This Circular specifies the method for evaluating and scoring acceptance of regular maintenance work for inland waterway projects. Evaluation is based on the defined quality criteria, ranging from 100% to 0%, depending on the fulfillment of requirements for each project component.
Đối tượng áp dụng
Units or contractors performing regular maintenance of inland waterway projects
Các điểm cốt lõi
- Fulfilling all specified quality criteria requirements will achieve the maximum number of points for the project component.
- Having between 2-5% non-compliance signals that have not been rectified within three days after inspection and acceptance will result in corresponding point deductions.
- If more than 30% non-compliance signals exist or if the unit does not implement and provide proof of results, the project component will be scored zero points.
- Evaluation is based on the number of non-compliance criteria within each project component.
- Appendix 1 details the quality criteria for each project component.
- Appendix 2 specifies the evaluation methods and specific scoring procedures.
🌐 Tác động xã hội từ văn bản này
- Ensuring the quality of regular maintenance work for inland waterway projects
- Creating a basis for inspecting and monitoring the effectiveness of units or contractors
❓ Câu hỏi thường gặp
If there are between 2-5% non-compliance signals, how many points will the project component be scored?
The project component will be deducted 15% of the maximum points for the project component.
Which entity is responsible for inspecting and accepting regular maintenance work for inland waterway projects?
This Circular does not specify specifically but it could be the project sponsor or the sponsor's representative or the supervisory consultant (if any).
Toàn văn
|
MINISTRY OF TRANSPORTATION Number: 08/2019/TT-BGTVT |
SOCIALIST REPUBLIC OF VIET NAM Hanoi, February 28, 2019 |
CIRCULAR
Regulations on criteria for monitoring and acceptance of maintenance results of inland waterway transport infrastructure assets based on quality implementation
infrastructure for inland waterway transportation based on the quality of implementation
Pursuant to the Law on Inland Waterway Traffic dated June 15, 2004, and the Law Amending and Supplementing Certain Provisions of the Law on Inland Waterway Traffic dated June 17, 2014;
Pursuant to Decree No. 46/2015/NĐ-CP dated May 12, 2015 of the Government on management of construction project quality and maintenance;
Pursuant to Decree No. 45/2018/NĐ-CP dated March 13, 2018, issued by the Government, stipulating the management, use, and operation of infrastructure assets for inland waterway transport;
Pursuant to Decree No. 12/2017/NĐ-CP dated February 10, 2017, issued by the Government on the functions, tasks, powers, and organizational structure of the Ministry of Transport;
At the proposal of the Director of the Infrastructure Department and the Director of the Vietnam Inland Waterway Administration;
Article 2. This Circular does not apply to periodic repair work, emergency repair work of waterway infrastructure assets within inland waterways.
Article 1. Scope of Regulation
These Circulars stipulate the criteria for monitoring and acceptance of maintenance results of inland waterway transport infrastructure assets based on quality implementation for regular maintenance work of inland waterway projects (excluding traffic control operations to ensure safety of inland waterway transport).
Article 2. Applicability
These Circulars apply to agencies, organizations, and individuals related to regular maintenance work of inland waterway projects based on quality implementation (excluding traffic control operations to ensure safety of inland waterway transport).
Article 3. Explanation of Terms
In this Circular, the following terms are understood as follows:
1. Regular maintenance of inland waterway projects refers to activities aimed at maintaining normal operation and safety of the projects during exploitation, including regular maintenance of inland waterways, navigation channel protection zones, and inland waterway navigation aids.
2. The unit or contractor performing regular maintenance of inland waterway projects is an organization selected by the investor to carry out regular maintenance work of inland waterway projects in accordance with the provisions of the law.
3. Navigation aid adjustment operations involve adjusting navigation aids along the route in response to changes in the channel. Such operations include: mooring, unmooring, adjusting, and preventing siltation of buoys; adjusting and moving navigation aid poles; moving signboards and lights indicating lock chambers.
