Decree No. 82/2017/NĐ-CP stipulates the method of calculation, and the amount of fees for granting the right to exploit water resources.

This Decree stipulates the calculation and collection of fees for granting the right to exploit water resources within the country. It includes provisions on entities required to pay, methods of calculation, and necessary documents to fulfill this obligation. The Decree also addresses the responsibilities of relevant agencies such as the Ministry of Natural Resources and Environment, the General Department of Taxation, and local tax bureaus in managing and collecting fees for granting the right to exploit water resources. Finally, it specifies its effective date and transitional provisions for applications submitted before the Decree takes effect.

Số hiệu82/2017/NĐ-CP
Loại văn bảnDecree
Cơ quan ban hànhMinistry of Agriculture and Environment
Người kýNguyễn Xuân Phúc — Thủ tướng Chính phủ
Cập nhật17/06/2026
Lĩnh vựcUncategorized
Ngày ban hành17/07/2017
Ngày áp dụng01/09/2017
Ngày hết hiệu lực01/07/2024
Tình trạngExpired
✦ Tóm lược thông minh

This Decree stipulates the calculation and collection of fees for granting the right to exploit water resources within the country. It includes provisions on entities required to pay, methods of calculation, and necessary documents to fulfill this obligation. The Decree also addresses the responsibilities of relevant agencies such as the Ministry of Natural Resources and Environment, the General Department of Taxation, and local tax bureaus in managing and collecting fees for granting the right to exploit water resources. Finally, it specifies its effective date and transitional provisions for applications submitted before the Decree takes effect.

Đối tượng áp dụng

All organizations and individuals using natural water sources within the country must comply with this Decree if they fall under the category required to pay fees for granting the right to exploit water resources according to the Water Resources Law and this Decree.

Các điểm cốt lõi

  • pay fees for granting the right to exploit water resources
  • Method of calculating fees for granting the right to exploit water resources
  • Necessary documents to fulfill the obligation of paying fees for granting the right to exploit water resources
  • Responsibilities of relevant agencies in managing and collecting fees for granting the right to exploit water resources
  • Effective date and transitional provisions

🌐 Tác động xã hội từ văn bản này

  • Enhance the management and sustainable use of natural water sources.
  • Ensure fairness in charging fees for the use of water resources among organizations and individuals.

❓ Câu hỏi thường gặp

Who must pay fees for granting the right to exploit water resources?

All organizations and individuals using natural water sources must comply with this Decree if they fall under the category required to pay according to the Water Resources Law and this Decree.

How is the calculation of fees for granting the right to exploit water resources carried out?

Fees are calculated based on the volume of water used, the purpose of use, and the economic value of the water resource. Details of the specific calculation method are provided in the Decree.

What are the necessary documents to fulfill the obligation of paying fees for granting the right to exploit water resources?

Include a declaration form for fee calculation, copies of permits for exploiting and using water resources.

Which agencies have the responsibility in managing and collecting fees for granting the right to exploit water resources?

The Ministry of Natural Resources and Environment, the General Department of Taxation, and local tax bureaus all have responsibilities in this regard.

When does this Decree take effect?

This Decree takes effect from September 1, 2017.

Toàn văn

PROVISIONS ON THE METHOD OF CALCULATION AND AMOUNT OF PAYMENT FOR THE RIGHT TO EXPLOIT WATER RESOURCES

Pursuant to the Law on Government Organization dated June 19, 2015;

Pursuant to the Law on Water Resources dated June 21, 2012;

At the proposal of the Minister of Natural Resources and Environment;

The Government issues a Decree to provide for the method of calculation and amount of payment for the right to exploit water resources.

PART I

GENERAL PROVISIONS

Article 1. Scope of Regulation

This Decree provides for the method of calculation and amount of payment for the right to exploit water resources.

Article 2. Applicability

This Decree applies to:

1. State agencies related to the determination, collection, and submission of payments for the right to exploit water resources.

2. Organizations and individuals related to the implementation of the calculation, collection, and submission of payments for the right to exploit water resources.

Article 3. Cases where Payment for the Right to Exploit Water Resources Must Be Made

Organizations and individuals who are granted permits for the exploitation and use of surface water and groundwater (hereinafter referred to as permit holders) must make payments for the right to exploit water resources if they fall under any of the following cases:

1. For the exploitation of surface water:

a) Exploiting surface water for power generation;

b) Exploiting surface water for business, service, and non-agricultural production activities, including water for cooling machines and equipment and steam generation.

2. For the exploitation of groundwater:

a) Exploiting groundwater for business, service, and non-agricultural production activities, including water for cooling machines and equipment and steam generation;

b) Exploiting groundwater (excluding brackish and saline water) for aquaculture, livestock breeding, coffee irrigation, rubber plantations, cashew trees, tea gardens, pepper cultivation, and other long-term industrial crops with a scale of 20 m3/day-night or more.

Article 4. Basis for Calculating Payments for the Right to Exploit Water Resources

1. Purpose of water use, including:

a) Exploiting water for hydropower production;

b) Exploiting water for commercial and service activities;

c) Exploiting water for non-agricultural production activities, including water for cooling machines and equipment and steam generation;

d) Exploiting groundwater for irrigation of coffee, rubber, cashew, tea, black pepper, and other long-term industrial crops;

đ) Exploiting groundwater for aquaculture and livestock breeding.

2. Water quality is determined based on water quality zones or functional zones in the water resource planning; in cases where there is no water resource planning or such zones have not been delineated in the planning, it is based on the actual water quality according to current national technical standards on surface water and groundwater quality.

3. Type of water source exploited includes: Surface water, groundwater.

4. Conditions for exploitation:

a) For surface water, determined according to the area of the surface water source being exploited;

b) For groundwater, it is determined based on the depth of the aquifer being exploited.

5. Scale of exploitation:

a) For hydropower exploitation, determined according to the design documents;

b) In cases where the exploitation and use of water for purposes other than those specified in point a of this clause are determined based on the exploitation and use permit for water resources.

6. The period of exploitation is determined based on the term stipulated in the permit for the exploitation and use of water resources.

