This section provides detailed descriptions of the structure and cost standards for developing a new industry or territorial development plan, as well as reviewing, adjusting, and supplementing existing plans. It includes main tasks such as drafting research outlines, collecting data and materials, designing plans, compiling comprehensive reports and summaries, creating current status and planning maps and charts, conducting review and approval seminars, and other costs.
적용 범위
These agencies are responsible for developing or reviewing, adjusting, and supplementing industry or territorial development plans at provincial level cities directly under the central government.
핵심 사항
- Costs for drafting research outlines and organizing implementation
- Costs for collecting data and materials
- Costs for designing plans
- Costs for compiling comprehensive reports and summaries
- Costs for creating maps and charts
- Costs for review and approval seminars
🌐 이 문서의 사회적 영향
- Ensuring scientific and effective aspects in the development and adjustment of industry or territorial development plans.
- Assisting responsible agencies in managing finances for planning work reasonably.
❓ 자주 묻는 질문
What is the maximum capital for reviewing, adjusting, and supplementing the comprehensive development plan for industries at the provincial level?
The maximum capital for this purpose is calculated at 40% of the capital for the provincial plan.
What are the main tasks in the process of developing a new plan?
They include drafting research outlines, collecting data and materials, designing plans, compiling comprehensive reports and summaries, creating current status and planning maps and charts, and conducting review and approval seminars.
전문
Pursuant to …;
REGARDING THE PROVISION OF TEMPORARY FRAMEWORKS AND COST STANDARDS FOR THE CONSTRUCTION OF COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES
master plan for the overall development of the Economy - Society sector, territory
____________________________
MINISTER OF PLANNING AND INVESTMENT
BASED ON DECREE NO. 75/CP OF NOVEMBER 1, 1995 OF THE GOVERNMENT ON THE FUNCTIONS, TASKS, POWERS, AND ORGANIZATIONAL STRUCTURE OF THE MINISTRY OF PLANNING AND INVESTMENT.
BASED ON DECREE NO. 52/1999/NĐ-CP OF JULY 8, 1999 OF THE GOVERNMENT ON THE REGULATIONS FOR INVESTMENT MANAGEMENT AND CONSTRUCTION AND DECREE NO. 12/2000/NĐ-CP OF MAY 5, 2000 OF THE GOVERNMENT ON AMENDMENTS AND SUPPLEMENTS TO CERTAIN ARTICLES OF THE REGULATIONS FOR INVESTMENT MANAGEMENT AND CONSTRUCTION.
BASED ON DIRECTIVE NO. 32/1998/CT-TTg ON COMPREHENSIVE PLANNING WORK AND DOCUMENT NO. 7689 BKH/CLPT ON IMPLEMENTATION OF DIRECTIVE NO. 32/1998/CT-TTg ON NOVEMBER 6, 1998.
BASED ON CIRCULAR NO. 05/1999/TT-BKH OF NOVEMBER 11, 1999 ON GUIDELINES FOR THE MANAGEMENT OF PLANNING PROJECTS ISSUED BY THE MINISTER OF PLANNING AND INVESTMENT.
BASED ON DECREE NO. 201/CP OF MAY 26, 1981 OF THE STATE COUNCIL (NOW THE GOVERNMENT) ON ECONOMIC AND TECHNICAL STANDARDS MANAGEMENT AND DECISION NO. 404/CT OF DECEMBER 4, 1984 OF THE CHAIRMAN OF THE STATE COUNCIL OF MINISTERS (NOW THE PRIME MINISTER) ON DELEGATING AUTHORITY TO THE HEAD OF THE NATIONAL PLANNING COMMITTEE (NOW THE MINISTER OF PLANNING AND INVESTMENT) TO REVIEW AND ISSUE NATIONAL ECONOMIC AND TECHNICAL STANDARDS.
PURSUANT TO THE PROPOSAL OF THE PERMANENT NATIONAL STANDARDS REVIEW BOARD.
