Decree No. 32/2016/ND-CP on the management of aviation obstacle height and control zones for airspace protection in Vietnam.

Decree No. 32/2016/ND-CP stipulates the management of aviation obstacle height and control zones for airspace protection in Vietnam. It applies to both domestic and international organizations/persons related to the management of aviation obstacle height and control zones for airspace protection. Notable points include regulations on construction height management, approval of construction height, and responsibilities of agencies, organizations, and individuals in managing and implementing these regulations.

Số hiệu32/2016/NĐ-CP
Loại văn bảnDecree
Cơ quan ban hànhMinistry of National Defense
Người kýNguyễn Xuân Phúc — Thủ tướng
Cập nhật24/06/2026
NgànhNational Defense
Lĩnh vựcAirspace Management
Ngày ban hành06/05/2016
Ngày áp dụng26/06/2016
Ngày hết hiệu lực
Tình trạngIn effect
✦ Tóm lược thông minh

Decree No. 32/2016/ND-CP stipulates the management of aviation obstacle height and control zones for airspace protection in Vietnam. It applies to both domestic and international organizations/persons related to the management of aviation obstacle height and control zones for airspace protection. Notable points include regulations on construction height management, approval of construction height, and responsibilities of agencies, organizations, and individuals in managing and implementing these regulations.

Đối tượng áp dụng

Agencies, organizations, and individuals in Vietnam and foreign organizations and individuals related to the management of aviation obstacle height and control zones for airspace protection in Vietnam.

Các điểm cốt lõi

  • Agencies, organizations, and individuals must comply with regulations on construction height management (Article 9).
  • Approve and approve construction height according to regulations (Articles 10, 11).
  • The Ministry of National Defense is responsible for coordinating with other Ministries to uniformly manage aviation obstacles (Articles 12-14).
  • Provincial People's Committees are responsible for planning and managing surface limits of obstacles (Article 15).
  • Project investors and owners of constructions must comply with approved construction height regulations (Article 16).

🌐 Tác động xã hội từ văn bản này

  • Promote economic and social development and efficient urban space utilization while strictly managing construction height to ensure flight safety.
  • Reduce the risk of collision with aviation obstacles, enhance national defense security.

❓ Câu hỏi thường gặp

Which constructions require approval of construction height?

Constructions exceeding the planned obstacle surface limits of airports and those within the airport vicinity with a height of 45 meters or more above the airport elevation (Article 9).

How long does it take to review and approve construction height?

Within 15 to 45 working days, depending on the scale of the project (Article 11).

Which agency has the authority to approve construction height?

The Operations Department of the General Staff of the Vietnam People's Army (Articles 10, 11).

What penalties will be imposed for violations of aviation obstacle height management regulations?

State agencies with jurisdiction will handle according to the law (Article 18).

How does this decree apply to foreign organizations/persons?

This decree also applies to foreign organizations and persons related to the management of aviation obstacle height and control zones for airspace protection in Vietnam (Article 2).

Toàn văn

THE GOVERNMENT
______
SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness
________________________
Number: 32/2016/NĐ-CP
Hanoi, May 6, 2016

DECREE

Regulations on the management of aviation obstacle heights

and air traffic control zones, airspace protection areas in Vietnam

___________

||| Pursuant to the Law on Organization of the Government dated June 19, 2015;

Based on the Law on National Defense dated June 14, 2005;

Pursuant to the Civil Aviation Law of Vietnam dated June 29, 2006;

Pursuant to the Law Amending and Supplementing Certain Articles of the Civil Aviation Law of Vietnam dated November 21, 2014;

Pursuant to the Ordinance on Protection of National Defense Works and Military Areas dated May 19, 1994;

At the proposal of the Minister of National Defense,

The Government promulgates this Decree stipulating the management of aviation obstacle heights for military airports, civil airports, joint-use airports, special-purpose airports, ground and water landing zones, artificial structures, air traffic control zones, airspace protection areas, and aviation radio stations; aviation obstacles warnings; planning construction of military airports, civil airports, joint-use airports, air traffic control zones, airspace protection areas, and aviation radio stations; height of structures; responsibilities of agencies, organizations, and individuals in managing aviation obstacle heights, air traffic control zones, and airspace protection areas in Vietnam.