Chapter II

AMOUNT OF PAYMENT AND METHOD OF CALCULATION FOR THE RIGHT TO EXPLOIT WATER RESOURCES

Article 5. Amount of Payment for the Right to Exploit Water Resources (M)

The amount of payment for the right to exploit water resources (M) is prescribed according to the purpose of water exploitation, with a value ranging from 0.1% to 2.0%, detailed in Appendix I attached to this Decree.

Article 6. Formula for Calculating Payment for the Right to Exploit Water Resources

1. Payment for the right to exploit water resources for hydropower exploitation is calculated using the following formula:

T = W x G x M

Where:

T - Payment for the right to exploit water resources, unit of measurement is Vietnamese dong;

W - Electricity output as stipulated in Article 7 of this Decree, unit of measurement is kWh;

G - Price for calculating payment for the right to exploit water resources as stipulated in Article 8 of this Decree, unit of measurement is Vietnamese dong/kWh;

M - Rate of payment for the right to exploit water resources as stipulated in Article 5 of this Decree, unit of measurement is percentage (%).

2. Payment for the right to exploit water resources for cases other than those stipulated in Clause 1 of this Article is calculated using the following formula:

T = W x G x K x M

Where:

T - Payment for the right to exploit water resources, unit of measurement is Vietnamese dong;

W - Volume of water extracted for calculating payment for the right to exploit water resources as stipulated in Article 7 of this Decree, unit of measurement is cubic meter (m³);3;

G - Price for calculating payment for the right to exploit water resources as stipulated in Article 8 of this Decree, unit of measurement is Vietnamese dong/cubic meter (m³);3;

K - Adjustment factor as stipulated in Article 9 of this Decree;

M - Rate of payment for the right to exploit water resources as stipulated in Article 5 of this Decree, unit of measurement is percentage (%).

Article 7. Quantity for Payment of Exploitation Rights

1. For hydropower production, the quantity for payment of exploitation rights for water resources shall be calculated by dividing the average annual electricity output determined in the project design documents (E, unit: kWh) by 365 days and multiplying by the payment calculation period (days).0(unit of measurement being kWh) divided (/) by 365 days and multiplied (x) by the billing period (in days).

2. In other cases not provided for in Clause 1 of this Article, the exploitation quantity shall be calculated by multiplying the maximum exploitation flow rate specified in the permit (unit: m3/day-night) by the annual exploitation regime and by the payment calculation period (days).3per day and night) specified in the permit multiplied (x) by the annual exploitation regime and multiplied (x) by the billing period (in days).

3. The annual exploitation regime shall be calculated by dividing the number of exploitation days in a year by 365 days. If the permit does not specify, the exploitation regime shall be considered as 365/365 days.

4. The billing period is calculated in days and is determined as follows:

4. The payment calculation period shall be calculated in days and shall be determined as follows:

a) In cases where the works have been operational before the effective date of this Decree but have not yet obtained a permit, it shall be calculated from the effective date of the permit to the expiration date of the permit;

b) In cases where the works have not yet been operational, it shall be calculated from the expected start date of operation to the expiration date of the permit.

The start date of operation is the completion date of investment construction and the official operation of the water extraction work, determined according to the project design documents, the investor's forecast, or based on actual conditions.

a) The permit holder must self-determine and declare the volume of water extracted for each purpose of use and explain the basis for determining the volume of water extracted for those purposes. For the undetermined portion of the volume of water, it shall be applied to the highest rate purpose listed in the permit.

5. In cases where water resources are exploited and used for multiple purposes, the quantity for calculating the payment of exploitation rights shall be calculated separately for each purpose of use as prescribed in this Decree and shall be determined as follows:

a) The permit holder must self-determine and declare the quantity of water extracted for each purpose of use and explain the basis for determining the quantity of water extracted for those purposes. The portion of the quantity that cannot be clearly identified for a specific purpose of use shall be applied to the purpose with the highest charge rate specified in the permit;

b) In cases where multiple water extraction works supply a centralized water supply system, the quantity for calculating the payment of exploitation rights for each purpose of each work shall be determined according to the proportion of water supplied for each purpose of the centralized water supply system;

c) In cases where a production, business, or service facility uses water for living within the facility, the entire quantity of water used shall be counted towards the production, business, or service purpose of the facility. In cases where water is supplied for living outside the facility, it shall be counted as living water supply and shall not be subject to payment of exploitation rights for the quantity of water used for this purpose.

1. The price for calculating the right to exploit water resources for hydropower production is 70% of the electricity price used to calculate the resource tax on water resources for hydropower production.

6. Permits issued after the effective date of this Decree must clearly state the flow rate of water extracted for each purpose of use to serve as the basis for determining the quantity for calculating the payment of exploitation rights for water resources.

Article 8. Price for Payment of Exploitation Rights for Water Resources (G)

Article 9. Adjustment Factor (K)

1. The adjustment factor prescribed in Article 6 of this Decree shall be determined as follows:

K = 1 + (K1+ K2 + K3)

Where:

K1 - Water quality exploitation coefficient;

K2 - Type of water source exploitation coefficient;

K3 - Exploitation condition coefficient.

2. The water quality exploitation coefficient (K1) shall be determined based on the quality of the water source exploited by organizations and individuals.

3. The type of water source exploitation coefficient (K2) shall be determined based on the type of water source including surface water and groundwater exploited by organizations and individuals.

4. The exploitation condition coefficient (K3) shall be determined based on the specific exploitation conditions of the water source exploited by organizations and individuals.

5. The value of the coefficients is specified in Appendix II issued together with this Decree.

Article 10. Competent Authority to Approve the Payment for Granting Water Resources Exploitation Rights

1. The Ministry of Natural Resources and Environment, People's Committees of provinces shall approve the payment for granting water resources exploitation rights in cases within their authority to issue permits for water resources exploitation and utilization.

2. The National Water Resources Management Agency under the Ministry of Natural Resources and Environment shall be responsible for receiving, organizing the review of payment calculation files, and adjusting the payment for granting water resources exploitation rights in cases within the Ministry’s permit issuance authority.

3. Departments of Natural Resources and Environment shall be responsible for receiving, organizing the review of payment calculation files, and adjusting the payment for granting water resources exploitation rights in cases within the provincial People's Committee’s permit issuance authority.

