Decision No. 322-BXD/ĐT On the issuance of regulations for preparing urban planning projects

Decision No. 322-BXD/ĐT stipulates the preparation of urban planning projects, applicable nationwide. It provides detailed regulations on regional development plans, general and detailed planning projects, with requirements regarding content, scale of drawings, documentation, and approval.

Số hiệu322-BXD/ĐT
Loại văn bảnDecision
Cơ quan ban hànhMinistry of Construction
Người kýNgô Xuân Lộc — Bộ trưởng
Cập nhật02/07/2026
NgànhConstruction
Lĩnh vựcPlanning and Architecture
Ngày ban hành28/12/1993
Ngày áp dụng28/12/1993
Ngày hết hiệu lực15/10/2005
Tình trạngExpired
✦ Tóm lược thông minh

Decision No. 322-BXD/ĐT stipulates the preparation of urban planning projects, applicable nationwide. It provides detailed regulations on regional development plans, general and detailed planning projects, with requirements regarding content, scale of drawings, documentation, and approval.

Đối tượng áp dụng

Urban planning specialized organizations, state management agencies for construction, and project investors for urban construction

Các điểm cốt lõi

  • All cities must have urban renovation and construction planning projects; including regional development plans, general and detailed planning projects.
  • Regional development plans are prepared for various types of territories with drawing scales from 1/25,000 to 1/300,000.
  • General urban planning projects determine directions and tasks for renovating and developing spatial infrastructure over a period of 15-20 years.
  • Detailed urban planning projects specify the provisions of general planning projects, prepared for areas under 10 years with drawing scales from 1/200 to 1/5,000.
  • Planning projects must comply with national laws, standards, and procedures, approved by competent authorities.

🌐 Tác động xã hội từ văn bản này

  • Establish a legal basis for urban construction management, spatial renovation, and infrastructure development.
  • In line with the Party and State's socio-economic development strategy, protecting the natural environment.
  • Reduce the risk of land use conflicts during urbanization.

❓ Câu hỏi thường gặp

What does urban construction planning projects include?

Urban construction planning projects include regional development plans, general and detailed planning projects. The general planning project determines the direction of spatial development over 15-20 years, while the detailed planning project specifies the provisions of the general planning project for areas under 10 years.

What are the drawing scales?

Regional development plans have scales from 1/25,000 to 1/300,000, general urban planning projects have scales from 1/10,000 to 1/5,000, and detailed planning projects have scales from 1/200 to 1/5,000.

Who must approve planning projects?

Urban construction planning projects must be approved by competent authorities, typically state management agencies for construction and urban development.

What is the duration of general urban planning projects?

The duration of general urban planning projects is 15-20 years, including long-term development directions and initial construction planning phases of 5-10 years.

For which areas are detailed planning projects prepared?

Detailed planning projects are prepared for areas requiring renovation and construction within 10 years, with sizes ranging from 20 to 200 hectares.

Toàn văn

Pursuant to …;

Regarding the issuance of regulations for the preparation of urban construction master plans

______________________________

THE MINISTER OF CONSTRUCTION

Pursuant to Decree No. 15/CP dated March 2, 1993 of the Government on the tasks, powers, and responsibilities of state management of ministries and ministerial-level agencies;

Pursuant to Decree No. 59/HĐBT dated April 14, 1988 of the Council of Ministers on the functions, tasks, and organizational structure of the Ministry of Construction;

Pursuant to Decision No. 132/HĐBT dated May 5, 1990 on the classification of cities and urban management levels and Directive No. 19/CT dated January 22, 1991 of the Chairman of the Council of Ministers on rectifying urban management work;

At the proposal of the Heads of the Urban-Rural Department and the Director of the Urban-Rural Planning Institute;

Pursuant to …;

Article 1. Now hereby promulgates with this Decision the regulations on the preparation of urban construction master plans and guidelines for the main contents of urban construction master plans.