DECISION:
Article 1. NOW PROVIDE TEMPORARILY WITH THIS DECISION THE FRAMEWORKS AND COST STANDARDS FOR THE CONSTRUCTION OF COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES.
Article 2. THIS DECISION SHALL TAKE EFFECT UNIFORMLY ACROSS THE COUNTRY FROM THE DATE OF ISSUANCE.
Article 3. MINISTRIES, GOVERNMENT-LEVEL AGENCIES, AND PROVINCE PEOPLE'S COUNCILS UNDER THE DIRECT CONTROL OF THE CENTRAL GOVERNMENT ARE RESPONSIBLE FOR ENFORCING THIS DECISION.
Article 4. ANY ISSUES ARISING DURING IMPLEMENTATION THAT ARE NOT SUITABLE SHOULD BE REPORTED IN WRITING TO THE PERMANENT NATIONAL STANDARDS REVIEW BOARD FOR REVIEW AND PROMPT ADJUSTMENT.
|
|
Vo Hong Phuc (Signed) |
FRAMEWORKS AND COST STANDARDS FOR THE CONSTRUCTION OF COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES
(ISSUED ACCOMPANYING DECISION NO. 519/2002/QĐ-BKH OF AUGUST 26, 2002)
____________________________________
Part 1:
GENERAL PROVISIONS
1. THESE FRAMEWORKS AND COST STANDARDS ARE THE BASIS FOR ESTABLISHING CAPITAL PLANS AND COSTS FOR THE CONSTRUCTION OF COMPREHENSIVE PLANS AND REVIEWS, ADJUSTMENTS, AND SUPPLEMENTS TO COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES AS FOLLOWS:
1.1. COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF PRIMARY INDUSTRY LEVELS AS DEFINED IN DECREE NO. 75/CP OF OCTOBER 27, 1993 OF THE GOVERNMENT ON THE ESTABLISHMENT OF THE NATIONAL ECONOMIC SECTOR SYSTEM. THESE INDUSTRIES ARE INCLUDED IN THE FOLLOWING FIELDS:of in the following areas:
1.1.1. ECONOMIC AND TECHNICAL INFRASTRUCTURE FIELD
- TRANSPORT NETWORK.
- POST AND TELECOMMUNICATION NETWORK.
- WATER RESOURCES SYSTEM AND COMPREHENSIVE WATER USE (WATER SUPPLY, DRAINAGE).
- ELECTRICITY NETWORK.
1.1.2. SOCIAL INFRASTRUCTURE FIELD
- EDUCATION AND TRAINING INDUSTRY.
- HEALTH AND HEALTH CARE INDUSTRY.
- CULTURE AND INFORMATION.
- SPORTS.
1.1.3. PRODUCTION AND BUSINESS FIELD (SXKD)
- CONSTRUCTION INDUSTRY.
- INDUSTRY.
- AGRICULTURE AND FORESTRY.
- FISHERIES.
- TRADE.
- FINANCE AND CREDIT.
- TOURISM.
1.1.4. SCIENCE AND TECHNOLOGY AND ENVIRONMENT PROTECTION FIELD
- SCIENCE AND TECHNOLOGY.
- Environmental protection.
1.2. COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF REGIONAL AND TERRITORIAL ECONOMIES AND SOCIETIES
- COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF REGIONAL ECONOMIES AND SOCIETIES INCLUDING MULTIPLE PROVINCES (REFERRED TO AS LARGE REGIONAL PLANS) AND NATIONAL KEY ECONOMIC ZONES.
- COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF PROVINCIAL ECONOMIES AND SOCIETIES (REFERRED TO AS PROVINCIAL PLANS).
- COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF DISTRICT, COUNTY, CITY, AND PROVINCE ECONOMIES AND SOCIETIES (REFERRED TO AS DISTRICT PLANS).
ALL ENTITIES USING STATE FUNDS TO IMPLEMENT COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES MUST COMPLY WITH THE PROVISIONS OF THIS DOCUMENT.