Article 11. Procedures and Formalities for Calculating the Payment for Granting Water Resources Exploitation Rights

1. The file for calculating the payment for granting water resources exploitation rights includes the Declaration Form for Calculating the Payment for Granting Water Resources Exploitation Rights as stipulated in Appendix III issued together with this Decree, containing the following main contents: water quality; type of water source, exploitation conditions, scale of exploitation, time of exploitation, period for calculating payment, production volume for each purpose of use, price for calculating payment, rate of collection for each purpose of use; payment for each purpose of use, total payment for granting exploitation rights, payment submission plan, and accompanying documents to prove.

2. Procedures for receiving, reviewing, and approving the payment for granting water resources exploitation rights:

a) The receipt and review of the payment for granting water resources exploitation rights shall be carried out simultaneously with the receipt and review of the application file for issuing, extending, amending, and reissuing water resources exploitation permits;

b) When submitting the application file for issuing a water resources exploitation and utilization permit, the agency receiving and reviewing the permit application file shall submit a draft decision to approve the payment for granting water resources exploitation rights according to the provisions in Appendix V issued together with this Decree;

c) Within five working days from the date of receipt of the decision approving the payment for granting water resources exploitation rights, the agency receiving and reviewing the file shall notify the permit holder and the local tax office where the exploitation works are located, along with the decision approving the payment for granting water resources exploitation rights.

Article 12. Adjustment, Recovery, and Refund of the Payment for Granting Water Resources Exploitation Rights

1. The payment for the right to exploit water resources may be reviewed and adjusted under one of the following circumstances:

a) There is an amendment to the content of the water resources exploitation and utilization permit leading to changes in the basis for calculating the payment for granting exploitation rights as prescribed in this Decree or leading to changes in the approved payment for granting exploitation rights;

b) There is a change in the actual operation commencement date of the exploitation works compared to the planned operation commencement date when approving the payment for granting water resources exploitation rights;

c) There is an adjustment in the average annual electricity consumption (E0) compared to the design documents of the hydropower project and confirmed in writing by the competent state agency;

d) Additional reservoir tasks are added along with adjustments and supplements to downstream flood control capacity compared to the hydropower plant's mission, except in cases already adjusted according to point c of this clause. The reduction adjustment amount is calculated based on the ratio of the adjusted downstream flood control capacity to the useful capacity of the reservoir;

đ) The works are damaged and cannot continue to operate. The reduction adjustment amount is calculated based on the downtime due to damage;

e) Adjustments can only be made for the remaining term of the permit. The increase adjustment amount does not exceed 20% of the remaining amount to be paid that was previously approved, except in the case stipulated in point b of this clause.

2. Procedures and formalities for adjusting the payment for the right to exploit water resources:

a) For the case stipulated in point a of Clause 1 of this Article, organizations and individuals shall submit the Declaration Form for Calculating the Payment for Granting Water Resources Exploitation Rights as stipulated in Appendix III issued together with this Decree. The receipt and review of the file shall be carried out simultaneously with the receipt and review of the application file for amending or reissuing water resources exploitation permits;

b) For the cases stipulated in points b, c, d, and đ of Clause 1 of this Article, the permit holder shall send a request for adjustment accompanied by supporting documents to the agency receiving the file as stipulated in Article 10 of this Decree.

Within twenty working days, the agency receiving the file shall be responsible for checking and submitting to the competent authority as stipulated in Article 10 of this Decree for consideration and decision on the adjustment;

c) When adjusting the payment for granting water resources exploitation rights, it must be based on the current price for calculating the payment for granting water resources exploitation rights.

3. The payment for the right to exploit water resources shall be recovered in one of the following circumstances:

a) The actual operation commencement date of the works is earlier than the planned date when issuing the permit and approving the payment for granting water resources exploitation rights;

b) A new purpose for exploiting and using water resources requiring payment arises but has not yet been adjusted in the content of the permit by the competent state agency;

c) The scale and production volume of exploitation are higher than those stated in the issued permit;

d) Fraud in declaring or inaccurately declaring the payment for granting water resources exploitation rights leading to reduced amounts payable.

4. The refund of the payment for granting water resources exploitation rights shall be implemented in cases where the competent state authority decides to revoke the permit due to national defense, security reasons, national interest, public interest, or the permit holder returns the issued permit.

5. The competent authority to approve the payment for water resource exploitation rights decides on the adjustment of the payment for water resource exploitation rights, notifies the amount to be collected or refunded to the license holder and the local tax office where the water resource exploitation works are located, and specifies the reasons for collection or refund.

Article 13. Time limit for issuing notices and paying the payment for water resource exploitation rights

1. Within the latest ten working days from the date of receipt of the approval, adjustment, or notification of the payment for water resource exploitation rights, the local tax office where the water resource exploitation works are located shall issue a notice to pay the payment for water resource exploitation rights according to Appendix IV issued together with this Decree, and send it to the organizations or individuals required to pay the payment for water resource exploitation rights.

2. Organizations and individuals required to pay the payment for water resource exploitation rights must pay according to the Notice of the local tax office. The collection and payment of the payment for water resource exploitation rights shall be carried out in accordance with the regulations on revenue collection and management of state budget revenues.

3. After receiving the certificate confirming the payment into the state budget, organizations and individuals required to pay the payment for water resource exploitation rights shall send one certified copy to the National Water Resources Management Agency in cases where the exploitation and use of water resources fall within the licensing authority of the Ministry of Natural Resources and Environment, or to the Provincial Department of Natural Resources and Environment in cases where the exploitation and use of water resources fall within the licensing authority of the provincial People's Committee for monitoring purposes.

Article 14. Methods of collecting, paying, managing, and using the payment for water resource exploitation rights

1. The payment for water resource exploitation rights shall be paid annually according to the amount recorded in the decision approving the payment for water resource exploitation rights. Based on their own capacity, the license holders may choose to pay monthly, quarterly, or annually at the local State Treasury where the water resource exploitation works are located.

2. The collection, payment, and refund of the payment for water resource exploitation rights shall be carried out in accordance with the laws on tax administration.

3. The management, use, and refund of the payment for water resource exploitation rights shall be carried out in accordance with the laws on state budget management, prioritizing its use to ensure activities for protecting water resources, marking boundaries of water source protection zones, supervising water extraction activities, and preventive and response measures for water pollution incidents, but not exceeding fifteen percent.