PART I

GENERAL PROVISIONS

Article 1. Scope of Regulation

This Decree applies to agencies, organizations, and individuals in Vietnam and foreign organizations and individuals related to the management of aviation obstacle heights, air traffic control zones, airspace protection areas, and aviation radio stations in Vietnam.

Article 2. Applicability

1. Aviation obstacles are natural or artificial objects (fixed or mobile) located on land, water, or artificial structures that may affect the safety of flight operations or the normal operation of air traffic control zones, airspace protection areas, and aviation radio stations.

Article 3. Explanation of Terms

In this Decree, the following terms are understood as follows:

2. Management of aviation obstacle heights involves implementing tasks such as approving the height of structures, inspecting, supervising, relocating objects, announcing, and informing the height of aviation obstacles to relevant agencies, organizations, and individuals to ensure safety for all flight activities, the normal operation of air traffic control zones, airspace protection areas, and aviation radio stations in Vietnam.

3. An airport is a defined area constructed to ensure aircraft takeoff, landing, and movement, including:

a) Operational airports;

b) Planned airports within the national airport system;

c) Landing zones designated for helicopter takeoff and landing;

d) Airport roads, dual-use roads defined for aircraft takeoff and landing when necessary;

đ) Water landing strips, areas of sea, river, lake surfaces designated for seaplane takeoff and landing.

4. According to their purpose, airports are classified as follows:

a) Civil airports serve civil purposes;

b) Military airports serve military purposes;

c) Joint-use airports serve both military and civil purposes;

d) Special-purpose airports serve only general aviation purposes or passenger, baggage, cargo, mail transportation without public transport.

5. Air traffic control and airspace protection zones are areas defined for the purpose of managing, detecting, monitoring flight activities, and protecting airspace.

6. Runway is a defined area within an airport or water landing strip for aircraft takeoff and landing.

7. Runway threshold is the starting point of the runway portion used for aircraft landing.

8. Hazard warning lights are lights used to warn aircraft of dangers during air operations.

9. Runway end safety area is an extended area of the runway aimed at reducing the risk of loss of safety for aircraft during takeoff and landing.

10. Side safety area is a part of the flight path along the sides of the runway aimed at reducing the risk of loss of safety for aircraft during takeoff and landing.

11. Airport elevation is the highest point on the runway above mean sea level.

12. Airport reference point, ground landing zone, artificial structure, water landing strip reference point is a geographic location marked by coordinates VN-2000 or WGS-84.

13. Airport airspace is an aerial area with horizontal and vertical limits suitable for each airport, serving aircraft takeoff, landing, and holding patterns over the airport.

14. Adjacent complex terrain of the airport is an area with complex terrain or affected by restricted flight zones where circling or takeoff and landing maneuvers cannot be established.

15. Fragile object is a small object designed to break, bend, or deform easily to minimize danger to aircraft upon impact.

16. Shadowing is the study of existing terrain, objects, artificial structures to calculate the appropriate height of new artificial structures. Shadowing applications must ensure flight safety, and the height of new structures must lie below the sloping surface limit at 10% from the top of existing objects.

17. Obstacle surface is the maximum height limit of objects ensuring safety for aircraft during takeoff, climb, cruise, turn, descent, and landing phases; ensuring normal operation for air traffic control zones, airspace protection areas, and aviation radio stations.

18. Ground and water flight paths are rectangular areas with dimensions specified in Appendix I and Appendix II accompanying this Decree.

19. Aviation obstacle warnings involve marking, painting signs, installing hazard warning lights, placing signs, or planting flags on obstacles so that pilots and crews can see the warnings from a safe distance in all directions while flying.

20. Airport clear zone is the surrounding airspace around the airport where no obstacles affecting the safety of aircraft takeoff and landing are allowed. The airport clear zone has obstacle surfaces appropriate to the airport category.

