Circular No. 09/2014/TT-BXD amending and supplementing some articles in the Circulars guiding the Government's Decree No. 15/2013/NĐ-CP dated February 6, 2013 on Construction Quality Management.

Circular No. 09/2014/TT-BXD amends and supplements some articles in the Circulars guiding the Decree on Construction Quality Management. This document provides detailed regulations on construction quality management, project classification, and design review.

文号09/2014/TT-BXD
文件类型Circular
发布机关Ministry of Construction
签署人Cao Lại Quang — Thứ trưởng
更新24/06/2026
行业Construction
领域State Inspection of Construction Quality
发布日期10/07/2014
生效日期01/09/2014
失效日期
状态In effect
✦ 智能摘要

Circular No. 09/2014/TT-BXD amends and supplements some articles in the Circulars guiding the Decree on Construction Quality Management. This document provides detailed regulations on construction quality management, project classification, and design review.

适用范围

Construction-related specialized agencies, project sponsors, project management boards, Departments of Industry and Trade, People's Committees of provinces/cities, State Construction Quality Supervision Agency, State Construction Activity Management Agency.

要点

  • The legal representative of the project sponsor may delegate authority to the project management board in cases where they directly manage the project or hire a consulting firm to perform certain tasks specified in Clause 1 of this Article, except for the approval of construction design tasks.
  • Costs for inspecting the acceptance work to put the construction project into use shall be included in the total investment cost of the construction project, including inspection costs of construction-related specialized agencies, costs for hiring individuals (experts), costs for hiring public institutions, organizations with professional capabilities.
  • The state management agency for construction does not conduct inspections of the acceptance work to put construction projects into operation if such projects have been inspected and accepted by the National Acceptance Council for Construction Projects.
  • Civil and industrial projects are classified according to specific criteria such as number of floors, capacity, total business area, height, total power, voltage, solid waste volume, cemetery area, road speed, rural road type.
  • Construction-related specialized agencies shall review Class I, II, and III projects under the responsibility of the Ministry of Industry and Trade and Departments of Industry and Trade.

🌐 本文件的社会影响

  • Positive impact: Clear regulations on project classification help project sponsors and management agencies easily determine responsibilities and implementation procedures.
  • Negative impact: It may cause difficulties for projects requiring opinions from multiple reviewing agencies, thereby prolonging the approval process.
  • Benefit: Reducing costs for inspecting the acceptance work to put construction projects into use.
  • Cost: Increasing management and supervision costs for large projects.

❓ 常见问题

In what circumstances can the legal representative of the project sponsor delegate authority to the project management board?

The legal representative of the project sponsor may delegate authority to the project management board in cases where they directly manage the project or hire a consulting firm to perform certain tasks specified in Clause 1 of this Article, except for the approval of construction design tasks.

How are costs for inspecting the acceptance work to put construction projects into use calculated?

Costs for inspecting the acceptance work to put construction projects into use shall be included in the total investment cost of the construction project, including inspection costs of construction-related specialized agencies, costs for hiring individuals (experts), costs for hiring public institutions, organizations with professional capabilities.

For which construction projects does the state management agency for construction not conduct inspections of the acceptance work?

The state management agency for construction does not conduct inspections of the acceptance work to put construction projects into operation if such projects have been inspected and accepted by the National Acceptance Council for Construction Projects.

Which projects fall under the responsibility of the Department of Industry and Trade for review?

The Department of Industry and Trade reviews Class III and Class II projects of types: power transmission lines and substations, hydroelectric power plants, thermal power plants, metallurgical plants, aluminum production plants.

Which projects are determined according to the Investment Decision?

For construction projects decided to invest before the effective date of this Circular, the project level of the project shall be determined according to the Investment Decision.