3. BASIS FOR BUILDING FRAMEWORKS AND COST STANDARDS FOR COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES:
THE CONSTRUCTION OF FRAMEWORKS AND COST STANDARDS FOR COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY AND TERRITORIAL ECONOMIES AND SOCIETIES IS BASED ON THE FOLLOWING FACTORS:
- DIRECTIVE NO. 32/1998/CT-TTg ON COMPREHENSIVE PLANNING WORK AND DOCUMENT NO. 7689 BKH/CLPT ON IMPLEMENTATION OF DIRECTIVE NO. 32/1998/CT-TTg ON NOVEMBER 6, 1998.
- CIRCULAR NO. 05/1999/TT-BKH OF NOVEMBER 11, 1999 ON GUIDELINES FOR THE MANAGEMENT OF PLANNING PROJECTS ISSUED BY THE MINISTER OF PLANNING AND INVESTMENT.
- GUIDELINES FOR THE DEVELOPMENT OF COMPREHENSIVE PLANS FOR THE ECONOMIES AND SOCIETIES OF PROVINCES AND DIRECTLY CONTROLLED CITIES ISSUED BY THE MINISTRY OF PLANNING AND INVESTMENT.
- CURRENT REGULATIONS ON LABOR AND WAGES AND OTHER RELATED EXPENSES.
- DECREE NO. 15/CP OF MAY 2, 1993 OF THE GOVERNMENT ON THE TASKS, POWERS, AND RESPONSIBILITIES OF GOVERNMENT MANAGEMENT BY MINISTRIES AND GOVERNMENT-LEVEL AGENCIES..
- DECREE NO. 52/1999/NĐ-CP OF JULY 8, 1999 OF THE GOVERNMENT ON THE REGULATIONS FOR INVESTMENT MANAGEMENT AND CONSTRUCTION AND DECREE NO. 12/2000/NĐ-CP OF MAY 5, 2000 OF THE GOVERNMENT ON AMENDMENTS AND SUPPLEMENTS TO CERTAIN ARTICLES OF THE REGULATIONS FOR INVESTMENT MANAGEMENT AND CONSTRUCTION.
3.1. FOR THE CONSTRUCTION OF COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF INDUSTRY, THE FOLLOWING CONTENTS MUST BE REFLECTED:
- INVENTORY, SURVEY, AND EVALUATION OF FACTORS AND CONDITIONS FOR INDUSTRY DEVELOPMENT (EVALUATION OF DEVELOPMENT CONDITIONS, CURRENT DEVELOPMENT STATUS, STARTING POINT OF THE INDUSTRY, ACUTE CONTRADICTIONS TO BE RESOLVED; MARKET FORECAST AND ANALYSIS OF COMPETITIVE REQUIREMENTS FOR MAJOR PRODUCTS; EVALUATION AND FORECAST OF ABILITY TO ATTRACT FOREIGN CAPITAL AND TECHNOLOGY).
- DEVELOPMENT DIRECTION FORECAST
ARGUMENTATION OF DEVELOPMENT OBJECTIVES AND DIRECTIONS, ROLE OF THE INDUSTRY IN THE NATIONAL ECONOMY (INDUSTRY STRUCTURE; DOMINANT PRODUCT OR FIELD STRUCTURE; GROWTH RATE...).
- SELECTION OF DISTRIBUTION (OR ORGANIZATION) OPTIONS FOR THE INDUSTRY BY TERRITORY.
- IDENTIFICATION OF IMPLEMENTATION STRATEGIES FOR THE PLAN.
ARGUMENTATION OF PRIORITY PROGRAMS AND PROJECTS; CAPITAL AND LABOR NEEDS...
IDENTIFICATION OF DEVELOPMENT POLICY STRATEGIES.
3.2. FOR THE CONSTRUCTION OF COMPREHENSIVE PLANS FOR THE DEVELOPMENT OF REGIONAL AND TERRITORIAL ECONOMIES AND SOCIETIES, THE FOLLOWING CONTENTS MUST BE REFLECTED:
- Content 1: Inventory, analysis, evaluation, forecasting the ability to mobilize factors and conditions for development.