20. Airport clear zone is the surrounding airspace around the airport where no obstacles that affect the safety of aircraft takeoff and landing are permitted. The airport clear zone has obstacle limitation surfaces appropriate to the airport's classification.

21. The airspace management and protection area, and the radio communication stations and sites shall be within the spatial range (the surface limit of obstacles) determined in accordance with the location and functions of the equipment to ensure that there are no obstacles causing safety hazards and affecting the shooting, launching, receiving, and transmitting of radio waves from the airspace management sites and the radio communication stations and sites.

22. Special flight zones are the airspace above the national administrative centers of provinces and centrally administered cities established for parade and review flights.

Article 4. General provisions on planning construction, managing the airspace clearance of military airports, civil airports, shared-use airports, dedicated airports, ground and water landing areas, artificial structures, airspace management sites, and radio communication stations and sites.

1. Planning for the construction of military airports, civil airports, shared-use airports, dedicated airports, landing areas, runways, water landing strips, artificial structures, and airspace management sites must comply with the national defense strategy and the provisions of Articles 5, 6, and 7 of this Decree, while also meeting the needs for economic and social development of the country.

2. The construction areas for military airports, civil airports, shared-use airports, dedicated airports, ground and water landing areas, artificial structures, airspace management sites, and radio communication stations and sites must comply with the laws on land, defense facility protection, military zones, and the height obstacle regulations for aviation stipulated in this Decree.

3. Approval authority for planning

a) The Prime Minister approves the overall development plan.

b) The Minister of National Defense approves the planning for the system of dedicated airports, ground and water landing areas, artificial structures, and the planning for airspace management sites. The General Staff of the Vietnam People's Army issues the basic airspace clearance surfaces for military airports, civil airports, shared-use airports, and special flight zones to serve as a basis for provincial People's Committees, agencies, and units when planning urban space, high-rise residential areas, and industrial infrastructure to ensure compliance with construction height regulations under the law;

c) The Minister of Transport approves detailed planning for national air cargo ports, airports, excluding dedicated airports; approves the planning for the system of radio communication stations and sites.

Chapter II

HEIGHT OF OBSTACLES FOR AVIATION AND AIRSPACE MANAGEMENT SITES

Section 1

LIMITING SURFACES OF OBSTACLES AND OBSTRUCTION LIGHTS FOR AVIATION

Article 5. Limiting surfaces of obstacles

1. Airports must determine the limiting surfaces of obstacles according to flight paths and airport levels. The dimensions of the limiting surfaces of obstacles for airports are specified in Appendix I and Appendix II attached to this Decree.

2. The limiting surfaces of obstacles for airspace management sites are specified in Appendix III attached to this Decree.

3. The minimum distance to ensure technical safety of radio communication stations and sites in Vietnam from obstacles is specified in Appendix V attached to this Decree.

Article 6. Flight Path Zone

All land and water airports must determine flight path zones with dimensions specified in Appendix I and Appendix II issued together with this Decree. The General Staff of the Vietnam People's Army shall specify the dimensions of the flight path zone for each airport.

Article 7. Obstacles Must Be Marked for Aviation

1. The following obstacles must be marked for aviation:

a) Those exceeding the height above the obstacle surface limits of the airport;

b) Located within the vicinity airspace of the airport, at a height of 45 meters or more above the airport elevation;

c) Located outside the vicinity airspace, at a height of 45 meters or more above natural ground level;

d) Those specified in Appendix IV issued together with this Decree.

2. Exemptions from marking for aviation shall be considered and decided by the Operations Department of the General Staff of the Vietnam People's Army and stated in the approval document for construction project heights.

