Circular No. 15/2021/TT-BXD guiding urban and concentrated residential area wastewater collection and drainage infrastructure projects.

This Circular details management, operation, and connection work for wastewater drainage systems in urban areas and concentrated residential areas. It includes technical requirements for stormwater overflow wells, encircling sewers, collection sewers, discharge outlets for treated effluent into receiving water bodies, and regulations on connecting drainage systems between individual dischargers and drainage units.

Số hiệu15/2021/TT-BXD
Loại văn bảnCircular
Cơ quan ban hànhMinistry of Construction
Người kýLê Quang Hùng — Thứ trưởng
Cập nhật13/06/2026
Lĩnh vựcUncategorized
Ngày ban hành15/12/2021
Ngày áp dụng10/02/2022
Ngày hết hiệu lực
Tình trạngIn effect
✦ Tóm lược thông minh

This Circular details management, operation, and connection work for wastewater drainage systems in urban areas and concentrated residential areas. It includes technical requirements for stormwater overflow wells, encircling sewers, collection sewers, discharge outlets for treated effluent into receiving water bodies, and regulations on connecting drainage systems between individual dischargers and drainage units.

Đối tượng áp dụng

Existing and newly constructed urban areas and concentrated residential areas; production, business, and service establishments within urban areas and concentrated residential areas; drainage units and People's Committees at all levels.

Các điểm cốt lõi

  • Technical requirements for stormwater overflow wells, encircling sewers, collection sewers, discharge outlets for treated effluent into receiving water bodies.
  • Regulations on connecting drainage systems between individual dischargers and drainage units.
  • Responsibilities of drainage units and People's Committees at all levels in managing the drainage system.
  • effective_date_10_02_2022
  • decision_maker

🌐 Tác động xã hội từ văn bản này

  • To improve water quality and urban landscape.
  • To reduce the risk of pollution caused by wastewater.
  • To enhance the efficiency of drainage system management and operation.

❓ Câu hỏi thường gặp

Does this Circular apply to existing residential areas?

Yes, this Circular applies to both existing and newly constructed urban areas and concentrated residential areas.

What responsibilities does a drainage unit have in managing the drainage system?

Drainage units must establish technical management procedures, operational plans, preventive and emergency response plans for environmental incidents; regularly maintain collection and drainage facilities, stormwater facilities, and other components of the drainage system.

When does this Circular take effect?

This Circular takes effect from February 10, 2022.

Toàn văn

MINISTRY OF CONSTRUCTION

SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness

Number: 15/2021/TT-BXD
Hanoi, December 15, 2021

CIRCULAR

Guidelines on urban and concentrated residential area wastewater collection and drainage infrastructure works

Pursuant to the Law on Construction promulgated on June 18, 2014; The Law Amending and Supplementing Certain Provisions of the Construction Law on June 17, 2020;

Pursuant to the Environmental Protection Law dated November 17, 2020;

Pursuant to Decree No. 81/2017/NĐ-CP dated July 17, 2017 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Construction;

Pursuant to the Government Decree No. 80/2014/NĐ-CP dated August 6, 2014 on Drainage and Wastewater Treatment; Government Decree No. 98/2019/NĐ-CP dated 27 the 12 Article 2. The receipt, handling of reflections and petitions from individuals and organizations concerning administrative regulations shall be carried out in accordance with Decree No. 20/2008/NĐ-CP dated February 14, 2008 of the Government on the receipt, handling of reflections and petitions from individuals and organizations concerning administrative regulations (amended and supplemented by Decree No. 48/2013/NĐ-CP dated May 14, 2013 on amending and supplementing certain articles of decrees related to administrative procedure control and Decree No. 92/2017/NĐ-CP dated August 7, 2017 on amending and supplementing certain articles of decrees related to administrative procedure control).9 of the Government on amending and supplementing certain provisions of decrees within the technical infrastructure sector;

At the proposal of the Director of the Technical Infrastructure Department;

The Minister of Construction issues this Circular guiding on urban and concentrated residential area wastewater collection and drainage infrastructure works.

Article 1. Scope of Regulation

These Guidelines provide guidance on certain aspects of urban and concentrated residential area wastewater collection and drainage infrastructure works including requirements that must be met in construction, management, and operation activities.

Article 2. Applicability

These Guidelines apply to agencies, organizations, individuals, and households related to construction, management, and operation activities of urban and concentrated residential area wastewater collection and drainage infrastructure works.