- Content 2: Argumentation on the direction of planning for development.
- Content 3: Solutions, mechanisms, and policies to implement the plan.
4. The framework price and standard cost include all necessary expenses to carry out all activities serving research to develop the overall industry development plan and the overall socio-economic development plan for regions and territories.
The costs for topographic map surveying and geological drilling work are not included in the cost content for establishing the overall industry development plan and the overall socio-economic development plan for regions and territories.
5. For overall industry development plans and overall socio-economic development plans for regions and territories that cannot apply the levels specified in this framework price and standard cost, a task and budget must be established and submitted for approval by the competent authority after agreement from:
a. The Ministry of Planning and Investment for overall industry development plans (level l) and overall socio-economic development plans for centrally governed cities, regions, territories, and the entire country.
b. Relevant Ministries for overall specialized industry development plans for other provinces and cities.
Part II:
FRAMEWORK PRICE AND STANDARD COST FOR BUILDING OVERALL DEVELOPMENT PLANS
I. FRAMEWORK PRICE (CAPITAL) FOR BUILDING OVERALL INDUSTRY DEVELOPMENT PLANS FOR THE ENTIRE COUNTRY
1. Building an overall industry development plan (new construction)
1.1. For the economic and technical infrastructure sector (transport network development planning; electricity network development planning, water resources system and comprehensive water utilization planning, postal and telecommunications network and social infrastructure planning) nationwide, the capital for one plan is approximately 1.2 billion to 1.5 billion VND.
For each sub-sector within the above sectors, the capital for implementing the plan is calculated at about 50% of the capital for the corresponding industry development plan.
Example: The capital for the national road transport network development plan is 1.2 billion VND x 50% = 600 million VND.
1.2. For the production and business sector
1.2.1. Industry
- The average framework price for the overall industrial development plan for Vietnam does not exceed 1.3 billion VND.
- For each sub-sector within the industry, the capital for the plan is calculated at 50% of the framework price of the overall industrial development plan.
Example: The capital for the overall steel industry development plan is calculated as follows: 1.3 billion VND x 50% = 650 million VND.
1.2.2. Fisheries
The average framework price for the overall fisheries development plan for Vietnam is approximately 800 to 900 million VND.
For each sub-sector within the fisheries industry, the capital for the plan is calculated at 50% of the framework price of the overall fisheries development plan.
1.2.3. Agriculture and Forestry
- The average framework price for one plan is approximately 700 to 800 million VND.
- For each sub-sector within agriculture and forestry, the capital for the plan is calculated at 50% of the framework price of the overall agriculture and forestry development plan.
1.2.4. Commerce
- The average framework price for the overall commerce development plan for Vietnam is approximately 600 to 700 million VND.
- For each sub-sector within the commerce industry, the capital for the plan is calculated at 50% of the framework price of the overall commerce development plan.
1.2.5. Tourism
- The average framework price for the overall tourism development plan for Vietnam is approximately 600 to 700 million VND.
1.3. For the social infrastructure, science and technology, and environment sector (education, training, healthcare, culture and information, sports, science and technology, and environmental protection), the framework price for each industry within this sector is approximately 600 to 700 million VND.
- For each sub-sector within the above industries, the capital for the plan is calculated at 50% of the unit price of the industry's plan.
Example: The framework price for developing the primary education system nationwide is: 600 million VND x 50% = 300 million VND.
2. For projects reviewing, adjusting, and supplementing overall industry development plans at the national level
For industry plans that have been developed and approved by the competent authority, when conducting reviews, adjustments, and supplements to these plans, the capital is calculated as follows:
- Up to 50% of the capital stipulated for new industry planning projects in Section 1 above if the plan has been implemented for three years or more.
Example: The overall steel industry development plan has been developed. In 2002 (three years after implementation), according to requirements, a review is needed. The capital for the review is calculated as follows:
The framework price for reviewing the overall steel industry development plan = 1.3 billion VND x 50% = 650 million VND.
- Up to 60% of the capital stipulated for new industry planning projects in Section 1 above if the plan has been implemented for over five years.
