Circular No. 03/2013/TT-BGTVT amending and supplementing certain provisions of Circular No. 08/2012/TT-BGTVT dated March 23, 2012 guiding the implementation of some articles of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport.

Circular No. 03/2013/TT-BGTVT amends and supplements certain provisions of Circular No. 08/2012/TT-BGTVT on guiding the implementation of the Vietnam-Cambodia Waterway Transport Agreement. This document provides more detailed regulations on necessary documents for waterway transport activities as well as the duration for extending stay permits in Vietnam.

Số hiệu03/2013/TT-BGTVT
Loại văn bảnCircular
Cơ quan ban hànhMinistry of Construction
Người kýĐinh La Thăng — Bộ trưởng
Cập nhật19/06/2026
NgànhTransport
Lĩnh vựcInland Waterways
Ngày ban hành29/03/2013
Ngày áp dụng01/06/2013
Ngày hết hiệu lực
Tình trạngIn effect
✦ Tóm lược thông minh

Circular No. 03/2013/TT-BGTVT amends and supplements certain provisions of Circular No. 08/2012/TT-BGTVT on guiding the implementation of the Vietnam-Cambodia Waterway Transport Agreement. This document provides more detailed regulations on necessary documents for waterway transport activities as well as the duration for extending stay permits in Vietnam.

Đối tượng áp dụng

Inland Waterway Port Authority, owner of the waterway transport vessel, captain

Các điểm cốt lõi

  • The owner or captain must submit an application for extension of the Cambodian-Vietnamese Waterway Transport Permit with complete information about the vessel, crew, cargo, or passengers (Point b Clause 3 Article 10).
  • The Inland Waterway Port Authority is responsible for reviewing and issuing an extension permit to stay in Vietnam for a maximum period not exceeding thirty days upon receipt of all required documents (Point b Clause 3 Article 10).
  • A copy of the Certificate of Civil Liability Insurance for the operator of flammable and explosive goods transport and a copy of the Compulsory Civil Liability Insurance Certificate for passenger transport operators must be submitted (Point d Clause 2 Article 6).
  • The waterway routes specified in Cambodia and Vietnam are updated in Appendix I.

🌐 Tác động xã hội từ văn bản này

  • Strengthen management of waterway transport activities between Vietnam and Cambodia to ensure safety for people and goods.
  • Specific regulations on the extension period of stay permits help owners plan more clearly.

❓ Câu hỏi thường gặp

What is the maximum time allowed for extending stay in Vietnam?

The maximum time does not exceed thirty days (Point b Clause 3 Article 10).

Which agency is responsible for reviewing and issuing extended stay permits in Vietnam?

The Inland Waterway Port Authority where the vessel requests to stay (Point b Clause 3 Article 10).

What types of documents need to be submitted when applying for an extension of the transport permit?

Submit an application for extension with complete information about the vessel, crew, cargo, or passengers (Point b Clause 3 Article 10).

How are the waterway routes specified in Cambodia and Vietnam updated?

Updated in Appendix I of the Circular.

Toàn văn

MINISTRY OF TRANSPORTATION

SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness

Number: 03/2013/TT-BGTVT
Hanoi, March 29, 2013

CIRCULAR

Amending and supplementing certain articles of Circular No. 08/2012/TT-BGTVT dated March 23, 2012 guiding the implementation of certain provisions of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport. guiding the implementation of certain provisions of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport. Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport.

_______________

Pursuant to the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport signed on December 17, 2009, which became fully effective from January 20, 2011;

Pursuant to Decree No. 107/2012/NĐ-CP dated December 20, 2012 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Transport.

At the proposal of the Director of the Department of International Cooperation and the Director General of the Directorate of Inland Waterways of Vietnam,

The Minister of Transport issues this Circular amending and supplementing certain articles of Circular No. 08/2012/TT-BGTVT dated March 23, 2012 guiding the implementation of certain provisions of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport.

Article 1. Amending and supplementing certain articles of Circular No. 08/2012/TT-BGTVT dated March 23, 2012 guiding the implementation of certain provisions of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport.

1. The name of the Circular is amended as follows:

"Circular No. 08/2012/TT-BGTVT dated March 23, 2012 guiding the implementation of certain provisions of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport."

2. Point d Clause 2 Article 6 is amended and supplemented as follows:

"d) A copy of the Certificate of Civil Liability Insurance for the person operating the transport of flammable and explosive goods; a copy of the Compulsory Civil Liability Insurance Certificate for the person operating passenger transport."

3. Point b Clause 3 Article 10 is amended and supplemented as follows:

"b) After receiving the application for extension of the Cambodian-Vietnamese Inland Waterway Transport Permit from the owner of the vessel or the captain with complete information about the vessel, crew, cargo, or passengers, date of entry into Vietnam, incident details, and requested stay period in Vietnam, within one working day from the date of receipt of all required documents, the Inland Waterway Port Authority where the vessel requests to stay will conduct an inspection of the actual situation and issue a document allowing the vessel to stay in Vietnam for a maximum of thirty days; if the extension is not granted, a written response must be provided within twenty-four hours from the time of receipt of all required documents, stating the reasons."

4. Appendix I is amended and supplemented as follows:

a. Inland waterway routes specified in Cambodia:

1c

Mekong River

From Phnom Penh to Vinh Xuong - Thuong Phuoc/Kaom Samnor Border Gate

102

b. Inland waterway routes specified in Vietnam

Sculpture

Mekong River (Prey Nokor River)

From Vinh Xuong - Thuong Phuoc /Kaom Samnor Border Gate to Tan Chau Branch Confluence

12.3

Article 2. Effective Date

1. The Director of the General Department of Standardization, Metrology and Quality Control is responsible for guiding and organizing the implementation of this Circular.

Article 3. Implementation Organization

The Head of the Office of the Ministry, the Inspector General of the Ministry, the Heads of Departments under the Ministry, the Director General of the Directorate of Inland Waterways of Vietnam, the Directors of Provincial Departments of Transport, relevant agencies, organizations, and individuals are responsible for implementing this Circular.

 

THE MINISTER
(Signed)
Ding La Thang
Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.

Bản đồ quan hệ

03/2013/TT-BGTVT
Circular No. 03/2013/TT-BGTVT amending and supplementing certain provisions of Circular No. 08/2012/TT-BGTVT dated March 23, 2012 guiding the implementation of some articles of the Agreement between the Government of the Socialist Republic of Vietnam and the Royal Government of Cambodia on inland waterway transport.
In effect

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.