4. The payment for water resource exploitation rights is a cost determined in the production cost of the license holder.

Article 15. Responsibilities of Ministries, Agencies Equivalent to Ministries, and Provincial People's Committees

1. Responsibilities of the Ministry of Natural Resources and Environment:

a) Guide and direct localities on methods of calculating and levels of collecting the payment for water resource exploitation rights;

b) Approve, adjust, and notify the collection or refund of the payment for water resource exploitation rights in cases where the exploitation and use of water resources fall within their licensing authority;

c) Inspect, audit, and handle violations of laws related to the calculation, collection, and payment of the payment for water resource exploitation rights.

2. Responsibilities of the Ministry of Finance:

Guide, inspect, and audit the implementation of tasks related to the collection, payment, management, and use of the payment for water resource exploitation rights.

3. Ministries and agencies equivalent to ministries within the scope of their duties and powers shall have the responsibility to coordinate with the Ministry of Natural Resources and Environment and the provincial People's Committees in the calculation, collection, and payment of the payment for water resource exploitation rights.

4. Responsibilities of the provincial People's Committees:

a) Approve, adjust, and notify the collection or refund of the payment for water resource exploitation rights in cases where the exploitation and use of water resources fall within their licensing authority;

b) Issue natural water resource tax rates on their territory according to the framework price set by the Ministry of Finance; issue prices as a basis for calculating the payment for water resource exploitation rights in cases where there are no natural water resource tax rates prescribed in Clause 3, Article 8 of this Decree;

c) Inspect, audit, and handle violations of laws related to the calculation, collection, and payment of the payment for water resource exploitation rights within their jurisdiction.

Article 16. Responsibilities of agencies in the work of calculating and collecting fees for granting water resource exploitation rights

1. The Water Resources Management Department shall be responsible for:

a) Organizing the review of documents for calculating fees for granting water resource exploitation rights to be submitted to the Ministry of Natural Resources and Environment for approval and adjustment in cases of exploitation and use of water under the licensing authority of the Ministry of Natural Resources and Environment;

b) Sending notifications along with decisions on approving and adjusting fees for granting water resource exploitation rights to the license holders and local tax bureaus where water resource exploitation works are located;

c) Urging and inspecting the work of calculating fees for granting water resource exploitation rights in localities;

d) Annually compiling results of approved fees for granting water resource exploitation rights and payment of such fees nationwide, reporting to the Ministry of Natural Resources and Environment.

2. Provincial Departments of Natural Resources and Environment shall be responsible for:

a) Organizing the review of documents for calculating fees for granting water resource exploitation rights to be submitted to the People's Committee of the province for approval and adjustment in cases of exploitation and use of water under the licensing authority of the People's Committee of the province;

b) Sending notifications along with decisions on approving and adjusting fees for granting water resource exploitation rights within the licensing authority of the People's Committee of the province to the license holders and local tax bureaus;

c) Annually compiling results of approved fees for granting water resource exploitation rights within their jurisdiction, reporting to the People's Committee of the province and the Ministry of Natural Resources and Environment (through the Water Resources Management Department) before December 15.

3. The General Tax Department shall be responsible for:

Annually (before December 15), compiling results of collection of fees for granting water resource exploitation rights nationwide, sending to the Ministry of Finance and the Ministry of Natural Resources and Environment (through the Water Resources Management Department) for consolidation.

4. Local tax bureaus where water resource exploitation works are located shall be responsible for:

a) Issuing notices on payment of fees for granting water resource exploitation rights, late payment penalties, and fines according to the laws on tax management due to exceeding the deadline stated in the notice (if applicable) and sending them to the license holders;

b) Summarizing, accounting, and reporting revenues from fees for granting water resource exploitation rights according to current regulations.

Article 17. Responsibilities of organizations and individuals paying fees for granting water resource exploitation rights

1. Paying fees for granting water resource exploitation rights within the deadlines specified in the tax authority's notices.

2. In cases where there is a need to adjust the number of payments or the amount to be paid per payment, they must submit a written request to the local tax bureau that issued the notice.

3. In cases where fees for granting water resource exploitation rights are paid into the state budget after the prescribed deadline, in addition to the amount specified in the notice, they must also pay penalties and late payment charges according to the laws on tax management.

4. In cases of transferring water resource exploitation rights, the license holder must fulfill the obligation to pay fees for granting water resource exploitation rights up to the transfer date.

Chapter III

IMPLEMENTATION

Article 18. Transitional Provisions

1. For applications for water resource licenses received by competent authorities before this Decree takes effect, they shall continue to be processed as follows:

a) If organizations or individuals applying for a license require additional documentation for calculating fees for granting water resource exploitation rights, the agency receiving the application shall be responsible for accepting and reviewing it concurrently with the licensing process;

b) If organizations or individuals applying for a license do not provide additional documentation for calculating fees for granting water resource exploitation rights, the process of accepting and reviewing the application shall be carried out as if the license had been granted before this Decree took effect.

2. The period for calculating fees for granting water resource exploitation rights for cases where licenses were granted before this Decree takes effect shall be calculated in days and determined as follows:

a) For projects already in operation, the calculation period starts from the date this Decree takes effect until the expiration date of the license;

b) For projects not yet in operation, the determination shall be made according to point b, Clause 4, Article 7 of this Decree.

3. The deadline for submitting documents for calculating fees for granting water resource exploitation rights for cases where licenses were granted before this Decree takes effect:

a) Within a maximum of 12 months from the date this Decree takes effect, organizations and individuals required to pay fees for granting water resource exploitation rights must complete the calculation and submission of documents for calculating fees for granting water resource exploitation rights according to regulations;

b) The Water Resources Management Department shall notify license holders licensed by the Ministry of Natural Resources and Environment, and Provincial Departments of Natural Resources and Environment shall notify license holders licensed by the People's Committee of the province to submit documents for calculating fees for granting water resource exploitation rights.