Section 2

MANAGEMENT OF CONSTRUCTION HEIGHT

Article 8. General Provisions on Management of Construction Height

1. Ministries, sectors, and provincial People's Committees directly under the Central Government (hereinafter referred to as provincial People's Committees) before approving general planning schemes or detailed planning schemes for urban areas, high-rise residential areas, industrial infrastructure areas, economic zones, special zones, and high-tech zones must obtain opinions from the General Staff of the Vietnam People's Army to unify the management surface of construction height. The opinion document of the General Staff of the Vietnam People's Army shall be implemented according to the procedures and formalities prescribed in Articles 10 and 11 of this Decree.

2. Local authorities responsible for issuing construction permits must comply strictly with the regulations on construction height already approved by competent state agencies as stipulated in Point b Clause 3 Article 4 and Article 11 of this Decree.

Article 9. Projects and Construction Works Requiring Approval for Management of Construction Height

1. Construction works exceeding the height above the airport obstacle surface planning and those located within the vicinity of the airport at a height of 45 meters or more above the airport elevation.

2. Construction works exceeding the height above the published aviation obstacle surface area or at a height of 45 meters or more above natural ground level, located outside the planned urban areas and spaces that have been unified with the General Staff of the Vietnam People's Army regarding height as stipulated in Point b Clause 3 Article 4 and Article 8 of this Decree.

3. Lighting tower systems in the clear zone at the front of airports; high-voltage power transmission lines, cableways, radio wave receiving and transmitting stations, and wind power generation facilities; construction works within the impact range and adjacent to areas arranged for air space management and protection sites and radio communication stations.

Article 10. Procedures for Requesting Approval of Construction Height

1. Documents for requesting approval of construction height:

a) A request for approval of construction height carried out according to Form No. 01-ĐNCTĐC (for organizations) and Form No. 02-ĐNCTĐC (for individuals) in Appendix VI issued together with this Decree;

b) A copy of the map or spatial diagram of the construction site area with the location of the construction marked;

c) A copy of one of the documents proving ownership, management, and use of the construction work or residence in accordance with the law.

2. The construction permit issuing authority or the project investor, owner of the construction work shall prepare one set of documents in accordance with Clause 1 of this Article and send it through the postal system to the Operations Department of the General Staff of the Vietnam People's Army.

3. Address for receiving applications for approval of construction height from organizations, individuals, and investors:

a) Receiving agency: Operations Department of the General Staff of the Vietnam People's Army;

b) Address and mail box: No. 1 Nguyen Tri Phuong Street, Ba Dinh District, Hanoi City;

c) Contact number: 069 696 172; 069 696 108; fax: 04.37337994.

Article 11. Resolution of Requests for Approval of Construction Heights

1. From the date of receiving complete and valid files, the Operations Directorate of the General Staff Department of the Vietnam People's Army shall be responsible for inspecting, evaluating, and issuing a document approving or not approving the construction height to the agency, organization, or individual requesting approval, while simultaneously notifying the local construction permit authority, Vietnam Civil Aviation Authority, Vietnam Air Traffic Management Corporation, Regional Civil Aviation Authority, and related agencies and units within the following timeframes:

a) Fifteen (15) working days for residential building projects, urban areas, high-rise housing areas, industrial infrastructure technical zones, lighting pole systems in the airspace clearance areas at the front of airports, and constructions specified in Clause 1 and Clause 2 of Article 9.

b) Twenty (20) working days for economic zone construction projects, special zones, and high-tech industrial parks.

c) Thirty (30) working days for cable car projects, high-voltage power transmission lines under 100 kilometers in length, and wireless transmission station systems with between ten (10) and fifty (50) stations.

d) Forty-five (45) working days for high-voltage power transmission lines over 100 kilometers in length, and wireless transmission station systems with more than fifty (50) stations.

2. In cases where the submitted files are not valid, within ten (10) working days from the date of receipt, the Operations Directorate of the General Staff Department of the Vietnam People's Army shall issue a document informing the agency, organization, or individual requesting approval to supplement and complete the files according to regulations.

3. In cases where construction height approval is not granted, within ten (10) days, the Operations Directorate of the General Staff Department shall issue a document informing the agency, organization, or individual requesting approval of the reasons for non-approval.

