SUPPORT LEVEL FOR PROJECTS AS PROVIDED IN DECISION

NO. 38/2016/QĐ-TTG ON SEPTEMBER 14, 2016

(Attached to Circular No.  02 /2018/TT-BKHĐT dated 14 the 5 Article 2. The receipt, handling of reflections and petitions from individuals and organizations concerning administrative regulations shall be carried out in accordance with Decree No. 20/2008/NĐ-CP dated February 14, 2008 of the Government on the receipt, handling of reflections and petitions from individuals and organizations concerning administrative regulations (amended and supplemented by Decree No. 48/2013/NĐ-CP dated May 14, 2013 on amending and supplementing certain articles of decrees related to administrative procedure control and Decree No. 92/2017/NĐ-CP dated August 7, 2017 on amending and supplementing certain articles of decrees related to administrative procedure control).8 of the Ministry of Planning and Investment) 

No.

Support Content

Unit of Measurement

Support Level

1

Support for afforestation, survey, design

   

1.1

Border communes

   

a

Large timber, multi-purpose, native

 

 

b

At border communes and provinces of Son La, Dien Bien, Lai Chau, Central Highlands

thousand dong/ha

10.000

specialized agency under the People's Committee of the province/city.

Small timber, scattered

thousand dong/ha

7.000

For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;

Forestry promotion costs over 4 years (1 year planting and 3 years maintenance)

thousand dong/ha

500

Average loan repayment period is 10 years;

Survey, design, contract signing costs

thousand dong/ha

300

1.2

Outside border communes

   

a

Large timber, multi-purpose, native

thousand dong/ha

8.000

b

Small timber, scattered

thousand dong/ha

5.000

specialized agency under the People's Committee of the province/city.

Forestry promotion costs over 4 years (1 year planting and 3 years maintenance)

thousand dong/ha

500

For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;

Survey, design, contract signing costs

thousand dong/ha

300

1.3

Support for digitalizing maps and establishing production forest projects

   

a

Costs for establishing and reviewing production forest projects

thousand dong/ha

100

b

Completion maps and digitalized maps

thousand dong/ha

50

2

Support for land use right certificates

   

a

One-time costs for land transfer; issuance of land use right certificates, forest land allocation (individuals, households)

thousand dong/ha

300

b

One-time costs for land transfer; issuance of land use right certificates, forest land allocation (organizations, communities)

thousand dong/ha

150

3

Support for Sustainable Forest Certification (at least 100 ha for natural forests, planted forests)

thousand dong/ha

300

4

Firebreak roads, forest roads

   

a

Firebreak roads

thousand dong/km

30.000

b

Forest roads

thousand dong/km

450.000

5

Support for forest nursery infrastructure, management stations, wood processing plants

   

a

Support for MDF plant (> 30,000m3)

Million dong/plant

20.000

b

Support for wood chip, plywood, bamboo pressing plants (< 30,000m3)

Million dong/plant

10.000

specialized agency under the People's Committee of the province/city.

Upgrading nurseries

Thousand dong/nursery

75.000

For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;

New nurseries

Thousand dong/nursery

300.000

đ

New seedling planting

Thousand dong/nursery

55.000

Average loan repayment period is 10 years;

New seedling forest planting

Thousand dong/ha

40.000

g

Converted seedling forest

thousand dong/ha

15.000

h

Seedling centers

Million dong/center

5.000

6

Conversion rate

   

a

1 m3 MDF board

equivalent to 750kg

b

1 m3 HDF board

equivalent to 1000kg

specialized agency under the People's Committee of the province/city.

1 m3 particleboard, plywood

equivalent to 700kg

For coal-fired thermal power plants where the enterprise holds 100% of the registered capital and uses 100% of its own capital to invest in the project approved by the competent authority, E is determined as 100%;

1 m3 bamboo, reed: pressed boards, blocks, strips

equivalent to 1000kg

 

原始文件(PDF)

在新标签页打开PDF ↗

关系图

↑ 依据及影响本文件的文件
依据 9
118/2014/NĐ-CP Nghị định số 118/2014/NĐ-CP Về sắp xếp, đổi mới và phát triển, nâng cao hiệu quả hoạt động của công ty nông, lâm nghiệp 生效中 49/2014/QH13 Luật Đầu tư công số 49/2014/QH13 已失效 136/2015/NĐ-CP Nghị định số 136/2015/NĐ-CP Hướng dẫn thi hành một số điều của Luật Đầu tư công 生效中 86/2017/NĐ-CP Nghị định số 86/2017/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Kế hoạch và Đầu tư 已失效 20/2020/QĐ-UBND Quyết định số 20/2020/QĐ-UBND Ban hành Quy định về việc triển khai Nghị quyết số 60/2019/NQ-HĐND ngày 11 tháng 12 năm 2019 của Hội đồng nhân dân tỉnh và một số chính sách của Trung ương về lĩnh vực lâm nghiệp trên địa bàn tỉnh Đắk Nông 已失效 60/2019/NQ-HĐND Nghị quyết số 60/2019/NQ-HĐND Ban hành Quy định về một số chính sách bảo vệ và phát triển rừng bền vững trên địa bàn tỉnh Đắk Nông 生效中 08/2019/QĐ-UBND Quyết định số 08/2019/QĐ-UBND Về việc quy định mức hỗ trợ khoán quản lý bảo vệ rừng và khoanh nuôi xúc tiến tái sinh rừng tự nhiên không trồng bổ sung trên địa bàn tỉnh Bình Dương 生效中 32/2018/QĐ-UBND Quyết định số 32/2018/QĐ-UBND Ban hành quy định về loài cây, mật độ, mô hình, cơ cấu cây trồng, mức đầu tư, hỗ trợ đầu tư thuộc chương trình, dự án phát triển lâm nghiệp sử dựng vốn ngân sách nhà nước; mức đầu tư trồng rừng thay thế khi chuyển mục đích sử dụng rừng và đất lâm nghiệp sang mục đích khác trên địa bàn tỉnh Hòa Bình 已失效
被其替代 1
02/2018/TT-BKHĐT
Circular No. 02/2018/TT-BKHĐT guiding the implementation of certain contents of Decision No. 38/2016/QĐ-TTg dated September 14, 2016 of the Prime Minister on issuing some policies for forest protection, development, and investment support for infrastructure and public service tasks for agricultural and forestry companies.
In effect
↓ 受本文件影响的文件

点击文件即可打开。红色边框=改变效力的关系。