Article 2. These regulations apply in the field of urban planning design and urban construction management throughout the country. Previous regulations issued by the Ministry of Construction and provincial People's Committees that conflict with these regulations are abolished. The rural urban planning design fee issued pursuant to Decision No. 142-BXD/VKT of the Minister of Construction dated May 18, 1989 will continue to be applied until a new fee is issued.

Article 3. This Decision takes effect from the date of signature.

 

THE MINISTER OF CONSTRUCTION

(Signed)

 

Ngo Xuan Loc

REGULATIONS

ON THE PREPARATION OF URBAN CONSTRUCTION MASTER PLANS
(Issued together with Decision No. 322-BXD/ĐT dated December 28, 1993) of the Minister of Construction)

________________________________

I. GENERAL PROVISIONS

Article 1All cities (cities, towns, and townships) must have urban renovation and construction master plans.

Urban construction master plans include regional urban development schemes, general urban development plans for the entire urban territory, and detailed urban development plans for specific parts of the urban territory.

Article 2.Urban construction planning has the specific task of concretizing the Party and State's strategy for economic and social stability and development, the national urban development strategy, coordinating with specialized sectoral plans, ensuring that urbanization and urban development achieve high economic, social benefits, and environmental protection.

Article 3. Urban construction master plans must be prepared by organizations specializing in such work recognized by the State and must comply with laws, standards, regulations, and procedures established by the State. They must also be approved by competent authorities. Approved master plans serve as the legal basis for urban construction management, investment preparation activities, annual, short-term, and long-term urban renovation and construction plans for various sectors and localities.

Article 4

1. Approved urban construction planning projects must be publicly disseminated so that the people can know and implement them.

2. During implementation, urban construction master plans need to be adjusted:

- Adjustments to general urban development plans are carried out every five years.

- Supplementary adjustments to general urban development plans or detailed plans are conducted regularly when deemed necessary.

Any adjustment to urban construction master plans must be authorized by the approving authority.

II. SPECIFIC PROVISIONS

II.1. REGIONAL URBAN DEVELOPMENT SCHEMES:

Article 5Regional urban development schemes aim to establish the basis for preparing urban construction master plans for cities or industrial zones, rural residential areas, developing infrastructure, and protecting the environment within the region. Regional urban development schemes are prepared according to the Government's provisions over a period of 15-20 years, based on the overall socio-economic development plan of the country and each region, specialized sectoral plans, and relevant state laws and regulations.

Article 6. Regional urban development schemes are prepared for regions with comprehensive or specialized functions (industrial, urban, agricultural, tourism-recreation, natural conservation, forestry, etc.) and economic-administrative provinces, counties, and economic development areas. The tasks of regional urban development schemes are:

1. To comprehensively assess the current situation and development resources of the region.

2. To forecast the potential for economic growth, population, land, social needs, inter-regional relationships, urbanization processes, and environmental instability, forming balanced options between capabilities and requirements.

3. To establish regional development goals and perspectives.

4. To direct spatial organization (delineating functional zones), infrastructure, and environmental protection measures.

5. To select priority areas and objects for development, forming a list of key investment programs and projects, balancing capital investment requirements, and prioritizing them.

6. To recommend management mechanisms and policies for regional development.

, Clause 1, Clause 2 Article 7a of this Regulation.Regional urban development schemes are prepared on topographic maps at specified scales as follows:

1. Regions up to 30,000 km² use maps at scales of 1/25,000 + 1/100,000.

2. Regions larger than 30,000 km² use maps at scales of 1/100,000 - 1/300,000.

Article 8. The main components of the regional urban development scheme dossier include:

8.1. Drawings section:

1. Location diagram and inter-regional relations (scale selected according to the research area's size and its direct impact on the planned region).

2. Current status map and comprehensive land evaluation.

3. Regional development orientation diagram (spatial organization, environmental protection, and infrastructure).

4. Initial development planning diagram (spatial organization, environmental protection, and infrastructure including a list of investment projects prioritized).