Article 4. Criteria for monitoring and acceptance of regular maintenance work of inland waterway projects based on quality implementation
1. Regular maintenance work of inland waterway projects shall be carried out in accordance with the standards for regular maintenance of inland waterways.
2. Criteria for monitoring and acceptance of regular maintenance work of inland waterway projects based on quality implementation are specified in Appendix 1 attached hereto.
3. The investor or their representative shall base on the approved maintenance plan and budget and the provisions of Clause 1 and Clause 2 of this Article to prepare tender documents, request documents, procurement documents, conclude contracts, evaluate, accept and settle payments when implementing contracts based on quality implementation.
Article 5. Method for evaluating regular maintenance work of inland waterway projects based on quality implementation
1. Evaluation of regular maintenance work of inland waterway projects based on quality implementation shall be conducted using a scoring method with a total score of 100 points (corresponding to 100%), including items of work or certain items of work as prescribed in Appendix 1 attached hereto.
2. The maximum score structure for each item of work shall be calculated as a percentage of the estimated cost value or the total bid price of that criterion over the total estimated budget for regular maintenance work of inland waterway projects (rounded to the nearest whole number).
3. The cost of each item of work shall be evenly distributed among the months serving as the basis for evaluation during inspection and acceptance, and deducted from the budget.
Article 6. Inspection, supervision, evaluation, and acceptance of regular maintenance work for inland waterway projects based on the quality of implementation and deduction of funds
1. Evaluation of the quality of regular maintenance work for inland waterway projects shall be based on the results of on-site inspection, supervision, and the implementation records and documents of the unit or contractor, including:
a) Administrative work: inspection and supervision of record-keeping, storage, and updating of data in files, documents, computer software, and reporting systems during the implementation of regular maintenance work for inland waterway projects at units;
b) On-site work: inspection, supervision, and evaluation according to the criteria for regular maintenance work for inland waterway projects at the site;
c) The evaluation and acceptance shall be based on the results of the unit or contractor implementing regular maintenance work for inland waterway projects through spot checks and periodic inspections as stipulated in points a and b of this clause;
d) Determining the score for regular maintenance work for inland waterway projects shall be based on the assessment of individual items of work against each quality criterion as prescribed in Appendix 2 issued together with this Circular.
2. Inspection and acceptance components
a) For spot checks or monthly periodic inspections and acceptance: the project owner or their representative or supervising consultant (if any), and the unit or contractor implementing regular maintenance work for inland waterway projects;
b) For phase (quarterly) or final inspections and acceptance: the project owner or their representative, supervising consultant (if any), and the unit or contractor implementing regular maintenance work for inland waterway projects.
3. Time for inspection and acceptance:
a) Monthly periodic inspection and acceptance: shall be organized from the 1st to the 5th day of the month immediately following the month being accepted. For the last month of the year, it shall be organized from December 25 to December 31 of the same year;
b) Quarterly inspection and acceptance: shall be organized from the 1st to the 5th day of the first month of the quarter immediately following the quarter being accepted. For the fourth quarter, it shall be organized from December 25 to December 31 of the same year. Quarterly acceptance is a summary of the acceptance results of the months within that quarter;
c) Final inspection and acceptance: shall be organized from December 25 to December 31 of the year. Final acceptance is a summary of the quarterly acceptance results throughout the year as the basis for final acceptance;
d) Spot check: shall be organized at any time during the month; spot check serves as the basis for evaluating monthly acceptance.
4. Items of work of the unit or contractor not accepted quarterly and deduction of implementation costs according to the provisions of the law and in the following cases:
a. Two consecutive months in the quarter evaluated under the provisions of Clause 2 and Clause 3 of Appendix 2 of this Circular;
b. Two months in the quarter evaluated under the provisions of Clause 4 and Clause 5 of Appendix 2 of this Circular;
c. One month in the quarter evaluated under the provisions of Clause 6 of Appendix 2 of this Circular.
Article 7. Effective Date
This Circular shall take effect from June 1, 2019.