With the same example, in 2003, a review is conducted:
The framework price for reviewing the overall steel industry development plan = (1.3 billion VND x 50%) x 60% = 390 million VND.
Part 3:
FRAMEWORK PRICE AND STANDARD COST FOR BUILDING OVERALL SOCIO-ECONOMIC DEVELOPMENT PLANS FOR REGIONS, PROVINCES, AND CENTRALLY-GOVERNED CITIES
I. FRAMEWORK PRICE FOR BUILDING OVERALL SOCIO-ECONOMIC DEVELOPMENT PLANS FOR REGIONS, PROVINCES, AND CENTRALLY-GOVERNED CITIES
1. Using the formula for calculating the construction price of overall socio-economic development plans
Priceaccording to Law No. = G x S (1)
Where:
Priceaccording to Law No. where G is the construction price of the overall socio-economic development plan per unit area (km2) determined based on the population density of the planned region (unit: thousand VND).
S is the area of the planned territory (km2).
Using data on area and population density according to statistics from the General Statistics Office and the Provincial/City Statistics Office regarding the territory at the projected year of plan implementation. For example, if planning for Province A in 2002, use the area and population density statistics for Province A in 2002 issued by the Provincial Statistics Office.
2. Framework price (capital) for building overall socio-economic development plans for large regions and key economic zones,
2.1. For new construction.
2.1.1. The framework price for constructing a plan for a large region is calculated using formula (1) and based on the VND/km2 rate in Table 1.
2.1.1. The framework price for developing a large regional plan is calculated according to formula (1) and based on the level of Vietnamese dong/km2 in table 1 to determine.
Example: The calculation to determine the price of the socio-economic development plan for the Red River Delta region is carried out as follows:
- The year this plan is implemented is 2001. According to the Statistical Yearbook, in 2001, the Red River Delta region had an area of 20,689 km2; population of 18,035,300 people; population density of 872 people/km2.
- Referring to Table 1, corresponding to the above data, the planning price/1 km2 is 150,000 VND.
- Using formula (1) for calculation, we have:
Priceaccording to Law No. The price of the Red River Delta region = 150,000 VND/km2 x 20,689 km2 = 3,103,350,000 VND.
Table 1: Framework price for planning and reviewing comprehensive socio-economic development plans for regions
|
Scale (1000 km2) |
<15 |
15<25 |
25<35 |
35<45 |
45<55 |
55<65 |
65<75 |
>75 |
|
|
Planning price for comprehensive socio-economic development (1000 VND/km2) |
Population density >1000 people/km2 |
200 |
180 |
165 |
148 |
128 |
112 |
93 |
72 |
|
|
Population density from 800 to 1000 people/km2 |
165 |
150 |
138 |
123 |
108 |
94 |
78 |
60 |
|
|
Population density from 500 to <800 people/km2 |
148 |
134 |
120 |
110 |
95 |
83 |
70 |
50 |
|
|
Population density from 300 to <500 people/km2 |
132 |
120 |
110 |
97 |
85 |
74 |
62 |
48 |
|
|
Population density from 100 to <300 people/km2 |
115 |
105 |
96 |
85 |
75 |
65 |
54 |
42 |
|
|
Population density <100 people/km2 |
98 |
89 |
81 |
73 |
63 |
55 |
46 |
36 |
2.1.2. The framework price for building a comprehensive socio-economic development plan for key economic regions is calculated according to formula (1) and based on the level of Vietnamese dong/km2 in Table 1 multiplied by a factor K = 1.2 to determine.
Example: To calculate the price of the socio-economic development plan for the Northern Key Economic Region is carried out as follows:
- The year this plan is implemented is 2001. According to the Statistical Yearbook, in 2001, the Northern Key Economic Region had an area of 10,911.3 km2, population of 8,184,200 people; population density of 750 people/km2.
- Referring to Table 1, corresponding to the above data, the planning price/1 km2 is 150,000 VND.
- Using formula (1) and multiplying by the factor 1.2, we have:
The price of the Northern Key Economic Region = 150,000 VND x 10,911.3 km2 x 1.2 = 1,964,034,000 VND.