5. Illustration diagram of development planning for priority investment areas (at appropriate scale).

The map scale specified in Article 7 applies only to diagrams 2, 3, and 4 when preparing the research dossier (color dossier) for review sessions. For the official dossier, all diagrams and maps specified in Article 8 are reduced to suitable scales (with scale notation) and included in the illustration section of the explanatory report.

8.2. Textual section:

1. Summary explanation, submission letter, and appendices.

Draft regulatory documents for urban construction based on the regional urban development scheme. After approval by the competent authority, the regional urban development planning dossier must be sent to relevant ministries, sectors, and provinces or centrally administered cities for implementation.

II.2. GENERAL URBAN DEVELOPMENT PLANS

Article 9. The general urban planning project determines the direction, tasks for renovating and constructing the city regarding spatial development, infrastructure, creating a suitable living environment while considering the balance and harmony between urban expansion and agricultural production, ensuring national defense security and other economic activities, as well as preserving historical relics and natural landscapes, taking into account the consequences of natural disasters and potential technological accidents.

Article 10. The general urban planning project is established for a single city or a system of closely related urban residential points in terms of territory, economy, society, services, and other aspects. The general urban planning project is presented through a development orientation diagram for 15 to 20 years and the initial construction planning for 5 to 10 years, focusing on addressing the following main tasks:

1. Comprehensive assessment of natural conditions, current status, and strengths or driving forces for urban development.

2. Argumentation to determine the nature, economic-technical foundation, population size, land area, and key economic-technical indicators for urban renovation and development.

3. Orientation for urban development (spatial, environmental protection, and infrastructure).

4. Initial construction planning for 5 to 10 years.

5. Establishing legal bases for urban construction management.

6. Forming foundations for detailed planning projects and investment projects.

Article 11The general urban planning project is established on topographic maps with scales as follows:

Table 1

Scale symbol

Content

Type of city according to Decision 132/CP

 

 

A

Diagram of regional relationship or regional urban planning diagram

1/25.000 - 1/300.000

 

 

B

Long-term development orientation

1/10.000-1/25.000

1/10.000

-1/5.000

C

Initial construction planning

1/10.000-1/5000

1.500

1/2.000

Original maps must ensure accuracy, clarity, and not exceed a five-year validity period from issuance.

In cases where the terrain, geomorphology, and current status have undergone significant changes, before use, the map must be supplemented with additional surveying and must include aerial photographs. Specifically, for cities of type I, when establishing the general urban planning project, it is necessary to use the latest aerial photographs, while for cities of types II and III in areas with such conditions, all available aerial photograph materials must be fully utilized to verify and accurately update the original maps.

Article 12.The main components of the general urban planning project's dossier include:

12.1. Drawing section

1. Regional relationship diagram (scale A)

2. Current status map and comprehensive evaluation of construction land (scale B)

3. Spatial development orientation diagram (scale B)

4. System infrastructure technical development orientation diagram (scale B)

5. Land use planning map for 5 to 10 years (scale C).

6. Infrastructure and environmental sanitation planning map (scale C)

7. Integrated technical lines and pipelines diagram (scale C)

8. Dossier of cross-sections and red-line boundaries of major streets.

9. Illustrative diagrams and tables.

Drawings 1 to 8 and illustrative diagrams and tables (9) are mandatory for research dossiers (color dossiers) to be used in reporting meetings for review.

When preparing the official dossier, all drawings from 1 to 6 and 9 must be reduced to appropriate scales, accompanied by scale bars to be included in the illustration or appendix of the explanatory report. Specifically, drawings 3, 4, 5, 6, 7, and 8 must be represented on maps according to the specified scale in Article 11 (ink dossiers) and must be stored on computers to ensure accuracy during exploitation and use.

12.2. Textual section

1. Petition letter, summary explanatory report

2. Comprehensive explanatory report, including the following main contents:

- Basis for establishing the general urban planning project.