Article 8. Implementation organization
1. The Vietnam Inland Waterways Administration shall organize the implementation and inspection of the implementation of this Circular. During the implementation process, if there are difficulties or obstacles, they must promptly report to the Ministry of Transport for consideration and resolution.
2. The Director of the Ministry's Office, the Inspector General of the Ministry, the Heads of Departments, the Director of the Vietnam Inland Waterways Administration, the Heads of agencies, organizations, and individuals related to this Circular shall be responsible for its enforcement.
|
Place of Receipt: - As Article 8; - The Office of Administrative Procedure Control (Government Office); |
DEPUTY MINISTER DEPUTY MINISTER Nguyen Nhat |
Respectfully submitted to: The State Bank of Vietnam Branch in the Region ...
Criteria for Acceptance Quality of Regular Maintenance Workfor Inland Waterway Projects
(Annexed to Circular No. /2019/TT-BGTVT dated month day year 2019 of the Minister of Transport)
|
Serial number |
Item task |
Quality Criteria |
Requirements for Implementation Time |
|
1 |
Route Inspection (including routine route inspection and night signal light inspection) |
Update, record, and store files as required. |
|
|
Timely report and handle actual channel changes |
|||
|
Record images of route inspection showing changes and new occurrences (signal positions, obstructions, shoals, channel conditions, vessel parking, maintenance of signals) |
|||
|
Weekly and monthly reports reflect issues to relevant authorities for timely handling if illegal constructions, vessels parked in violation, or encroachments on the protected waterway area occur |
|||
|
Provide comprehensive and timely reports and propose solutions if there are constructions not listed in the maintenance plan without proper signaling or signaling that does not meet color, function, or situation requirements for the channel |
|||
|
Report and propose solutions if construction activities (construction, removal of obstructions, resource exploitation, other underwater activities) affecting waterway traffic safety occur |
|||
|
2 |
Conduct spot checks after natural disasters, inspect transportation infrastructure, and participate in accident handling |
Have documentation proving immediate inspection after natural disasters or accidents or inspections of transportation infrastructure related to waterway traffic as required |
|
|
Have plans for prompt handling and reporting |
|||
|
Maintain records at the unit regarding flood prevention and search and rescue operations in the field of inland waterways |
|||
|
Update inspection result files and fully comply with the requirements of competent authorities regarding cooperation during the handling and reporting process related to projects, accidents, and signaling |
|||
|
3 |
Ensure traffic flow |
Assign personnel shifts, record, and update information comprehensively |
|
|
Store files and maintain regular reporting as required |
|||
|
No accidents caused by the subjective fault of the unit or contractor implementing regular maintenance work for inland waterway projects occur on the route |
|||
|
Take immediate measures to ensure traffic safety when accidents occur on the route within the scope of regular maintenance work for inland waterway projects |
|||
|
Report promptly to the competent authority and the project investor, supervising consultant (if any) immediately after a traffic accident occurs in accordance with regulations on organizing search and rescue operations for inland waterway traffic accidents. |
|||
|
4 |
Read water levels |
Update, record fully, store system management software through measuring devices |
|
|
Draw water level trend charts (the relationship between water level height (H) with time corresponding to each water level height (t)) monthly, annually as prescribedlCompile data, report in accordance with the standard maintenance regulation for inland waterways, simultaneously report daily and hourly water levels on the electronic portal of the inland waterway management agency as prescribed |
|||
|
Count transportation vessels |
|||
|
5 |
Store vessel data (quantity, tonnage) fully documented, on computers through daily updates and reports on the electronic portal of the inland waterway transport management agency according to the standard maintenance regulation for inland waterways regarding counting time |
Statistics, analyze, prepare reports according to the standard maintenance regulation for inland waterways |
|
|
Draw transportation volume charts |
|||
|
Report monthly, annually fully on transportation vessels |
|||
|
Standby for natural disaster prevention |
|||
|
6 |
Update damage information fully during the course of natural disasters and grasp timely plans for natural disaster prevention along the route |
