Circular No. 11/2017/TT-BXD on the technical safety inspection procedures for slip formwork systems, independent concrete distribution booms, and drilling machines, pile driving and pile insertion machines used in construction works.

Circular No. 11/2017/TT-BXD stipulates the technical safety inspection procedures for slip formwork systems, independent concrete distribution booms, and drilling machines, pile driving and pile insertion machines used in construction works. This document aims to ensure labor safety during the construction process.

Số hiệu11/2017/TT-BXD
Loại văn bảnCircular
Cơ quan ban hànhMinistry of Construction
Người kýLê Quang Hùng — Thứ trưởng
Cập nhật17/06/2026
NgànhConstruction
Lĩnh vựcState Inspection of Construction Quality
Ngày ban hành16/10/2017
Ngày áp dụng01/12/2017
Ngày hết hiệu lực
Tình trạngIn effect
✦ Tóm lược thông minh

Circular No. 11/2017/TT-BXD stipulates the technical safety inspection procedures for slip formwork systems, independent concrete distribution booms, and drilling machines, pile driving and pile insertion machines used in construction works. This document aims to ensure labor safety during the construction process.

Đối tượng áp dụng

[State Construction Quality Inspection Agency; organizations conducting technical safety inspections; enterprises, agencies, organizations, individuals owning, managing, using machines and equipment]

Các điểm cốt lõi

  • The State Construction Quality Inspection Agency shall be responsible for implementing this Circular (Article 3.1).
  • Organizations conducting technical safety inspections must submit a copy of the Certificate of Inspection Results to the State Construction Quality Inspection Agency within fifteen days from the date of issuance (Article 3.2).
  • Enterprises and individuals owning, managing, and using machines and equipment according to the technical safety inspection procedures must comply with this Circular (Article 3.3).

🌐 Tác động xã hội từ văn bản này

  • Technical safety inspection organizations will have to follow the new procedures to ensure worker safety.
  • Enterprises and individuals owning construction machinery need to conduct inspections according to the new regulations to avoid legal violations.

❓ Câu hỏi thường gặp

When does this Circular take effect?

This Circular takes effect from December 1, 2017 (Article 2).

Which organizations must submit a copy of the Certificate of Inspection Results?

Organizations conducting technical safety inspections must submit a copy of the Certificate of Inspection Results to the State Construction Quality Inspection Agency within fifteen days from the date of issuance (Article 3.2).

Which organizations are responsible for implementing this Circular?

Technical safety inspection organizations and enterprises, agencies, organizations, individuals owning, managing, and using machines and equipment according to the technical safety inspection procedures are responsible for implementing this Circular (Article 3.3).

Toàn văn

MINISTRY OF CONSTRUCTION

SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness

Number: 11/2017/TT-BXD
Hanoi, October 16, 2017

CIRCULAR

Issuing technical safety inspection procedures for

formwork sliding systems; independent concrete distribution booms; drilling machines,

pile driving and pile insertion machines used in construction works

___________________________

Pursuant to the Labor Safety Law on June 25, 2016;

Pursuant to Decree No. 81/2017/NĐ-CP dated July 17, 2017 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Construction;

Pursuant to Decree No. 44/2016/NĐ-CP dated May 15, 2016 of the Government detailing certain provisions of the Labor Safety Law regarding technical safety inspection activities, labor safety training, and workplace environmental monitoring;

At the proposal of the Director of the National Appraisal Agency for Construction Quality,

The Minister of Construction issues this Circular on technical safety inspection procedures for formwork sliding systems; independent concrete distribution booms; drilling machines, pile driving and pile insertion machines used in construction works.

Article 1. Attached herewith are

1. Technical safety inspection procedure for formwork sliding systems, code QTKĐ: 04-2017/BXD.

2. Technical safety inspection procedure for independent concrete distribution booms, code QTKĐ: 05-2017/BXD.

3. Technical safety inspection procedure for drilling machines, pile driving and pile insertion machines used in construction works, code QTKĐ: 06-2017/BXD.

Article 2. Effective Date

This Circular takes effect from December 1, 2017.

Article 3. Implementation Organization

1. The National Construction Quality Inspection Agency shall be responsible for implementing this Circular; compiling and reporting to the Ministry of Construction any suggestions for amending and supplementing each technical safety inspection procedure to align with the technological development level of machinery and equipment under the management of the Ministry of Construction that have strict requirements for labor safety.

2. Within fifteen days from the date of issuance of the Certificate of Inspection Results for machinery and equipment according to the technical safety inspection procedures stipulated in Article 1 of this Circular, organizations conducting technical safety inspection activities shall be responsible for sending copies of the Certificate of Inspection Results to the National Construction Quality Inspection Agency for compilation and monitoring.

3. Organizations conducting technical safety inspections, enterprises, agencies, organizations, and individuals owning, managing, and using machinery and equipment according to the technical safety inspection procedures stipulated in Article 1 shall be responsible for implementing this Circular. In case of difficulties during implementation, they are requested to report to the Ministry of Construction for research and resolution./.

DEPUTY MINISTER
DEPUTY MINISTER
(Signed)
Le Quang Hung

Văn bản gốc (PDF)

Mở PDF trong tab mới ↗