全文

MINISTRY OF CONSTRUCTION

SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness

Number: 09/2014/TT-BXD
Hanoi, July 10, 2014

CIRCULAR

Amending and supplementing certain articles in Circulars guiding Decreenumber

15/2013/NĐ-CP dated February 6, 2013 of the Government

for Management of Construction Quality

___________________

Pursuant to Decree No. 62/2013/NĐ-CP dated June 25, 2013 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Construction;

Pursuant to Decree No. 15/2013/NĐ-CP dated February 6, 2013 of the Government on Quality Management of Construction Projects;

Pursuant to Decree No. 12/2009/NĐ-CP dated February 12, 2009 of the Government on Project Management for Investment in Construction Works; and Decree No. 83/2009/NĐ-CP dated October 15, 2009 of the Government amending and supplementing certain articles of Decree No. 12/2009/NĐ-CP dated February 12, 2009 of the Government on Project Management for Investment in Construction Works;

Considering the proposal of the Director of the National Construction Quality Supervision Agency and the Director of the Construction Activity Management Agency;

The Minister of Construction issues this Circular amending and supplementing certain articles in Circular No. 10/2013/TT-BXD dated July 25, 2013 detailing certain contents regarding quality management of construction projects, Circular No. 12/2013/TT-BXD dated July 31, 2013 detailing the organization of awards for construction project quality, and Circular No. 13/2013/TT-BXD dated August 15, 2013 detailing the review, examination, and approval of construction design by the Ministry of Construction,

Article 1. Amending and supplementing Circular No.10/2013/TT-BXD dated July 25, 2013

1. Amending Clause 2, Article 2 as follows:

“2. The legal representative of the investor may delegate authority to the project management board in cases where the project is directly managed by the board or to a project management consultant in cases where a project management consultant is hired to perform one or more of the tasks specified in Clause 1 of this Article, except for the task of approving the design assignment for construction works.”

2. Amending and supplementing Clause 7, Article 24 as follows:

“7. Costs for inspecting the acceptance work to put construction works into operation shall be included in the total investment cost of construction works, including costs for inspection by construction-related agencies, costs for hiring individuals (experts), and costs for hiring public institutions or organizations with appropriate expertise to conduct inspections of the acceptance work to put construction works into operation when required by construction-related agencies according to Clause 6 of this Article. Inspection costs for the acceptance work to put construction works into operation shall be defined as follows:

a) Inspection costs of construction-related agencies according to the regulations on travel expenses of the Ministry of Finance, including travel costs, lodging allowances, accommodation costs, and other costs serving the inspection work;

b) Costs for hiring experts by construction-related agencies, including travel costs, accommodation costs, and expert fees;

c) Costs for hiring public institutions or organizations to conduct inspections of the acceptance work to put construction works into operation shall be budgeted based on the volume of work performed according to the requirements of construction-related agencies and the regulations on the preparation and management of investment costs;

d) Construction-related agencies shall prepare estimated inspection costs according to current regulations, including costs specified in Points a and b of this Clause. Estimated inspection costs serve as the basis for investors to settle actual costs incurred by construction-related agencies during the inspection process.”

3. Amending Point a and Point b, Clause 2, Article 25 as follows:

“2. Construction-related agencies under the Ministry of Industry and Trade shall inspect the following works:

a) Class I and above works regardless of funding sources, including power transmission lines and substations, hydropower plants, thermal power plants, metallurgical plants, aluminum production plants, oil refining plants, gas processing plants, warehouses, and pipelines (for gasoline, diesel, liquefied petroleum gas);

b) Class II and III works of power transmission lines and substations, hydropower plants, thermal power plants, metallurgical plants, and aluminum production plants within investment projects decided by the Minister of Industry and Trade.”

4. Amending Point b, Clause 6, Article 25 as follows:

“b) Department of Industry and Trade:

- Class III and II works of power transmission lines and substations, hydropower plants, thermal power plants, metallurgical plants, and aluminum production plants, excluding works specified in Point b, Clause 2 of this Article.

- Class IV, III, and II works of oil refining plants, gas processing plants, warehouses, and pipelines (for gasoline, diesel, liquefied petroleum gas), chemical product storage plants, and industrial explosives storage plants, excluding works specified in Point c, Clause 2 of this Article.”

5. Supplementing Clause 10, Article 25 as follows:

“10. State management agencies for construction shall not conduct inspections of the acceptance work to put construction works into operation for works that have been inspected and accepted by the State Acceptance Committee for Construction Works.”