Have a duty roster, organize full standby according to regulations on natural disaster prevention work in the field of inland waterways |
|
|
Deploy rescue forces and equipment when necessary and take prompt rescue measures when natural disasters occur |
|||
|
Ensure uninterrupted communication during the period of natural disasters |
|||
|
Standby for information technology handling |
|||
|
7 |
Update data promptly, fully for all tasks in regular maintenance work of inland waterway projects as prescribed |
Assign, organize full standby to serve the timely, full update and monitoring |
|
|
Summarize, report data trends during the shift |
|||
|
Notify, resolve, propose solutions for situations arising during regular maintenance and monitoring equipment |
|||
|
Coordinate with local authorities and communicate to protect transportation infrastructure |
|||
|
8 |
Have a work log or duty book confirmed by local authorities or relevant agencies in coordination work on: |
Propaganda, dissemination of laws and regulations on inland waterway transport
|
|
|
9 |
Signal appropriately according to approved plans, signal consistent with channel conditions, unexpected situations occurring on channels |
Immediately during the inspection process or not more than two days upon discovering signal position changes, tilting, incorrect channel conditions, damage, loss, or need for new installation |
Signal specifications, dimensions meet requirements according to river type or approved plans |
|
Signals installed correctly at positions, technical requirements of inland waterways for signals (signal observation direction according to channel characteristics, channel conditions; signals straight, not tilted) |
|||
|
Management files at the unit are complete, report, update new signal positions on route diagrams, management software as prescribed |
|||
|
Signal visibility is not obstructed (including clearing around signals), signal effectiveness at installation locations meets technical standards |
|||
|
Maintain, paint signals, and minor repairs to signals |
|||
|
10 |
Signal visibility, color clear, not rusted, comply with national technical standards for inland waterway signaling in Vietnam |
Immediately during the inspection process or not more than three days upon discovering signal quality does not meet structural, color standards according to national technical standards for inland waterway signaling in Vietnam |
Writing must be clear, sharp according to national technical standards for inland waterway signaling in Vietnam and regulations on installing kilometer markers - place names and recording symbols, serial numbers on inland waterway signals |
|
Stripes between alternating colors must comply with regulations for each color, not touching other colors according to coating layer distance regulations or parts that should not be painted |
|||
|
Signal serial numbers correct according to numbering regulations |
|||
|
Securely connect joints, between sign posts, not cracked or small repair areas painted fully according to procedures |
|||
|
Electrical signaling |
|||
|
11 |
Fully arranged along the route according to approved plans; signal positions appropriate according to channel conditions |
Immediately during the inspection process or not more than one day to supplement, repair, or replace from the moment lights are found not lit or signal modes do not comply with regulations on signal meanings, effects |
For signaling lights still within warranty period, not more than twelve hours must report to the project investor or supervising consultant (if any) to promptly address the issue Light, signal visibility comply with national technical standards for inland waterway signaling in Vietnam |
|
Signal modes comply with national technical standards for inland waterway signaling in Vietnam |
|||
|
Electrical signals equipped with positioning devices, cameras ensure smooth transmission to the management center |
|||
|
Protective lenses, solar panels (if any) must be clean of oil, dust |
|||
|
Conduct preliminary surveys of shallow areas |
|||
|
12 |
Update, store management files for channels or newly appearing shallow areas surveyed and addressed promptly |
Can be combined with routine or sudden inspections, not more than two days to inspect, survey, implement temporary signaling (if needed) and report to the project investor or direct management agency |
Have drawings showing bottom depth, channel width, shallow areas, sizes of shallow areas on the channel, longitudinal and transverse profiles, water levels at the time of measurement; terrain features according to standard maintenance regulations for inland waterways |
|
Update water depth in channel reports and software on the electronic portal of the inland waterway management agency weekly |
|||
|
Provide explanations, reports, propose solutions to the project investor or their representative or supervising consultant (if any) within the prescribed timeframe |
|||
|