2.2- For projects reviewing, adjusting, and supplementing comprehensive socio-economic development plans for large regions and key economic regions
Large regions and key economic regions that have established plans and received approval decisions from competent authorities, when conducting reviews, adjustments, and supplements to those plans, shall:
- For plans that have been implemented for three years or more, when it is necessary to review, adjust, and supplement, the price level is calculated at 50% of the price specified in points 2.1.1; 2.1.2
- For plans that have been implemented for over five years, when it is necessary to review, adjust, and supplement, the price level is calculated at 60% of the price specified in points 2.1.1; 2.12
3. Framework price (capital amount) for building comprehensive socio-economic development plans for provinces and centrally-administered cities.
3.1. For establishing a new plan:
3.1.1. The framework price for establishing a provincial or centrally-administered city plan is calculated according to formula (1) and based on the level of Vietnamese dong/km2 in Table 2 to determine.
Example: To calculate the framework price of the comprehensive socio-economic development plan for Ha Tinh province is carried out as follows:
- The year this plan is implemented is 2001. According to the Statistical Yearbook, in 2001, Ha Tinh had an area of 6,055.7 km2; population of 1,279,100 people; population density of 211 people/km2.
- Referring to Table 2, corresponding to the above data, the planning price/1 km2 is 100,000 VND.
- Using formula (1) for calculation, we have:
The price of Ha Tinh province = 100,000 VND x 6,055.7 km2 = 605,570,000 VND
Table 2: Framework price for planning and reviewing comprehensive socio-economic development plans for provinces and centrally-administered cities
|
Scale (1000 km2) |
<1 |
1<2 |
2<3 |
3<5 |
5<8 |
8<11 |
11<15 |
>15 |
|
|
Planning price for socio-economic development of provinces and centrally-administered cities (thousand VND) |
Population density >1500 people/km2 |
900 |
600 |
320 |
250 |
200 |
200 |
120 |
80 |
|
|
Population density 1200 to <1500 people/km2 |
700 |
500 |
310 |
250 |
160 |
150 |
100 |
85 |
|
|
Population density 1000 to <1200 people/km2 |
600 |
400 |
300 |
250 |
140 |
140 |
95 |
70 |
|
|
Population density 800 to <1000 people/km2 |
550 |
420 |
320 |
250 |
120 |
130 |
90 |
65 |
|
|
Population density 500 to <800 people/km2 |
520 |
350 |
350 |
200 |
100 |
120 |
85 |
60 |
|
|
Population density 300 to <500 people/km2 |
500 |
350 |
350 |
200 |
100 |
110 |
80 |
55 |
|
|
Population density from 100 to <300 people/km2 |
480 |
250 |
250 |
150 |
100 |
100 |
70 |
50 |
|
|
Population density <100 people/km2 |
450 |
200 |
200 |
150 |
90 |
70 |
70 |
40 |
3.1.2- The framework price for establishing a comprehensive socio-economic development plan for a centrally-administered city classified as a first-tier city is calculated according to formula (1) and based on the level of Vietnamese dong/km2 in Table 2 multiplied by a factor K = 1.5 to determine.
3.1.3- The framework price for establishing a comprehensive socio-economic development plan for a province or centrally-administered city with a second-tier city is calculated according to formula (1) and based on the level of Vietnamese dong/km2 in Table 2 multiplied by a factor K = 1.2 to determine.
3.2- For reviewing, adjusting, and supplementing comprehensive socio-economic development plans for provinces and centrally-administered cities.
Provinces and centrally-administered cities that have established plans and received approval decisions from competent authorities, when conducting reviews, adjustments, and supplements to those plans, shall:
- For plans that have been implemented for three years or more, when it is necessary to review, adjust, and supplement, the framework price is calculated at 50% of the price specified in points 3.1.1; 3.1.2; 3.1.3.
- For plans that have been implemented for over five years, when it is necessary to review, adjust, and supplement, the framework price is calculated at 60% of the price specified in points 3.1.1; 3.1.2; 3.1.3.