6. Amending and supplementing the classification of works in Appendix I

a) Amending Item I.1.1.2. Single-family houses underI.1.1 HousinginTable I.1 Classification of Civil Works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Work

Special

I

II

III

IV

I.1.1

Housing

I.1.1.2. Single-family houses(villa not less than Class III)

Number of floors

-

-

> 7

≤ 7

-

b) Supplementing Point d, Item I.1.2.3. Sports facilities: stadiums, training halls, and other sports facilities underSection I.1.2 Public works Industry and Table I.1 Classification of Civil Works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

I.1.2

Public works

I.1.2.3 Sports facilities: stadiums, gymnasiums, training centers, and other sports facilities

d) Water sports facilities(National sports facilities not less than Class I)

Capacity (thousand seats)

International standard competition swimming pool, capacity > 7.5

Competition swimming pool, capacity 5 ÷ 7.5

Competition swimming pool, capacity 2 ÷ <5

Competition swimming pool, capacity <2

Swimming pool for recreational sports

c) Amend Point d Clause I.1.2.5 Commercial and service facilities under SectionI.1.2 Public works Industry and Table I.1 Classification of Civil Works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

I.1.2

Public works

I.1.2.3 Commercial and service facilities

d) Stores, restaurants, refreshment establishments, and other commercial and service facilities.

Total business area (thousand square meters)2)

-

> 3

0,5 ÷ 3

< 0,5

-

d) Amend Point a Clause I.1.2.6 Information and communication facilities under SectionI.1.2 Public works Industry and Table I.1 Classification of Civil Works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

I.1.2

Public works

I.1.2.6 Information and communication facilities

a) Telecommunication tower, broadcasting and television transmission tower, BTS mast

Height (m)

≥ 200

100 ÷ <200

50 ÷ <100

35 ÷ <50

< 35

đ) Amend Clause II.1.5.1 Thermal power plant (central) under SectionII.1.5 Energy works Industry and Table II.1 Classification of industrial works belonging to the main production technology chain as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

II.1.5

Energy projects

II.1.5.1 Thermal power plant

Yen Bai

>2000

600­ ÷ 2000

50 ÷ < 600

5 ÷ <50

< 5

e) Amend Clause II.1.5.11 Transmission lines and substations under SectionII.1.5 Energy works Industry and Table II.1 Classification of industrial works belonging to the main production technology chain as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

II.1.5

Energy projects

II.1.5.11 Transmission lines and substations

Voltage (kV)

≥500

220

110

-

< 110

g) Amend Clause III.1.3.1 Solid waste under Section III.1.3 Waste treatment Table III.1 Classification of technical infrastructure works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

III.1.3

Solid waste treatment

III.1.3.1 Urban solid waste

a) Transfer station

tons/day night

-

> 100

> 50 ÷ 100

> 5 ÷ 50

< 5

b) Landfill for solid waste

Protectionforest

-

≥ 50

30 ÷ < 50

10 ÷ < 30

< 10

c) Incineration and processing plant for solid waste

tons/day night

-

≥500

100 ÷ < 500

1 ÷ < 100

< 1

d) Solid waste treatment area

Protectionforest

≥150

50 ÷ <150

< 50

-

-

h) Amend Clause III.1.4.3 Cemetery under Section III.1.4 Other works Table III.1 Classification of technical infrastructure works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

III.1.4

Other works

III.1.4.3 Cemetery

Protectionforest

-

National cemetery

> 60

30 ÷ <60

< 30

i) Add Clause 5 Note Part of Table I.1, I.2 and I.3; Clause 5 Note Part of Table II.1, II.2; Clause 4 Note Part of Table III.1, III.2; Note Part of Table IV with the following content:

"Earth retaining walls or loose materials structures are classified according to earth retaining wall works Section V.1.4 Table V."

k) Amend Section IV.1.3 Roads within urban areas and Section IV.1.4 Rural road works Table IV Classification of transportation works as follows:

Code Number

Civil construction installation.

Classification criteria

Level of Project

Special

I

II

III

IV

IV.1

Road

IV.1.3 Roads within urban areas

a) Urban expressway; main urban arterial roads; urban arterial roads

Speed (km/h)

120

80

100

b) Inter-area roads

Speed (km/h)

-

-

60

-

-

c) Area main roads; area roads

Speed (km/h)

-

-

60

40­ ÷ 50

-

d) Sub-area roads; residential group access roads

Speed (km/h)

-

-

-

40

20 ÷ 30

đ) Bicycle paths; pedestrian walkways

Level IV

IV.1.4 Rural roads

Type (according to Decision No. 315/QĐ-BGTVT dated February 23, 2011)

-

-

-

Type AH

- Type A3 includes: Senior Specialist, Senior Auditor, and equivalent positions;

Type

B

Type C

Article 2. Amend and supplement Clause 2 Article 2 of the Regulation on Organizing Awards for Construction Quality issued together with Circular No. 12/2013/TT-BXD dated July 31, 2013, as follows:

"2. Works that have been accepted for completion and put into use for at least the warranty period for works participating in the National Award for Construction Quality; works that have been accepted for completion and put into use for the High-Quality Construction Work Award up to the time of registration for award consideration."