There shall be a description, report, and proposal of solutions from the project sponsor or their representative, or the supervising consultant (if any), within the prescribed time limit |
|||
|
13 |
Floating debris forming large clusters in the waterway |
Smooth traffic flow or timely clearance of garbage, wood logs, vegetable rafts, duckweed... forming clusters affecting inland waterway traffic |
Clearance must be completed within no more than three days |
|
For large clusters covering the entire channel: - Timely report and proposed solutions to the project owner or their representative or supervising consultant; - Properly arrange temporary signals or direct traffic in combination with signaling as required by the competent authority. |
- Temporary signals must be arranged within no more than one day and a report with proposed solutions must be submitted. |
DIRECTOR OF THE STATE BANK OF VIETNAM
Method for evaluating and scoring routine maintenance work on inland waterway projectsThe score for management tasks in routine maintenance is based on the evaluation of work items according to quality criteria, specifically using the following assessment methods:
(Annexed to Circular No. /2019/TT-BGTVT dated month day year 2019 of the Minister of Transport)
1. The score is 100% of the maximum points for the work item in the following cases:
a) Fully meeting all quality criteria as stipulated in this Circular;
b) For work items involving signal operations or maintenance, painting of signals, minor repairs to signals or electrical signals: less than 2% of the total evaluated signals do not meet requirements or fall under the circumstances specified in point b of Clauses 2, 3, 4 and Clause 5 of the Appendix, and the unit or contractor has completed corrective repairs and improvements within three days from the date of inspection and acceptance, confirmed by the project owner or their representative or supervising consultant (if applicable).
2. The score is 95% of the maximum points for the work item in the following cases:
a) One criterion of the work item does not meet requirements;
b) For work items involving signal operations or maintenance, painting of signals, minor repairs to signals or electrical signals: between 2% and 5% of the total evaluated signals do not meet requirements and have not been fully corrected and repaired within three days from the date of inspection and acceptance, except for the case specified in point a of this clause.
3. The score is 85% of the maximum points for the work item in the following cases:
a) Two criteria of the work item do not meet requirements;
b) For work items involving signal operations or maintenance, painting of signals, minor repairs to signals or electrical signals: two criteria of the work item do not meet requirements, including between 2% and 5% of the total evaluated signals do not meet requirements and have not been fully corrected and repaired by the unit or contractor within three days from the date of inspection and acceptance.
4. The score is 70% of the maximum points for the work item in the following cases:
a) Three or more criteria of the work item do not meet requirements;
b) For work items involving signal operations or maintenance, painting of signals, minor repairs to signals or electrical signals: three criteria of the work item do not meet requirements, including between 2% and 5% of the total evaluated signals do not meet requirements and have not been fully corrected and repaired by the unit or contractor within three days from the date of inspection and acceptance.
5. For work items involving signal operations or maintenance, painting of signals, minor repairs to signals or electrical signals: between 5% and 30% of the total evaluated signals do not meet requirements and have not been fully corrected and repaired by the unit or contractor within three days from the date of inspection and acceptance, the score corresponds to the percentage of non-compliant signals.
6. The score is "0" points in the following cases:
a) The unit does not perform and does not provide documentation proving the results of performance;
b) For work items involving signal operations or maintenance, painting of signals, minor repairs to signals or electrical signals: three criteria of the work item do not meet requirements, including more than 30% of the total evaluated signals do not meet requirements.
b) For works items that involve signaling operations or maintenance, painting of signals, minor signal repairs, or electrical signaling: there are three criteria for the work item that fail to meet requirements, including more than 30% of signals failing to meet requirements out of the total number of signals.
Tải văn bản
Văn bản này đang được cập nhật văn bản gốc, vui lòng xem nội dung toàn văn và kiểm tra lại sau.
Bản đồ quan hệ
Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.
Bản dịch
Văn bản này có sẵn ở các ngôn ngữ sau: