Circular No. 129/2016/TT-BTC amends Circular No. 136/2015/TT-BTC dated August 31, 2015 on the level of collection, payment, management, and use of road usage fees at the Co Chi Bridge toll station on National Highway 60, Tra Vinh Province.

Circular No. 129/2016/TT-BTC amends the schedule of road usage fee levels at the Co Chi Bridge toll station on National Highway 60, Tra Vinh Province. This document specifies the denominations and types of tickets (per trip, monthly, quarterly) for each type of vehicle.

Document No.129/2016/TT-BTC
Document typeCircular
Issuing authorityMinistry of Finance
Signed byVũ Thị Mai — Thứ trưởng
Updated17/06/2026
SectorFinance
FieldUncategorized
Issued date12/08/2016
Effective date20/08/2016
Expiry date01/01/2017
StatusExpired
✦ Smart summary

Circular No. 129/2016/TT-BTC amends the schedule of road usage fee levels at the Co Chi Bridge toll station on National Highway 60, Tra Vinh Province. This document specifies the denominations and types of tickets (per trip, monthly, quarterly) for each type of vehicle.

Scope of application

Citizens and businesses using the road through the Co Chi Bridge on National Highway 60, Tra Vinh Province

Key points

  • Vehicles with less than 12 seats and trucks with a load capacity under 2 tons: Ticket denomination is 35,000 VND/ticket; monthly ticket 1,050,000 VND; quarterly ticket 2,835,000 VND (Article 1)
  • Vehicles from 12 to 30 seats and trucks with a load capacity from 2 tons to under 4 tons: Ticket denomination is 50,000 VND/ticket; monthly ticket 1,500,000 VND; quarterly ticket 4,050,000 VND (Article 1)
  • Vehicles with 31 seats or more and trucks with a load capacity from 4 tons to under 10 tons: Ticket denomination is 75,000 VND/ticket; monthly ticket 2,250,000 VND; quarterly ticket 6,075,000 VND (Article 1)
  • Trucks with a load capacity from 10 tons to under 18 tons and container trucks 20 feet: Ticket denomination is 120,000 VND/ticket; monthly ticket 3,600,000 VND; quarterly ticket 9,720,000 VND (Article 1)
  • Trucks with a load capacity of 18 tons or more and container trucks 40 feet: Ticket denomination is 180,000 VND/ticket; monthly ticket 5,400,000 VND; quarterly ticket 14,580,000 VND (Article 1)

🌐 Social impact of this document

  • To improve the management and collection of road usage fees more effectively
  • To facilitate citizens and businesses when passing through the Co Chi Bridge on National Highway 60
  • It may cause financial difficulties for vehicle owners who have to pay high fees

❓ Frequently asked questions

What is the monthly ticket denomination for trucks with a load capacity from 2 tons to under 4 tons?

The monthly ticket for this type of vehicle is 1,500,000 VND (Article 1)

What is the road usage fee level for container trucks 20 feet?

The ticket denomination is 120,000 VND/ticket; monthly ticket 3,600,000 VND; quarterly ticket 9,720,000 VND (Article 1)

Is there a regulation regarding the weight of vehicles applying the ticket denomination?

The load capacity applied for each type of vehicle is based on the design load capacity, according to the Vehicle Registration Certificate (Article 1)

When does this circular take effect?

This circular takes effect from August 20, 2016 (Article 2)

Is there a regulation on the application of the fee level for container trucks?

Apply the fee level based on the total weight of the vehicle, regardless of whether it is carrying cargo or not (Article 1)

Full text

MINISTRY OF FINANCE
-------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
---------------

NUMBER: 129/2016/TT-BTC

HA NOI, August 12 02016

CIRCULAR

AMENDING THE GUIDELINE NO. 136/2015/TT-BTC dated August 31, 2015 of the MINISTER OF FINANCE REGULATING THE LEVEL OF COLLECTION, COLLECTION REGIME, PAYMENT, MANAGEMENT AND USE OF FEES FOR THE USE OF NATIONAL HIGHWAY 60 CỔ CHIÊN BRIDGE TOLL GATE IN TRÀ VINH PROVINCE

Pursuant to the Ordinance on fees and charges"b) In addition to the lists of public services issued according to the provisions of Clause 2, Article 4 of this Decree, specialized agencies under provincial People's Committees shall report to the provincial People's Committee for decision-making on amending, supplementing, or issuing the list of public services funded by the state budget within their jurisdiction and consistent with the local budget capacity within the approved budget by the Provincial People's Assembly, and send it to the Ministry of Finance and relevant ministries and sectors for supervision during implementation." and its guiding regulations construction costs; "7. A flexible power plant is a thermal power plant using reciprocating internal combustion engines (RICE) or aeroderivative gas turbines (Aero-GT) with fast start-up capabilities, designed in modular form to generate electricity for balancing capacity and maintaining power system stability."No. 38/2001/PL-UBTVQH11 dated August 28, 2001;