4. The construction height approval document shall contain the following basic contents:

a) Name, nature, scale of the construction project;

b) Project investor, owner of the construction project;

c) Location of the construction project: Administrative address, geographic coordinates according to the WGS-84 coordinate system (longitude, latitude in degrees, minutes, seconds), and VN 2000 if the construction project is outside the airport vicinity;

d) Maximum allowable construction height relative to natural ground level or mean sea level;

đ) Aviation warning instructions;

e) Validity period of the construction height approval document;

g) Other Notes (if any).

Chapter III

RESPONSIBILITIES OF AGENCIES, ORGANIZATIONS, AND INDIVIDUALS IN THE MANAGEMENT OF AIRCRAFT OBSTRUCTION HEIGHTS AND CONTROL AREAS

Article 12. Responsibilities of the Ministry of National Defense

1. To take the lead and coordinate with the Ministry of Construction, the Ministry of Transport, relevant ministries, sectors, and provincial people's committees to unify the management of aircraft obstruction heights for military airports, civilian airports, shared-use airports, specialized airports, land and water runways, artificial structures, and control areas protecting airspace in Vietnam.

Based on the nature of activities at military airports, civilian airports, shared-use airports, specialized airports, land and water runways, artificial structures, and control areas protecting airspace, actual terrain conditions, shadowing principles, urban space development needs, and standards stipulated in Appendices I, II, III, IV, and V issued together with this Decree, establish aircraft obstruction surface limits according to safety and efficiency principles, organize the management and approval of construction heights, facilitate economic and social development, and effectively utilize national spatial resources.

2. To take the lead and coordinate with the Ministry of Transport and relevant provincial people's committees to develop comprehensive plans for the development of the military airport system for approval by the Prime Minister; to take the lead in organizing the approval of plans for specialized airport systems and control areas protecting airspace in Vietnam.

3. On the basis of defense tasks, comprehensive plans for the development of the national airport system, and approved plans for airports and control area systems, the Ministry of National Defense shall unify with relevant ministries, sectors, and localities regarding the planning of aircraft obstruction surface management limits and construction heights for master plans, detailed construction plans for industrial zones, cities, residential areas, and other elevations.

4. To notify provincial people's committees and relevant ministries and sectors about necessary contents to ensure the maintenance of plans for the development of military airports, civilian airports, shared-use airports, and control area protection plans that have been approved by competent authorities; aircraft obstruction surface limits for military airports, and construction height limit areas to ensure the secrecy of military facilities and air defense operations.

5. To coordinate with relevant ministries, sectors, and local governments to manage, prevent, and handle the relocation or lowering of construction heights violating aircraft obstruction surface limits affecting flight activities and control areas protecting airspace; to publicize and disseminate information to agencies, mass organizations, and communities near airports, adjacent areas, and control areas protecting airspace to participate in maintaining and managing aircraft obstruction surface limits, ensuring safety for flight activities, control areas protecting airspace, and residential areas.

6. To direct subordinate functional units of the Ministry of National Defense and provincial military command departments directly under the central government to cooperate with functional agencies of the Ministry of Transport and provincial people's committees in managing aircraft obstructions; to inspect, investigate, and resolve complaints and reports related to compliance with height regulations, aviation warnings, and related regulations for approved construction projects; to organize measurements of obstacles in airport areas and adjacent airspace affecting flight activities.

7. Direct, guide the work of managing the surface of obstacles for aviation and the management and protection airspace areas for the Military Regions, Military Services, Commanders of military and civilian airports, shared-use airports, Commanders of airspace management and protection sites, and Commanders of Provincial Military Commands under the direct jurisdiction of the Central Government.

Article 13. Responsibilities of the Ministry of Construction

1. Take the lead, coordinate with the Ministry of National Defense and provincial People's Committees to uniformly manage architectural space, urban landscape, construction planning to ensure the safe operation of airports and airspace management and protection sites in Vietnam.