4. Procedures and formalities for calculating fees for granting water resource exploitation rights for cases where licenses were granted before this Decree takes effect:

a) Documents for calculating fees for granting water resource exploitation rights include: A declaration form for calculating fees for granting water resource exploitation rights as per Appendix III attached to this Decree; a copy of the water resource exploitation and use license;

b) License holders shall submit two sets of documents to the agency receiving the application via postal service, online submission, or direct submission; the agency receiving the documents shall be responsible for examining and checking the documents. If the documents are not valid, the agency shall return the documents within two working days along with a written explanation of the reasons;

c) Within a maximum of thirty working days from the date of receipt of valid documents as stipulated in point a of this clause, the agency receiving the documents shall organize the review of the documents for calculating fees for granting water resource exploitation rights and submit to the competent authority for approval of fees for granting water resource exploitation rights;

d) Within five working days from the date of receipt of the decision on approving fees for granting water resource exploitation rights as per Appendix V attached to this Decree, the agency receiving and reviewing the documents shall send a notification to the license holder and the local tax bureau where the project is located along with the decision on approving fees for granting water resource exploitation rights.

5. Where a permit was issued before this Decree takes effect without specifying the purpose of water use or with a specification that does not comply with the provisions of this Decree, the permit holder shall base on the actual exploitation and use of water from the declared facility to calculate the fee for the right to exploit water resources in accordance with the provisions of this Decree.

Article 19. Effective Date

1. This Decree takes effect from September 1, 2017.

2. The provisions at Article 40, Clause 3 of Article 47 of Decree No. 201/2013/NĐ-CP dated November 27, 2013 of the Government detailing certain articles of the Law on Water Resources are hereby abolished.

Article 20. Responsibility for Implementation

1. The Ministry of Natural Resources and Environment shall be responsible for guiding and implementing this Decree.

2. The Ministers, Heads of ministerial-level agencies, Heads of government-affiliated agencies, Chairpersons of provincial People's Committees under central cities, and related organizations and individuals are responsible for implementing this Decree./.

 

Văn bản gốc (PDF)

Mở PDF trong tab mới ↗

Bản đồ quan hệ

↑ Cơ sở & văn bản tác động lên văn bản này
Căn cứ 44
76/2015/QH13 Luật Tổ chức Chính phủ số 76/2015/QH13 Hết hiệu lực 69/2017/QĐ-UBND Quyết định số 69/2017/QĐ-UBND Bổ sung quy định phân cấp nguồn thu giữa các cấp chính quyền địa phương tỉnh Bình Định giai đoạn 2017-2020 Còn hiệu lực 126/2018/NQ-HĐND Nghị quyết số 126/2018/NQ-HĐND Ban hành tỷ lệ phần trăm (%) phân chia nguồn thu tiền cấp quyền khai thác tài nguyên nước giữa các cấp ngân sách địa phương giai đoạn 2018-2020 tỉnh Thanh Hóa Hết hiệu lực 85/2017/NQ-HĐND Nghị quyết số 85/2017/NQ-HĐND Bổ sung quy định phân cấp nguồn thu ngân sách nhà nước giữa các cấp chính quyền địa phương tỉnh Bình Định giai đoạn 2017 - 2020 Hết hiệu lực 148/2018/QĐ-UBND Quyết định số 148/2018/QĐ-UBND Sửa đổi, bổ sung một số điều của Quy định về phân cấp nguồn thu, nhiệm vụ chi của các cấp chính quyền địa phương và tỷ lệ phần trăm (%) phân chia các khoản thu giữa các cấp ngân sách giai đoạn 2017 - 2020 ban hành kèm theo Nghị quyết số 76/2016/NQ-HĐND ngày 25/11/2016 của Hội đồng nhân dân tỉnh Còn hiệu lực 66/2024/QĐ-UBND Quyết định số 66/2024/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2025 trên địa bàn tỉnh Vĩnh Phúc Hết hiệu lực 07/2024/QĐ-UBND Quyết định số 07/2024/QĐ-UBND Quy định Bảng giá tính thuế tài nguyên và Hệ số quy đổi một số loại tài nguyên trên địa bàn tỉnh Lâm Đồng Hết hiệu lực 01/2024/QĐ-UBND Quyết định số 01/2024/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2024 trên địa bàn tỉnh Đắk Nông Hết hiệu lực 37/2023/QĐ-UBND Quyết định số 37/2023/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2024 trên địa bàn tỉnh Cà Mau Hết hiệu lực 51/2023/QĐ-UBND Quyết định số 51/2023/QĐ-UBND Sửa đổi, bổ sung một số điều của Quy định quản lý tài nguyên nước trên địa bàn thành phố Hải Phòng ban hành kèm theo quyết định số 11/2017/QĐ-UBND ngày 11/9/2017 của UBND thành phố Hết hiệu lực 11/2022/QĐ-UBND Quyết định số 11/2022/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2022 trên địa bàn tỉnh Đắk Nông Hết hiệu lực 17/2021/QĐ-UBND Quyết định số 17/2021/QĐ-UBND Quy định giá tính thuế đối với tài nguyên trên địa bàn tỉnh Tiền Giang Hết hiệu lực 14/2021/QĐ-UBND Quyết định số 14/2021/QĐ-UBND Ban hành Quy định quản lý tài nguyên nước trên địa bàn tỉnh Tiền Giang Hết hiệu lực 29/2020/QĐ-UBND Quyết định số 29/2020/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2021 trên địa bàn tỉnh Cà Mau Hết hiệu lực 39/2019/QĐ-UBND Quyết định số 39/2019/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2020 trên địa bàn tỉnh Cà Mau Hết hiệu lực 38/2019/QĐ-UBND Quyết định số 38/2019/QĐ-UBND Ban hành Quy định một số nội dung quản lý nhà nước về tài nguyên nước trên địa bàn tỉnh Bắc Kạn Còn hiệu lực "38/2019/QĐ-UBND Quyết định số "38/2019/QĐ-UBND Ban hành Quy định một số nội dung quản lý nhà nước về tài nguyên nước trên địa bàn tỉnh Bắc Kạn Còn hiệu lực 21/2019/QĐ-UBND Quyết định số 21/2019/QĐ-UBND Ban hành Quy chế phối hợp quản lý nhà nước đối với tài nguyên nước trên địa bàn tỉnh Kon Tum Hết hiệu lực 19/2019/QĐ-UBND Quyết định số 19/2019/QĐ-UBND Ban hành Quy định về quản lý tài nguyên nước trên địa bàn tỉnh Trà Vinh Hết hiệu lực 37/2019/QĐ-UBND Quyết định số 37/2019/QĐ-UBND Về việc quy định giá tiêu thụ nước sạch sinh hoạt của Công ty cổ phần tư vấn đầu tư và xây dựng Lộc Phát Còn hiệu lực 36/2019/QĐ-UBND Quyết định số 36/2019/QĐ-UBND Về việc quy định giá tiêu thụ nước sạch sinh hoạt của Công ty cổ phần cấp nước và xây dựng Di Linh Hết hiệu lực 55/2018/QĐ-UBND Quyết định số 55/2018/QĐ-UBND Sửa đổi, bổ sung một số nội dug quy định tại Phụ lục 01, Phụ lục 02 ban hành kèm theo Quyết định số 58/2016/QĐ-UBND ngày 29/12/2016 của Ủy ban nhân dân tỉnh quy định phân cấp nguồn thu, nhiệm vụ chi các cấp ngân sách; Tỷ lệ phần trăm (%) phân chia nguồn thu giữa các cấp ngân sách giai đoạn 2017-2020; định mức phân bổ chi thường xuyên ngân sách địa phương năm 2017 Còn hiệu lực 04/2019/QĐ-UBND Quyết định số 04/2019/QĐ-UBND Ban hành Quy định quản lý tài nguyên nước trên địa bàn tỉnh Bình Dương Hết hiệu lực 35/2018/NQ-HĐND Nghị quyết số 35/2018/NQ-HĐND Về việc sửa đổi, bổ sung một số điều của Quy định về phân cấp nguồn thu, nhiệm vụ chi giữa ngân sách các cấp: Tỉnh, huyện, xã ổn định giai đoạn 2017-2020 ban hành kèm theo Nghị quyết số 53/2016/NQ-HĐND ngày 12/12/2016 của HĐND tỉnh Vĩnh Phúc Còn hiệu lực 57/2018/QĐ-UBND Quyết định số 57/2018/QĐ-UBND Sửa đổi, bổ sung một số điều của Quy định về quản lý tài nguyên nước trên địa bàn tỉnh Cà Mau ban hành kèm theo Quyết định số 31/2016/QĐ-UBND ngày 06 tháng 10 năm 2016 của Ủy ban nhân dân tỉnh Cà Mau Hết hiệu lực 37/2018/QĐ-UBND Quyết định số 37/2018/QĐ-UBND Ban hành Quy định quản lý tài nguyên nước trên địa bàn tỉnh Cao Bằng Còn hiệu lực 42/2018/NQ-HĐND Nghị quyết số 42/2018/NQ-HĐND Quy định tỷ lệ phân chia nguồn thu tiền cấp quyền khai thác tài nguyên nước cho các cấp ngân sách trên địa bàn tỉnh Kon Tum giai đoạn 2017 - 2020 Hết hiệu lực 33/2018/NQ-HĐND Nghị quyết số 33/2018/NQ-HĐND Sửa đổi, bổ sung một số nội dung của Quy định về phân cấp nguồn thu, tỷ lệ phần trăm từng nguồn thu, nhiệm vụ chi cho các cấp ngân sách trên địa bàn tỉnh giai đoạn 2017-2020 ban hành kèm theo Nghị quyết số 33/2016/NQ-HĐND ngày 08/12/2016 của Hội đồng nhân dân tỉnh Hà Nam Hết hiệu lực 41/2018/QĐ-UBND Quyết định số 41/2018/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2019 trên địa bàn tỉnh Cà Mau Hết hiệu lực 51/2018/QĐ-UBND Quyết định số 51/2018/QĐ-UBND Bãi bỏ Điều 35 của Quy định quản lý, khai thác, sử dụng tài nguyên nước và xả nước thải vào nguồn nước trên địa bàn tỉnh ban hành kèm theo Quyết định số 71/2014/QĐ-UBND ngày 26 tháng 11 năm 2014 của Ủy ban nhân dân tỉnh. Hết hiệu lực 12/2018/NQ-HĐND Nghị quyết số 12/2018/NQ-HĐND Quy định tỷ lệ phân chia nguồn thu cấp quyền khai thác tài nguyên nước cho các cấp ngân sách trên địa bàn tỉnh Còn hiệu lực 29/2018/QĐ-UBND Quyết định số 29/2018/QĐ-UBND Ban hành quy định sửa đổi, bổ sung một số điều của Quy định về phân cấp nguồn thu, nhiệm vụ chi của các cấp chính quyền địa phương và tỷ lệ phần trăm (%) phân chia các khoản thu giữa các cấp ngân sách giai đoạn 2017 - 2020 ban hành kèm theo Quyết định số 32/2016/QĐ-UBND ngày 30/12/2016 của UBND tỉnh Hết hiệu lực 148/2018/NQ-HĐND Nghị quyết số 148/2018/NQ-HĐND sửa đổi, bổ sung một số điều của Quy định về phân cấp nguồn thu, nhiệm vụ chi của các cấp chính quyền địa phương và tỷ lệ phần trăm (%) phân chia các khoản thu giữa các cấp ngân sách giai đoạn 2017 - 2020 ban hành kèm theo Nghị quyết số 76/2016/NQ-HĐND ngày 25/11/2016 của HĐND tỉnh Hết hiệu lực 14/2018/QĐ-UBND Quyết định số 14/2018/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2018 trên địa bàn tỉnh Cà Mau Hết hiệu lực 12/2017/NQ-HĐND Nghị quyết số 12/2017/NQ-HĐND Về việc quy định tỷ lệ phần trăm phân chia một số khoản thu giữa các cấp ngân sách thành phố Hà Nội. Hết hiệu lực 14/2023/QĐ-UBND Quyết định số 14/2023/QĐ-UBND Về việc Ban hành Bảng giá tính thuế tài nguyên năm 2023 trên địa bàn tỉnh Đắk Nông Hết hiệu lực 34/2022/QĐ-UBND Quyết định số 34/2022/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2023 trên địa bàn tỉnh Cà Mau Hết hiệu lực 49/2021/QĐ-UBND Quyết định số 49/2021/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2022 trên địa bàn tỉnh Cà Mau Hết hiệu lực 05/2021/QĐ-UBND Quyết định số 05 /2021/QĐ-UBND Sửa đổi, bổ sung Bảng giá tính thuế tài nguyên đối với một số loại tài nguyên trên địa bàn tỉnh Lâm Đồng ban hành kèm theo Quyết định số 48/2017/QĐ-UBND ngày 15 tháng 12 năm 2017 của Ủy ban nhân dân tỉnh Lâm Đồng quy định Bảng giá tính thuế tài nguyên và Hệ số quy đổi một số loại tài nguyên trên địa bàn tỉnh Lâm Đồng Còn hiệu lực 18/2018/NQ-HĐND Nghị quyết số 18/2018/NQ-HĐND Về việc bổ sung Khoản 13 Điều 4 tại Quy định phân cấp nguồn thu, nhiệm vụ chi và tỷ lệ phần trăm (%) phân chia các khoản thu giữa ngân sách các cấp chính quyền địa phương ban hành kèm theo Nghị quyết số 34/2016/NQ-HĐND ngày 14/12/2016 của Hội đồng nhân dân tỉnh Ninh Bình Hết hiệu lực 48/2017/QĐ-UBND Quyết định số 48/2017/QĐ-UBND Quy định Bảng giá tính thuế tài nguyên và Hệ số quy đổi một số loại taifnguyeen trên địa bàn tỉnh Lâm Đồng Còn hiệu lực 02/2018/QĐ-UBND Quyết định số 02/2018/QĐ-UBND Ban hành bảng giá tính thuế tài nguyên đối với nhóm loại tài nguyên có tính chất lý, hóa giống nhau trên địa bàn tỉnh Hà Giang Hết hiệu lực 04/2018/QĐ-UBND Quyết định số 04 /2018/QĐ-UBND Ban hành Quy định quản lý, bảo vệ, khai thác, sử dụng tài nguyên nước trên địa bàn tỉnh Hòa Bình Hết hiệu lực
Được dẫn chiếu bởi 8
37/2023/QĐ-UBND Quyết định số 37/2023/QĐ-UBND Ban hành Quy chế phối hợp xây dựng, duy trì hệ thống thông tin, chia sẻ, cung cấp thông tin, dữ liệu về nhà ở và thị trường bất động sản trên địa bàn tỉnh Vĩnh Phúc Hết hiệu lực 29/2020/QĐ-UBND Quyết định số 29/2020/QĐ-UBND Ban hành Quy định về việc quản lý hoạt động của xe ô tô vận tải trung chuyển hành khách trên địa bàn tỉnh Ninh Bình Còn hiệu lực 41/2018/QĐ-UBND Quyết định số 41/2018/QĐ-UBND Ban hành Bảng giá tính thuế tài nguyên năm 2019 tại tỉnh Yên Bái Hết hiệu lực 57/2018/QĐ-UBND Quyết định số 57/2018/QĐ-UBND Ban hành bộ "Đơn giá bồi thường các loại nhà cửa, vật kiến trúc, mô tả, tàu thuyền, máy móc thiết bị, nông cụ, ngư cụ, cây cối, hoa màu và nuôi trồng thủy hải sản" khi nhà nước thu hồi đất trên địa bàn tỉnh Hà Tĩnh Hết hiệu lực 14/2018/QĐ-UBND Quyết định số 14/2018/QĐ-UBND Ban hành Quy định cưỡng chế thực hiện quyết định giải quyết tranh chấp đất đai, quyết định công nhận hòa giải thành trong tranh chấp đất đai trên địa bàn tỉnh Trà Vinh Còn hiệu lực 04/2019/QĐ-UBND Quyết định số 04/2019/QĐ-UBND Về bãi bỏ Quyết định số 04/2012/QĐ-UBND ngày 18 tháng 9 năm 2012 của Ủy ban nhân dân quận Gò Vấp về ban hành quy chế tổ chức thực hiện và quản lý các dự án đầu tư mở rộng, nâng cấp hẻm trên địa bàn quận Gò Vấp theo phương thức “Nhà nước và Nhân dân cùng làm” Còn hiệu lực 34/2022/QĐ-UBND QUYẾT ĐỊNH SỐ 34/2022/QĐ-UBND QUY ĐỊNH CHỨC NĂNG, NHIỆM VỤ, QUYỀN HẠN VÀ CƠ CẤU TỔ CHỨC CỦA THANH TRA TỈNH NGHỆ AN Hết hiệu lực 49/2021/QĐ-UBND Quyết định số 49/2021/QĐ-UBND Bãi bỏ Quyết định số 58/2017/QĐ-UBND ngày 19/12/2017 của Uỷ ban nhân dân tỉnh về việc phê duyệt Quy hoạch phát triển Công nghiệp - Thương mại tỉnh Hà Nam đến năm 2025, tầm nhìn đến năm 2035 Còn hiệu lực
82/2017/NĐ-CP
Decree No. 82/2017/NĐ-CP stipulates the method of calculation, and the amount of fees for granting the right to exploit water resources.
Expired
↓ Văn bản chịu tác động từ văn bản này
Liên quan 29
39/2019/QĐ-UBND Quyết định số 39/2019/QĐ-UBND Về việc bãi bỏ văn bản Còn hiệu lực 19/2019/QĐ-UBND Quyết định số 19/2019/QĐ-UBND Sửa đổi, bổ sung một số nội dung của Quy định về mức bồi thường, hỗ trợ các loại cây trồng, vật nuôi là thủy sản, phần lăng, mộ và chi phí di chuyển trên địa bàn tỉnh Quảng Bình ban hành kèm theo Quyết định số 20/2018/QĐ-UBND ngày 28/8/2018 của UBND tỉnh Hết hiệu lực 55/2018/QĐ-UBND Quyết định số 55/2018/QĐ-UBND Bãi bỏ Quyết định số 53/2017/QĐ-UBND ngày 25 tháng 8 năm 2017 của Ủy ban nhân dân tỉnh An Giang Còn hiệu lực 42/2018/NQ-HĐND Nghị quyết số 42/2018/NQ-HĐND Sửa đổi, bổ sung Điều 2 của Nghị quyết số 51/2016/NQ-HĐND ngày 23/12/2016 của Hội đồng nhân dân tỉnh Yên Bái về ban hành một số loại phí, lệ phí trên địa bàn tỉnh Yên Bái thuộc thẩm quyền quyết định của Hội đồng nhân dân tỉnh Hết hiệu lực 48/2017/QĐ-UBND Quyết định số 48/2017/QĐ-UBND Ban hành Đơn giá Bồi thường nhà, vật kiến trúc, công trình xây dựng khác và di chuyển mồ mả khi Nhà nước thu hồi đất trên địa bàn tỉnh Hà Nam năm 2018 Hết hiệu lực 14/2021/QĐ-UBND Quyết định số 14/2021/QĐ-UBND Ban hành Quy định Phân công, phân cấp quản lý chất lượng, bảo trì công trình xây dựng và quản lý trật tự xây dựng trên địa bàn tỉnh Bắc Ninh Hết hiệu lực 07/2024/QĐ-UBND Quyết định số 07 /2024/QĐ-UBND Còn hiệu lực 148/2018/NQ-HĐND Nghị quyết số 148/2018/NQ-HĐND về việc Ban hành chính sách hỗ trợ doanh nghiệp nhỏ và vừa, doanh nghiệp khởi nghiệp đổi mới sáng tạo trên địa bàn tỉnh Quảng Ninh đến năm 2020 Hết hiệu lực 01/2024/QĐ-UBND Quyết định số 01/2024/QĐ-UBND Bãi bỏ văn bản quy phạm pháp luật do Ủy ban nhân dân Quận 9, quận Thủ Đức ban hành Còn hiệu lực 12/2017/NQ-HĐND Nghị quyết số 12/2017/NQ-HĐND Về tiếp tục nâng cao hiệu quả việc thực hiện Chương trình mục tiêu quốc gia giảm nghèo bền vững trên địa bàn tỉnh Nghệ An Hết hiệu lực 37/2019/QĐ-UBND Quyết định số 37/2019/QĐ-UBND Về việc bãi bỏ văn bản Còn hiệu lực 14/2023/QĐ-UBND Quyết định số 14/2023/QĐ-UBND về việc bãi bỏ Quyết định số 43/2016/QĐ-UBND ngày 01/11/2016 của UBND tỉnh Bắc Ninh về việc ban hành “Quy chế xét, cho phép sử dụng thẻ đi lại của doanh nhân APEC, thuộc thẩm quyền quản lý của Chủ tịch UBND tỉnh Bắc Ninh Còn hiệu lực 35/2018/NQ-HĐND Nghị quyết số 35/2018/NQ-HĐND Về Kế hoạch phát triển kinh tế - Xã hội năm 2019 Còn hiệu lực 51/2023/QĐ-UBND Quyết định số 51/2023/QĐ-UBND Hỗ trợ triển khai Chương trình mỗi xã một sản phẩm (Chương trình OCOP) trên địa bàn tỉnh Vĩnh Phúc đến năm 2025 Hết hiệu lực 51/2018/QĐ-UBND QUYẾT ĐỊNH SỐ 51/2018/QĐ-UBND BAN HÀNH QUY ĐỊNH QUẢN LÝ VÀ BẢO VỆ KẾT CẤU HẠ TẦNG GIAO THÔNG ĐƯỜNG BỘ ĐỐI VỚI ĐƯỜNG ĐỊA PHƯƠNG TRÊN ĐỊA BÀN TỈNH AN GIANG Hết hiệu lực 37/2018/QĐ-UBND Quyết định số 37/2018/QĐ-UBND Sửa đổi một số nội dung tại Quy định chế độ trợ giúp xã hội đối với các đối tượng bảo trợ xã hội trên địa bàn tỉnh Yên Bái ban hành kèm theo Quyết định số 44/2016/QĐ-UBND ngày 07/11/2016 của Ủy ban nhân dân tỉnh Yên Bái Hết hiệu lực 02/2018/QĐ-UBND Quyết định số 02/2018/QĐ-UBND Về việc ban hành quy chế tổ chức và hoạt động của Phòng Giáo dục và Đào tạo huyện Nhà Bè Hết hiệu lực 29/2018/QĐ-UBND Quyết định số 29/2018/QĐ-UBND Ban hành Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Sở Giáo dục và Đào tạo tỉnh Yên Bái Hết hiệu lực 12/2018/NQ-HĐND Nghị quyết số 12/2018/NQ-HĐND Xác nhận kết quả lấy phiếu tín nhiệm đối với người giữ chức vụ do Hội đồng nhân dân tỉnh bầu Còn hiệu lực 36/2019/QĐ-UBND Quyết định số 36/2019/QĐ-UBND Ban hành mức giá tối đa dịch vụ sử dụng đò tại các bến khách ngang sông trên địa bàn Thành phố Hồ Chí Minh Còn hiệu lực 17/2021/QĐ-UBND Quyết định số 17/2021/QĐ-UBND Quy định việc quản lý hoạt động của xe ô tô vận tải trung chuyển hành khách trên địa bàn tỉnh Kiên Giang Hết hiệu lực 18/2018/NQ-HĐND Nghị quyết số 18/2018/NQ-HĐND Quy định phí tham quan di tích lịch sử, danh lam thắng cảnh, công trình văn hóa và bảo tàng trên địa bàn tỉnh Bình Phước Hết hiệu lực 33/2018/NQ-HĐND Nghị quyết số 33/2018/NQ-HĐND Quy định chế độ bồi dưỡng đối với người làm nhiệm vụ tiếp công dân, xử lý đơn khiếu nại, tố cáo, kiến nghị, phản ánh trên địa bàn tỉnh Quảng trị Hết hiệu lực 38/2019/QĐ-UBND Quyết định số 38/2019/QĐ-UBND Phê duyệt đơn giá dịch vụ thu gom, vận chuyển và xử lý chất thải y tế nguy hại trên địa bàn tỉnh Thanh Hoá Còn hiệu lực 21/2019/QĐ-UBND Quyết định số 21/2019/QĐ-UBND Về việc quy định mức thu tiền sử dụng khu vực biển để khai thác, sử dụng tài nguyên biển trên địa bàn tỉnh Kiên Giang năm 2020 Hết hiệu lực 66/2024/QĐ-UBND Quyết định số 66/2024/QĐ-UBND Bãi bỏ các Quyết định của Uỷ ban nhân dân tỉnh Sơn La Còn hiệu lực 11/2022/QĐ-UBND Quyết định số 11/2022/QĐ-UBND Ban hành Quy chế về tổ chức và hoạt động của Phòng Kinh tế thuộc Ủy ban nhân dân huyện Nhà Bè Hết hiệu lực

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.