- Detailed content of the project.

- Conclusions and recommendations.

- Appendix: agreements of reviewing agencies, reduced drawings, illustrative diagrams and tables.

3. Draft "Urban Construction Management Regulations According to Planning," accompanied by a zoning management map delineating special areas and specifying management and usage regulations for each area (including architectural planning criteria and key economic-technical indicators).

II.3. Detailed planning projects

Article 13. Detailed planning projects aim to concretize and refine the provisions of the general urban planning project and are established for areas requiring renovation and construction within the next 10 years. Detailed planning projects divide and specify the management and usage regimes for land areas or plots designated for public or private use, serving purposes of renovation, beautification, or construction of housing, service facilities, production and business facilities, green spaces, cultural and recreational parks; study and prepare technical groundwork for land areas, renovate and develop infrastructure networks; stipulate preservation, restoration, and development of architectural works and natural scenic areas of value, ensuring fire safety and urban environmental protection.

Approved detailed planning projects serve as a basis for directing the establishment of investment construction projects, implementing subsequent design and construction steps, and conducting procedures for issuing planning certificates, allocating land, and granting construction permits...

Article 14Tasks of detailed planning projects

1. To concretize and refine the provisions of the general urban planning project.

2. Assess the current construction status and the potential for using existing and planned development land.

3. Aggregate and balance investment renovation and construction requirements at the planned land area.

4. Develop land use plans, divide land areas or plots, and specify land management and usage regimes for different users.

5. Study and propose architectural orientations and urban landscape protection measures.

6. Study and propose solutions for renovating and constructing infrastructure systems.

7. Study phased investment renovation and construction.

8. Determine street red lines and building lines for streets.

9. Draft construction management regulations.

Article 15. Detailed planning projects include

1. Detailed land use planning project

Established at two levels as follows:

1.1. For areas of land with an area exceeding 200 hectares, apply maps at scales of 1/2000 to 1/5000 to detail and accurately specify the provisions of the general urban planning project regarding land management and usage; the renovation and construction of technical infrastructure projects, architectural orientation, and natural landscape protection for each area ranging from 4 to 20 hectares.

1.2. For areas of land between 20 and 200 hectares, apply maps at scales of 1/1000 to 1/2000 to detail and accurately specify the provisions of the general urban planning project and detailed land use planning projects related to it, while clearly defining objectives, land management regimes, requirements for planning layout - architecture, and infrastructure bases, economic and technical indicators, environmental sanitation... for each area designated for constructing clusters of projects or individual projects.

2. Detailed planning subdivision project:

Is established for areas of land with an area under 20 hectares on cadastral and topographic maps at scales of 1/200 to 1/500 to stipulate land management and usage regimes and requirements for the renovation or construction of projects within each plot.

The original maps used to establish detailed planning projects must ensure clarity and accuracy in reflecting updated content about terrain and the current status of the land.

Article 16. The main components of the detailed planning project file include:

16.1. Drawings Section

1. Location and boundary map of the area (extracted from the land use planning map of the general urban planning project or the detailed land use planning project if it is a subdivision planning project)

2. Map assessing the current status and construction land fund.

3. Map of the current technical infrastructure system.

4. Planning structure diagram (at least two options must be proposed for comparison and selection)

5. Land use planning map or subdivision planning map (for subdivision planning projects).

6. Diagram of spatial organization planning - architecture and landscape (floor plans and elevations).

7. Technical infrastructure system planning map (including detailed design drawings)

8. Integrated map of technical lines and pipelines

9. File of red line boundaries and construction boundaries.

Diagrams 1, 4, and 6 should be applied at appropriate scales depending on the characteristics of each project.

Maps 2, 3, 5, 7, 8, and 9 must be applied at the scale specified in Article 15 when preparing research files (color files) to report during review sessions.