Article 3. Amend and supplement Circular No. 13/2013/TT-BXD dated August 15, 2013

1. Amend Point c Clause 2 Article 4 as follows:

“c) The rationality of the design to ensure cost savings in construction projects: check the consistency between the main quantities of the budget estimate and the design quantities; verify the correctness and rationality of the application of policies and regulations, the use of construction unit prices, construction norms, proportion norms, consultancy cost estimates, and other cost items, determine the value of the construction project budget; evaluate the design solutions for cost-saving construction.”

2. Amend Points a and b Clause 4 Article 5 as follows:

“4. The specialized agencies under the Ministry of Industry and Trade shall review:

a) Projects of Class I and above regardless of funding sources: power transmission lines and substations, hydropower plants, thermal power plants, metallurgical plants, aluminum production plants, oil refining plants, gas processing plants, storage facilities and pipeline systems (for gasoline, diesel, liquefied petroleum gas), hazardous chemical production and storage plants, industrial explosives production and storage plants;

b) Projects of Class II and III of the following types: power transmission lines and substations, hydropower plants, thermal power plants, metallurgical plants, aluminum production plants within investment projects decided by the Minister of Industry and Trade.”

3. Amend Point d Clause 7 Article 5 as follows:

“d) Department of Industry and Trade:

- Projects of Class III and II of the following types: power transmission lines and substations, hydropower plants, thermal power plants, metallurgical plants, aluminum production plants, except projects specified in Point b Clause 4 of this Article.

- Projects of Class IV, III, and II of the following types: oil refining plants, gas processing plants, storage facilities and pipeline systems (for gasoline, diesel, liquefied petroleum gas), hazardous chemical production and storage plants, industrial explosives production and storage plants, except projects specified in Point c Clause 4 of this Article.”

4. Add Clause 9 to Article 5 as follows:

“9. Based on the actual conditions of each locality, the People's Committee of the province may delegate the review of design for some Class III and IV projects, which fall under the responsibility of the Construction Departments and specialized construction management departments, to the People's Committee of the district, Urban Management Boards, Industrial Park Management Boards to carry out.”

5. Add Clause 10 to Article 5 as follows:

“10. When reviewing the design of road projects within urban areas, based on the corresponding authority stipulated in Clauses 1, 2, and 7 of this Article, the specialized agencies under the Ministry of Transport and the Department of Transport shall be responsible for soliciting opinions from the specialized agencies under the Ministry of Construction and the Construction Departments regarding landscaping, lighting, water supply, drainage, tunnels, and other urban infrastructure components (if applicable) to ensure coordination, improve efficiency, save costs, and protect the environment and landscape.”

6. Add Clause 11 to Article 5 as follows:

“11. Within seven working days from the date of receiving complete valid documents for soliciting opinions as stipulated in Clause 10 of this Article, the specialized agencies under the Ministry of Construction and the Construction Departments shall provide their opinions in writing to the specialized agencies under the Ministry of Transport and the Department of Transport.

If beyond the aforementioned period, the specialized agencies under the Ministry of Construction and the Construction Departments do not provide written opinions, the specialized agencies under the Ministry of Transport and the Department of Transport have the right to notify the results of the design review for urban roads to the project sponsors. The specialized agencies under the Ministry of Construction and the Construction Departments shall bear responsibility for failing to provide their opinions.”

Article 4. Transitional Provisions

1. For investment projects to construct works decided on for investment before this Circular takes effect, the level of the work within the project shall be determined according to the Investment Decision;

2. For investment projects to construct works decided on for investment after this Circular takes effect, the level of the work within the project shall be determined in accordance with the provisions of this Circular.

Article 5. Effective Date

1. This Circular takes effect from September 1, 2014.

2. In the course of implementation, if there are difficulties, organizations and individuals shall send their opinions to the Ministry of Construction for consideration and resolution./.