4. Framework price for comprehensive socio-economic development plans for districts and towns under provinces and centrally-administered cities.
The framework price for planning or reviewing, adjusting, and supplementing comprehensive socio-economic development plans for districts and towns under provinces and centrally-administered cities is calculated at 40% of the capital of the provincial plan that includes such districts and towns; for districts and towns under centrally-administered cities, it is calculated at 50% of the cost of the comprehensive socio-economic development plan for the city.
For example, to calculate the framework price for the Ha Tinh town (QHHT) under Ha Tinh province is as follows:
(QHHT) = provincial planning capital x 40% = 605,570,000 VND x 40% = 242,228,000 VND.
5. Framework price (capital amount) for comprehensive industry development plans within a province or centrally-administered city.
The capital amount for planning or reviewing, adjusting, and supplementing comprehensive industry development plans within a province or centrally-administered city is calculated at 40% of the capital of the provincial or centrally-administered city plan.
PART FOUR
STRUCTURE FOR SETTING THE COST LEVELS FOR SPECIFIC TASKS IN THE DEVELOPMENT OF A SECTORAL AND TERRITORIAL DEVELOPMENT PLAN
1. For developing a new plan
Table 3: Cost standards for tasks in a comprehensive development plan for sectors and territories
|
No. |
Content of work |
Percentage (%) |
|
|
(thousand dong/year) |
100 |
|
I |
Costs for drafting the research outline and organizational implementation tasks |
2 |
|
II |
Costs for investigation, collection of materials and data for planning research |
20 |
|
1 |
Costs for collecting and processing materials and supplementary surveys |
6 |
|
2 |
Costs for calculating figures and data |
3 |
|
3 |
Costs for analyzing and processing research materials and data |
6 |
|
4 |
Costs for travel and accommodation to survey locations |
5 |
|
III |
Costs for planning design |
50 |
|
1 |
Costs for inventorying and evaluating development factors and conditions |
11 |
|
2 |
Costs for calculation, forecasting, and justification of development orientations |
18 |
|
3 |
Costs for researching solutions |
21 |
|
IV |
Costs for compiling summary reports and executive summaries |
10 |
|
V |
Costs for map and chart preparation showing current status and planning |
8 |
|
VI |
Costs for seminars, reviews, approvals, and other expenses |
10 |
|
1 |
Conferences, seminars |
2 |
|
2 |
Costs for soliciting opinions and expert consultations |
2 |
|
3 |
Costs for review and acceptance |
3 |
|
4 |
Management fee costs |
3 |
2. For reviewing, adjusting, and supplementing a comprehensive development plan for economic and social sectors and territories
Table 4: Cost standards for tasks in reviewing a comprehensive development plan for sectors and territories
|
No. |
Content of work |
Percentage (%) |
|
|
(thousand dong/year) |
100 |
|
I |
Costs for drafting the research outline and organizational implementation tasks |
2 |
|
II |
Costs for investigation, collection of materials and data for planning research |
19 |
|
1 |
Costs for collecting and processing materials and supplementary surveys |
7 |
|
2 |
Costs for calculating figures and data |
3 |
|
3 |
Costs for analyzing and processing research materials and data |
4 |
|
4 |
Costs for travel and accommodation to survey locations |
5 |
|
III |
Costs for planning design |
55 |
|
1 |
Costs for inventorying and evaluating development factors and conditions |
10 |
|
2 |
Costs for calculation, forecasting, and justification of development orientations |
20 |
|
3 |
Costs for researching solutions |
25 |
|
IV |
Costs for compiling summary reports and executive summaries |
9 |
|
V |
Costs for map and chart preparation showing current status and planning |
5 |
|
VI |
Costs for seminars, reviews, approvals, and other expenses |
10 |
|
1 |
Conferences, seminars |
2 |
|
2 |
Costs for soliciting opinions and expert consultations |
2 |
|
3 |
Costs for review and acceptance |
3 |
|
4 |
Management fee costs |
3 |