When preparing formal files (ink files), drawings 5, 7, 8, and 9 should be presented on maps at the scale specified in Article 15 and stored on computers to ensure accuracy when utilized. The remaining drawings must be reduced to integrated scales with accompanying scale bars to be included in the illustrative section or appendices of the explanatory notes.

16.2. Textual Section

1. Petition, summary and comprehensive explanation, appendices, and agreements of reviewing or approving agencies.

2. Draft construction management regulations.

III. IMPLEMENTATION PROVISIONS

Article 17This regulation applies to the field of urban planning design and construction management throughout the country.

Chairmen of provincial people's committees directly under the central government, heads of the Ministry's Office, heads of departments and bureaus directly under the Ministry, chief architects of cities, directors of Construction Departments, Housing Departments, Transportation and Communications Departments of provinces and cities directly under the central government are responsible for implementing this regulation.

Article 18. This regulation takes effect from the date of issuance, all previous regulations of the Ministry of Construction and local People's Committees that conflict with this regulation are abolished.

Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Tải văn bản

Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Bản đồ quan hệ

322-BXD/ĐT
Decision No. 322-BXD/ĐT On the issuance of regulations for preparing urban planning projects
Expired
↓ Văn bản chịu tác động từ văn bản này
Liên quan 27
08/2004/QĐ-UB QUYẾT ĐỊNH SỐ 08/2004/QĐ-UB VỀ VIỆC THÀNH LẬP SỞ GIAO THÔNG - CÔNG CHÍNH THUỘC ỦY BAN NHÂN DÂN THÀNH PHỐ CẦN THƠ Hết hiệu lực 164/2002/QĐ-UB Quyết định số 164/2002/QĐ-UB Về việc chuyển giao nhiệm vụ quản lý cho thuê nhà từ Công ty kinh doanh và phát triển nhà Lâm Đồng về cho UBND Thành phố Đà Lạt và Thị xã Bảo Lộc quản lý Còn hiệu lực 85/2005/QĐ-UBHN Quyết định 85/2005/QĐ-UBHN Phê duyệt Quy hoạch chi tiết Khu đô thị mới Tứ Hiệp tại xã Tứ Hiệp, huyện Thanh Trì -Hà Nội, tỷ lệ 1/500 do Uỷ ban nhân dân Thành phố Hà nội ban hành Hết hiệu lực 96/2000/QĐ-UB Quyết định 96/2000/QĐ-UB phê duyệt Quy hoạch chi tiết quận Hoàn Kiếm tỷ lệ 1/2000 (phần quy hoạch sử dụng đất và giao thông) do thành phố Hà Nội ban hành Hết hiệu lực 27/2004/QĐ-UB QUYẾT ĐỊNH SỐ 27/2004/QĐ-UB V/V THÀNH LẬP TRUNG TÂM CÔNG NGHỆ PHẦN MỀM CẦN THƠ THUỘC ỦY BAN NHÂN DÂN THÀNH PHỐ CẦN THƠ Hết hiệu lực 165/2003/QĐ-UB Quyết định số 165/2003/QĐ-UB Ban hành quy định về quản lý nhà nước đối với các hoạt động báo chí trên địa bàn thành phố Đà Nẵng Hết hiệu lực 65/1998/QĐ-UB Quyết định số 65/1998/QĐ-UB V/v thành lập Ban chỉ đạo phòng chống tệ nạn ma túy, mại dâm Tỉnh Bình Phước Còn hiệu lực 56/1999/QĐ-UB Quyết định số 56/1999/QĐ-UB Về việc chia tách trường Phổ thông cấp 2 + 3 Chư Sê thành trường Trung học phổ thông Chư Sê và trường Trung học cơ sở thị trấn Chư Sê Còn hiệu lực 86/2002/QĐ-UB Quyết định số 86/2002/QĐ-UB Về giao chỉ tiêu kế hoạch cho vay vốn Ủy thác năm 2002 cho Quỹ Đầu tư phát triển đô thị. Hết hiệu lực 112/1999/QĐ-UB Quyết định số 112/1999/QĐ-UB V/v: Công nhận trúng tuyển giáo sinh hệ Cao đẳng Sư phạm và Trung học Sư phạm Bình Phước năm học 1998-1999 Còn hiệu lực 113/2002/QĐ-UB Quyết định số 113/2002/QĐ-UB Về điều chỉnh mức vốn cho vay dự án kích cầu năm 2002 của Quỹ Đầu tư phát triển đô thị. Hết hiệu lực 405/2002/QĐ-UB Quyết định số 405/2002/QĐ-UB Phê duyệt quy hoạch chi tiết sử dụng đất tỷ lệ 1/500 Khu đô thị mới Văn Quán - Yên Phúc Thị xã Hà Đông Còn hiệu lực 04/2004/QĐ-UB Quyết định số 04/2004/QĐ-UB Về giao chỉ tiêu kế hoạch huy động nghĩa vụ lao động công ích năm 2004 Hết hiệu lực 49/2004/QĐ-UB Quyết định số 49/2004/QĐ-UB V/v ủy quyền Chủ tịch UBND các huyện, thị xã quyết định việc thanh lý tài sản là nhà thuộc trụ sở làm việc, các công trình xây dựng gắn liền với đất Hết hiệu lực 188/2003/QĐ-UB Quyết định số 188/2003/QĐ-UB Về việc duyệt quy hoạch chi tiết sử dụng đất khu đô thị du lịch lấn biển Cần Giờ - thành phố Hồ Chí Minh Còn hiệu lực 1312/2002/QĐ-UB Quyết định số 1312/2002/QĐ-UB V/v Ban hành kích thước lộ giới và tim đường Nguyễn Du, thành phố Thái Nguyên Còn hiệu lực 82/2003/QĐ-UB Quyết định số 82/2003/QĐ-UB Về việc thành lập Phòng Xử lý sau Thanh tra thuộc Thanh tra Nhà nước tỉnh Sơn La Hết hiệu lực 1381/2001/QĐ-UB Quyết định số 1381/2001/QĐ-UB V/v Ban hành kích thước lộ giới và tim đường Quang Trung, thành phố Thái Nguyên Còn hiệu lực 3/2000/QĐ-UB Quyết định số 3/2000/QĐ-UB v/v Điều lệ Quản lý Xây dựng theo quy hoạch chi tiết Khu đô thị mới Yên Hoà quận Cầu Giấy - Hà Nội, tỷ lệ 1/500 do Uỷ ban nhân dân thành phố Hà Nội ban hành Hết hiệu lực 82/1999/QĐ-UB Quyết định số 82/1999/QĐ-UB Về việc trợ cấp cho cán bộ được cử đi đào tạo, bồi dưỡng theo Quy định 131/TU/QĐTT, ngày 01/10/1998 của Ban Thường vụ Tỉnh ủy Hết hiệu lực 43/1999/QĐ-UB Quyết định số 43/1999/QĐ-UB v/v phê duyệt quy hoạch chi tiết quận Cầu Giấy - Hà Nội tỷ lệ 1/2000 do Ủy ban nhân dân thành phố Hà Nội ban hành Hết hiệu lực 76/1999/QĐ-UB Quyết định số 76/1999/QĐ-UB v/v phê duyệt Quy hoạch chi tiết Khu đô thị mới Mỹ Đình, huyện Từ Liêm, Hà Nội, tỷ lệ 1/2000 Hết hiệu lực 30/2004/QĐ-UB QUYẾT ĐỊNH SỐ 30/2004/QĐ-UB VỀ VIỆC THÀNH LẬP CÁC PHÒNG (VÀ TƯƠNG ĐƯƠNG) VÀ CÁC ĐƠN VỊ SỰ NGHIỆP THUỘC ỦY BAN NHÂN DÂN QUẬN NINH KIỀU, THÀNH PHỐ CẦN THƠ Hết hiệu lực

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.