Pursuant to Decree No. 57/2002/NĐ-CP dated June 3, 2002; Decree No. 24/2006/NĐ-CP dated March 6, 2006 of At the proposal of detailing andi implementing the ORDINANCE construction costs; and its guiding regulations construction costs;;

On the basis of Government Decree No. 215/2013/NĐ-CP dated December 23, 2013 of At the proposal of The Minister of Health issues this Circular to repeal certain regulatory legal documents issued by the Minister of Health.ythe Government Resolution No. 35/NQ-CP dated May 16, 2016 on supporting and developing enterprises until 2020; structure organizations under the Ministry Finance;

Implementing Pursuant to Resolution No. hereby issues this Circular amending Circular

At the proposal of the Director of the Department of Tax Policy,

Minister of Finance 136/2015/TT-BTC dated August 31, 2015 regulating the level of collection, collection regime, payment, management and useNo. of fees for the use of national highway 60 Cổ Chiên bridge toll gate, Trà Vinh provincepolicies bridge construction costs; fee construction costs; Cổ Chiên national highway 60, Trà Vinh province CThe schedule of fees for the use of national highway 60 Cổ Chiên bridge toll gate, Trà Vinh province issued together with Circular No. 136/2015/TT-BTC dated August 31, 2015 of the Minister of Finance regulating the level of collection, collection regime, payment, management and use of fees for the use of national highway 60 Cổ Chiên bridge toll gate, Trà Vinh province (Annex attached).

Article 1. Amend

This Circular takes effect from August 20, 2016.

Article 2. Implementation

1. In the course of implementation, if any difficulties arise, please promptly report to the Ministry of Finance for further study and supplementary guidance./.

2. Department of Finance, Tax Service


Place of Receipt:
- Central Party Office and Party Committees:
- Office of the General Secretary;
- National Assembly Office;
- President's Office;
- Supreme People's Procuracy;
- Supreme People's Court;
- Department of Legal Document Inspection and Administrative Violation Management, Ministry of Justice;
- Ministries, agencies equivalent to ministries, government agencies;
- Central bodies of mass organizations;
- Ministry of Finance Electronic Portal;
- Government Portal;
- of the National Assembly; - Department of Finance, Taxation Department of Thua Thien Hue Province;
- of Trà Vinh;无效Investment Joint Stock Company
- Legal Department's Office of Legal Review (Ministry of Justice);
- Cổ Chiên; CTo be filed: VT, Revenue Policy Department (Room 5)
- Government Electronic Portal;
- Ministry of Finance Portal;
- SCHEDULE OF FEES FOR THE USE OF NATIONAL HIGHWAY 60 CỔ CHIÊN BRIDGE TOLL GATE IN TRÀ VINH PROVINCE.

DEPUTY MINISTER
DEPUTY MINISTER




Vu Thi Mai

Circular No. 129/2016

year 20...) /TT-BTC dated August 12, 2016 of the Ministry of Finance)over 12 seats; trucks with a load

Item number

(VND/TICKET)

Face value ONE-TIME TICKET

MONTHLY TICKET

QUARTERLY TICKET

Passenger vehicles with less than 12 seats, trucks with a load capacity of less than 2 tons; public transport buses

1

Passenger vehicles with 12 to 30 seats; trucks with a load capacity of 2 to less than 4 tons

35.000

1.050.000

2.835.000

2

Passenger vehicles with 31 seats or more; trucks with a load capacity of 4 to less than 10 tons

50.000

1.500.000

4.050.000

3

Trucks with a carrying capacity of 18 tons or more and 40-foot container vehiclespolicies energycapacity from 4 tons to less than 10 tons trTrucks with a load capacity from 10 tons to less than 18 tons; container trucks 20 feet

75.000

2.250.000

6.075.000

4

Trucks with a load capacity of 18 tons or more; container trucks 40 feet

120.000

3.600.000

9.720.000

5

The load capacity of each type of vehicle applying the above rates is the design load capacity (payload)

180.000

5.400.000

14.580.000

Note.:

- For the application of fee levels for container trucks (including dedicated tractor-trailers): Apply the fee level based on the total weight of the vehicle, regardless of whether it is loaded or not loaded)./ issued2. Regarding the application of the fee level for container transport vehicles (including dedicated tractor-trailers): Apply the fee level based on the total weight of the vehicle, regardless of whether it is loaded or not loaded./.

- For the application of fee levels for container cargo-carrying vehicles (including specialized tractor-trailers): Apply the fee level based on the total weight of the vehicle, without distinction as to whether it is carrying cargo or not./.

Original document (PDF)

Open PDF in a new tab ↗

Relations map

129/2016/TT-BTC
Circular No. 129/2016/TT-BTC amends Circular No. 136/2015/TT-BTC dated August 31, 2015 on the level of collection, payment, management, and use of road usage fees at the Co Chi Bridge toll station on National Highway 60, Tra Vinh Province.
Expired

Click a document to open. A red border = a relation that changes validity.