 

DEPUTY MINISTER
DEPUTY MINISTER

Cao Lại Quang

原始文件(PDF)

在新标签页打开PDF ↗

关系图

↑ 依据及影响本文件的文件
依据 17
15/2013/NĐ-CP Nghị định số 15/2013/NĐ-CP Về quản lý chất lượng công trình xây dựng 已失效 12/2009/NĐ-CP Nghị định số 12/2009/NĐ-CP Về quản lý dự án đầu tư xây dựng công trình 已失效 83/2009/NĐ-CP Nghị định số 83/2009/NĐ-CP Về sửa đổi, bổ sung một số điều Nghị định số 12/2009/NĐ-CP ngày 12 tháng 02 năm 2009 của Chính phủ về quản lý dự án đầu tư xây dựng công trình 已失效 62/2013/NĐ-CP Nghị định số 62/2013/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Xây dựng 已失效 39/2014/QD-UBND Quyết định số 39/2014/QD-UBND Về việc ban hành Quy định về trách nhiệm quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Thái Nguyên 生效中 39/2014/QĐ-UBND Quyết định số 39/2014/QĐ-UBND Ban hành Quy định về phân công, phân cấp quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Quảng Trị 已失效 05/2015/QĐ-UBND Quyết định số 05/2015/QĐ-UBND Về việc sửa đổi, bổ sung một số điều của Quy định một số nội dung về quản lý dự án đầu tư xây dựng công trình trên địa bàn tỉnh Ninh Thuận ban hành kèm theo Quyết định số 45/2014/QĐ-UBND ngày 12 tháng 6 năm 2014 của Ủy ban nhân dân tỉnh Ninh Thuận 已失效 11/2015/QĐ-UBND Quyết định số 11/2015/QĐ-UBND Ban hành quy định phân cấp quản lý và thực hiện dự án đầu tư công, dự án đầu tư xây dựng công trình trên địa bàn tỉnh Tây Ninh 已失效 18/2015/QĐ-UBND Quyết định số 18/2015/QĐ-UBND Ban hành Quy định về quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Tây Ninh 已失效 25/2014/QĐ-UBND Quyết định số 25/2014/QĐ-UBND Ban hành quy định phân công, phân cấp quản lý nhà nước về chất lượng công trình xây dựng trên địa bàn tỉnh Hậu Giang 已失效 30/2014/QĐ-UBND Quyết định số 30/2014/QĐ-UBND Ban hành Quy định quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Cao Bằng 已失效 65/2014/QĐ-UBND Quyết định số 65/2014/QĐ-UBND Ban hành Quy định về phân cấp quản lý nghĩa trang, hạn mức đất và công tác quản lý xây dựng nghĩa trang, nghĩa địa trên địa bàn tỉnh Hà Tĩnh 已失效 45/2015/QĐ-UBND Quyết định số 45/2015/QĐ-UBND Ban hành quy định phân cấp quản lý và sử dụng nghĩa trang trên địa bàn tỉnh Lâm Đồng 已失效 04/2015/QĐ-UBND Quyết định số 04/2015/QĐ-UBND Về việc sửa đổi bổ sung một số điều của Quyết định 14/2014/QĐ-UBND ngày 10/3/2014 và Quyết định số 22/2014/QĐ-UBND ngày 18/4/2014 của UBND tỉnh Long An 已失效 61/2014/QĐ-UBND Quyết định số 61/2014/QĐ-UBND Ban hành Quy định trách nhiệm quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Thừa Thiên Huế 已失效 34/2014/QĐ-UBND Quyết định số 34/2014/QĐ-UBND Ban hành Quy định phân cấp kiểm tra công tác nghiệm thu đưa công trình vào sử dụng đối với một số công trình cấp III, cấp IV thực hiện trên địa bàn tỉnh Tuyên Quang 已失效 25/2014/QĐ-UBND Quyết định số 25/2014/QĐ-UBND V/v sửa đổi, bổ sung một số điều của Quy định phân cấp Quản lý quy hoạch đô thị, quy hoạch xây dựng; Quản lý dự án đầu tư xây dựng công trình; Quản lý cấp giấy phép xây dựng; Quản lý chi phí đầu tư xây dựng công trình và Quản lý chất lượng công trình xây dựng trên địa bàn tỉnh Thái Bình ban hành kèm theo Quyết định số 21/2013/QĐ-UBND ngày 22/11/2013 của Ủy ban nhân dân tỉnh Thái Bình và phân cấp trách nhiệm quản lý chất lượng xây dựng nhà ở riêng lẻ trên địa bàn tỉnh Thái Bình. 已失效