2. Guide provincial People's Committees to establish general planning projects for building urban areas, high-rise residential zones, industrial infrastructure zones, economic zones, special zones, high-tech zones after receiving unified documents from the General Staff of the Vietnam People's Army to serve as the basis for issuing construction permits.

1. Take the lead, coordinate with the Ministry of National Defense and provincial People's Committees to uniformly manage architectural space, urban landscape, construction planning to ensure the safe operation of airports and airspace management and protection sites in Vietnam.

Article 14. Responsibilities of the Ministry of Transport

1. Take the lead, coordinate with the Ministry of National Defense and relevant provincial People's Committees to develop a comprehensive plan for the national civil airport system for submission to the Prime Minister for approval, excluding military airports and dedicated-use airports.

2. Take the lead, coordinate with the Ministry of National Defense to publicly announce aviation obstacle surfaces, heights of structures related to aviation obstacle surfaces within the area of civilian air operations; areas ensuring normal operation of aviation radio stations; obstacle surfaces in adjacent areas of civil airports; compile, mark, and publish a list of natural and artificial obstacles that may affect flight safety.

3. Coordinate with the Ministry of National Defense, relevant ministries, sectors, and provincial People's Committees to manage aviation obstacle surfaces, prevent and handle structures violating aviation obstacle surfaces affecting civil flight activities; disseminate and promote to agencies, organizations, and local communities near airports to participate in maintaining and managing aviation obstacle surfaces, ensuring safety for all flight activities.

4. Organize surveys, draw obstacle diagrams and maps in areas of civil air operations; update and publish information on obstacles and direct competent authorities of the Ministry of Transport to cooperate with functional agencies of the Ministry of National Defense and People's Committees at all levels in managing aviation obstacle surfaces.

5. Direct the Civil Aviation Administration of Vietnam to coordinate with relevant agencies and units to implement management of aviation obstacle surfaces at civil airports and aviation radio stations.

2. Take the lead, coordinate with the Ministry of National Defense to publicly announce aviation obstacle surfaces, heights of structures related to aviation obstacle surfaces within the area of civilian air operations; areas ensuring normal operation of aviation radio stations; obstacle surfaces in adjacent areas of civil airports; compile, mark, and publish a list of natural and artificial obstacles that may affect flight safety.

Article 15. Responsibilities of the Provincial People's Committee

1. Coordinate with the Ministry of National Defense, the Ministry of Construction, and the Ministry of Transport to develop a comprehensive plan for the development of military and civil airport systems, shared-use airports, airspace management and protection sites, and aviation radio stations; manage aviation obstacle surfaces. Issue construction permits for structures below specified heights according to planning projects or approval documents from functional agencies of the Ministry of National Defense as stipulated in Point b Clause 3 Article 4, Articles 8, 9, 10, and 11 of this Decree.

2. Take the lead, coordinate with the Ministry of National Defense, the Ministry of Construction, the Ministry of Transport, and relevant agencies to organize relocation or lowering of heights, handle according to legal provisions for structures violating aviation obstacle surfaces affecting flight safety of airports and airspace management and protection sites; inspect and handle the height of structures and installation of aviation warning systems as prescribed.

3. Take the lead, coordinate with relevant ministries, sectors, and provincial Military Commands to organize spatial planning and utilization management; review, adjust, and supplement socio-economic development plans and sectoral plans of localities in conjunction with comprehensive plans for the development of military and civil airport systems, shared-use airports, and airspace management and protection sites.

4. Take the lead, coordinate with relevant ministries, sectors to disseminate and promote to local agencies, organizations, and individuals regarding the maintenance and management of aviation obstacle surfaces to ensure safety for airspace management and protection sites and flight activities of airports.

Article 16. Responsibilities of project investors and owners of works

1. Implement procedures for requesting approval of the height of the work as prescribed in Articles 9, 10, and 11 of this Decree; bear responsibility for the accuracy of information as prescribed in Article 10 of this Decree.

2. Adhere to regulations on permitted building heights and be responsible for investment in installation and maintenance of normal operation of the aviation warning system for the work.

3. Be subject to inspection and supervision by competent authorities regarding implementation of permits and contents stipulated in the construction permit, approvals for static clearance heights, and installation of the aviation warning system.

Chapter IV

IMPLEMENTING PROVISIONS

Article 17. Funding Assurance

Funding for planning, establishment, publication, management of the surface of obstacles affecting aviation, control zones, airspace protection areas, and aviation radio stations and transmitters shall be guaranteed from the state budget according to the current budget classification. Budget estimates, management, and settlement of accounts shall be carried out in accordance with the State Budget Law and detailed regulations and guidance on its implementation.

Article 18. Transitional Provisions

For constructions commenced before the effective date of this Decree, if there has been no approval of height from the competent state authority and it violates the management of obstacle heights affecting aviation, it shall be handled as follows:

1. The Operations Department shall take the lead and coordinate with the Civil Aviation Authority of Vietnam to examine flight operation methods and conditions ensuring operations of control zones, airspace protection areas, and aviation radio stations and transmitters. If safety is ensured, procedures for approving the height of the construction shall be processed.

2. In cases where the management of obstacle heights affecting aviation does not meet the regulations, the competent state authority shall handle it in accordance with the law.

Article 19. Effective Date

1. This Decree takes effect from June 26, 2016.

2. Decree No. 20/2009/NĐ-CP dated February 23, 2009 of the Government on the management of obstacle heights affecting aviation and control zones, airspace protection areas in Vietnam shall cease to be effective from the date this Decree takes effect.

Article 20. Implementation

1. The Minister of National Defense is responsible for organizing the implementation of this Decree.

2. Ministers, Heads of ministerial-level agencies, Heads of government-affiliated agencies, Chairpersons of provincial and centrally-administered city People's Committees, and relevant agencies, organizations, individuals in Vietnam and foreign organizations and individuals shall be responsible for implementing this Decree./. 

PRIME MINISTER
PRIME MINISTER
(Signed)
Nguyen Xuan Phuc

Văn bản gốc (PDF)