09/2014/TT-BXD
Circular No. 09/2014/TT-BXD amending and supplementing some articles in the Circulars guiding the Government's Decree No. 15/2013/NĐ-CP dated February 6, 2013 on Construction Quality Management.
In effect
↓ 受本文件影响的文件
相关 11
25/2014/QĐ-UBND QUYẾT ĐỊNH SỐ 25/2014/QĐ-UBND BAN HÀNH QUY CHẾ THEO DÕI, ĐÔN ĐỐC, KIỂM TRA VIỆC THỰC HIỆN NHIỆM VỤ DO ỦY BAN NHÂN DÂN TỈNH, CHỦ TỊCH ỦY BAN NHÂN DÂN TỈNH GIAO 已失效 61/2014/QĐ-UBND Quyết định số 61/2014/QĐ-UBND Về việc Quy định mức chi cho công tác hỗ trợ nạn nhân bị mua bán trên địa bàn tỉnh Đồng Nai 已失效 39/2014/QĐ-UBND Quyết định số 39/2014/QĐ-UBND Sửa đổi, bổ sung một số điều của Quyết định số 23/2014/QĐ-UBNDngày 30/7/2014 của Ủy nhân dân tỉnh Tiền Giang 已失效 45/2015/QĐ-UBND Quyết định số 45/2015/QĐ-UBND Ban hành Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Sở Giao thông vận tải tỉnh Cao Bằng 已失效 18/2015/QĐ-UBND Quyết định số 18/2015/QĐ-UBND Về việc ban hành Quy chế xây dựng, quản lý và thực hiện Chương trình Xúc tiến thương mại tỉnh Bắc Kạn 已失效 11/2015/QĐ-UBND Quyết định số 11/2015/QĐ-UBND Về việc điều chỉnh, bổ sung Quyết định số 67/2013/QĐ-UBND ngày 26/12/2013 của UBND tỉnh Quy định mức thu dịch vụ khám bệnh, chữa bệnh áp dụng tại các cơ sở khám bệnh, chữa bệnh công lập trên địa bàn tỉnh Long An 已失效 30/2014/QĐ-UBND QUYẾT ĐỊNH SỐ 30/2014/QĐ-UBND BAN HÀNH QUY ĐỊNH VỀ NỘI DUNG VÀ MỨC CHI ĐỐI VỚI CÁC HOẠT ĐỘNG KIỂM SOÁT THỦ TỤC HÀNH CHÍNH TRÊN ĐỊA BÀN TỈNH HẢI DƯƠNG 生效中 65/2014/QĐ-UBND Quyết định số 65/2014/QĐ-UBND Ban hành Quy định về mức chi đón tiếp, thăm hỏi, chúc mừng đối với một số đối tượng do Ủy ban Mặt trận Tổ quốc Việt Nam tỉnh, Ủy ban Mặt Trận Tổ quốc Việt Nam cấp huyện thực hiện trên địa bàn tỉnh Lào Cai 已失效 04/2015/QĐ-UBND Quyết định số 04/2015/QĐ-UBND Ban hành Quy định về phân công, phân cấp trách nhiệm quản lý nhà nước vè đấu thầu trên địa bàn tỉnh Quảng Trị 已失效 05/2015/QĐ-UBND Quyết định số 05/2015/QĐ-UBND Về việc quy định hạn mức giao đất ở, đất trống, đồi núi trọc, đất có mặt nước thuộc nhóm đất chưa sử dụng cho mỗi hộ gia đình, cá nhân; công nhận quyền sử dụng đất ở đối với thửa đất có vườn, ao; diện tích tối thiểu của thửa đất mới hình thành và các trường hợp không được tách thửa trên địa bàn tỉnh Quảng Trị 已失效 01/2015/QĐ-UBND Quyết định số 01/2015/QĐ-UBND Về ban hành Quy chế tổ chức và hoạt động của Phòng Giáo dục và Đào tạo huyện Cần Giờ. 已失效

点击文件即可打开。红色边框=改变效力的关系。