Mở PDF trong tab mới ↗

Bản đồ quan hệ

↑ Cơ sở & văn bản tác động lên văn bản này
Được dẫn chiếu bởi 11
29/2021/TT-BGTVT Thông tư số 29/2021/TT-BGTVT Quy định chi tiết về quản lý, khai thác cảng hàng không, sân bay Còn hiệu lực 38/2021/QĐ-UBND Quyết định số 38/2021/QĐ-UBND Sửa đổi, bổ sung Phụ lục I ban hành kèm theo Quyết định số 22/2020/QĐ-UBND ngày 24 tháng 8 năm 2020 của Ủy ban nhân dân tỉnh về việc ban hành bảng giá tính thuế tài nguyên trên địa bàn tỉnh Nghệ An Hết hiệu lực 45/2018/QĐ-UBND Quyết định số 45/2018/QĐ-UBND Quy định giá tính lệ phí trước bạ đối với nhà trên địa bàn tỉnh An Giang Hết hiệu lực 07/2017/QĐ-UBND Quyết định số 07/2017/QĐ-UBND Ban hành Quy chế về tổ chức và hoạt động của Phòng Tài nguyên và Môi trường thuộc Ủy ban nhân dân huyện Bình Chánh Hết hiệu lực 43/2022/QĐ-UBND QUYẾT ĐỊNH SỐ 43/2022/QĐ-UBND BÃI BỎ QUYẾT ĐỊNH SỐ 2159/2008/QĐ-UBND NGÀY 24 THÁNG 12 NĂM 2008 CỦA ỦY BAN NHÂN DÂN TỈNH VỀ VIỆC BAN HÀNH QUY ĐỊNH MỘT SỐ ƯU ĐÃI VÀ HỖ TRỢ ĐẦU TƯ ÁP DỤNG TẠI CÁC KHU CÔNG NGHIỆP TRÊN ĐỊA BÀN TỈNH PHÚ YÊN Còn hiệu lực 11/2017/QĐ-UBND Quyết định số 11/2017/QĐ-UBND Ban hành quy định về lập, thẩm định, phê duyệt và tổ chức thực hiện hồ sơ quy hoạch xây dựng trên địa bàn tỉnh Đồng Nai. Hết hiệu lực 45/2018/QĐ-UBND Quyết định số 45/2018/QĐ-UBND Ban hành quy định chi tiết một số nội dung về cấp giấy phép xây dựng trên địa bàn thành phố Đà Nẵng Hết hiệu lực 11/2017/QĐ-UBND Quyết định số 11/2017/QĐ-UBND Ban hành Quy chế phối hợp thực hiện cơ chế một cửa liên thông trong thẩm định thiết kế cơ sở, thiết kế kỹ thuật (thiết kế bản vẽ thi công) và cấp phép xây dựng đối với các dự án sử dụng nguồn vốn khác được đầu tư xây dựng trên địa bàn tỉnh Hưng Yên Hết hiệu lực 07/2017/QĐ-UBND Quyết định số 07/2017/QĐ-UBND Ban hành "Quy định về quản lý, cấp phép xây dựng công trình cột ăng ten thu, phát sóng thông tin di động trên địa bàn thành phố Hà Nội". Hết hiệu lực 43/2022/QĐ-UBND Quyết định số 43/2022/QĐ-UBND ban hành Quy định về trình tự, trách nhiệm phối hợp giải quyết thủ tục đầu tư và quản lý dự án đầu tư có sử dụng đất trên địa bàn tỉnh Đắk Lắk Hết hiệu lực 38/2021/QĐ-UBND Quyết định số 38/2021/QĐ-UBND Ban hành Quy định chi tiết một số nội dung về cấp giấy phép xây dựng trên địa bàn thành phố Đà Nẵng Hết hiệu lực
Căn cứ 9
76/2015/QH13 Luật Tổ chức Chính phủ số 76/2015/QH13 Hết hiệu lực 66/2006/QH11 Luật Hàng không dân dụng Việt Nam số 66/2006/QH11 Còn hiệu lực 39/2005/QH11 Luật Quốc phòng số 39/2005/QH11 Hết hiệu lực 61/2014/QH13 Luật Sửa đổi, bổ sung một số điều của Luật Hàng không dân dụng Việt Nam số 61/2014/QH13 Còn hiệu lực 14/2023/QD-UBND Quyết định số 14/2023/QD-UBND Ban hành Quy định về quản lý cột ăng ten trên địa bàn thành phố Hà Nội Còn hiệu lực 18/2020/QĐ-TTg Quyết định số 18/2020/QĐ-TTg Thiết lập khu vực cấm bay, khu vực hạn chế bay đối với tàu bay không người lái và các phương tiện bay siêu nhẹ Còn hiệu lực 65/2017/QĐ-UBND Quyết định số 65/2017/QĐ-UBND Ban hành Quy định về xây dựng, quản lý và sử dụng chung hạ tầng kỹ thuật viễn thông trên địa bàn tỉnh An Giang Còn hiệu lực 16/2021/NQ-HĐND Nghị quyết số 16/2021/NQ-HĐND Bãi bỏ Nghị quyết số 18/2006/NQ-HĐND ngày 12 tháng 7 năm 2006 của Hội đồng nhân dân tỉnh Gia Lai về việc bổ sung quy hoạch chung xây dựng thành phố Pleiku đến năm 2020 Còn hiệu lực 20/2024/NQ-HĐND Nghị quyết số 20/2024/NQ-HĐND Quy định các tiêu chí, lĩnh vực, nội dung hỗ trợ thử nghiệm có kiểm soát giải pháp công nghệ mới trong phạm vi Khu Công nghệ cao, Khu Công nghệ thông tin tập trung trên địa bàn Thành phố Hồ Chí Minh Còn hiệu lực
32/2016/NĐ-CP
Decree No. 32/2016/ND-CP on the management of aviation obstacle height and control zones for airspace protection in Vietnam.
In effect

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.