Article 3. Explanation of Terms

In this Circular, the following terms shall be understood as follows:

1. Urban and concentrated residential area wastewater collection and drainage infrastructure works (hereinafter referred to as wastewater collection and drainage works) include connection boxes, tertiary sewers, secondary sewers, primary sewers, pumping stations, sewage separation wells, inspection wells, discharge outlets, and other auxiliary works aimed at collecting, conveying, and treating wastewater to meet national environmental technical standards for discharge into receiving water bodies.

2. Connection box is a device or inspection well constructed at the point of connection to link household sewage and stormwater pipes to the drainage system, arranged to facilitate connection and maintenance, repair, cleaning, and dredging.

3. Connecting the drainage system is linking the household drainage sewer to the drainage system.

4. Household drainage sewer is a pipeline, sewer, ditch, or canal drainage system built within the household's land area to collect sewage and stormwater and convey them to the connection point.

5. Primary sewer is the main sewer line collecting sewage from drainage catchment areas to the wastewater treatment plant.

6. Secondary sewer is the sewer transporting sewage from a drainage sub-catchment area to the primary sewer.

7. Tertiary sewer is the sewer collecting sewage from households to the secondary sewer or primary sewer.

8. Collector sewer is the primary or secondary sewer line of the common drainage system collecting all sewage during non-rainfall periods and a fixed portion of stormwater mixed with sewage during rainfall, and conveying it to the pumping station for delivery to the wastewater treatment plant.

9. Stormwater overflow well (or sewage separation well) is a facility located on the common drainage system to separate sewage for centralized wastewater treatment plants, while allowing a mixture of stormwater and sewage to overflow into receiving water bodies during heavy rainfall.

10. Specialized agency for drainage is an advisory body assisting local People's Committees at various levels in performing state management functions in the drainage and wastewater treatment sector; implementing tasks and powers delegated by higher-level state authorities.

11. Concentrated residential area mentioned herein refers to rural settlement points as defined in the Construction Law and other residential areas outside urban development zones established according to approved planning.

Article 4. Principles for managing and constructing wastewater collection and drainage works

1. Investment in constructing urban and concentrated residential area wastewater collection and drainage works must comply with urban planning, construction planning, and urban wastewater drainage planning (if available) according to each drainage basin.

2. The construction, repair, and renovation of wastewater collection and drainage works must be synchronized, ensuring connection with other works on the drainage network and wastewater treatment system; ensuring capacity to transport and treat the volume of wastewater from the area, with reserve capacity for generated wastewater volumes and achieving national technical standards for environmental quality before discharge into receiving water bodies. Encouragement is given to using trenchless construction solutions for drainage pipes, especially primary drainage pipes in old urban areas with high traffic density.

3. Existing urban and concentrated residential areas that have a common drainage network, People's Committees at all levels according to their management hierarchy are responsible for establishing and approving plans and timelines for investment, construction, upgrading, renovation, and expansion into separate or semi-separate drainage systems (constructing stormwater overflow wells, encircling sewers, and collection sewers to collect and transport wastewater to centralized wastewater treatment plants).

4. New urban and concentrated residential areas must construct separate systems for wastewater collection and treatment from stormwater drainage systems to organize connections, collection, and transportation of wastewater, meeting the drainage needs within the area, except in special cases prescribed by the Government.

Article 5. Wastewater Collection and Drainage Works

1. Stormwater Overflow Wells on Common Drainage Systems:

a) Based on current drainage conditions, topography, geology, and hydrology, determine the location for constructing stormwater overflow wells. The location for stormwater overflow wells must ensure accessibility during management, operation, and monitoring of the works, facilitate stormwater discharge into receiving water bodies, and not affect other infrastructure works;

b) Management and operation of stormwater overflow wells must comply with management and operation procedures approved by competent authorities;

c) Stormwater overflow wells must be regularly cleaned, maintained, and serviced to ensure normal operation of the works.

2. Encircling Sewers and Collection Sewers for Transporting Wastewater to Treatment Plants:

a) The location and depth of encircling sewers and collection sewers for wastewater must ensure convenience in management and operation and comply with national technical standards for infrastructure works in drainage systems;

b) The diameter, velocity, and slope of encircling sewers and collection sewers for wastewater must be calculated and checked to ensure the flow rate for collecting and transporting wastewater to centralized wastewater treatment plants without leakage into the environment;

c) Encircling sewers and collection sewers must ensure durability, tightness, and stability under load, natural conditions, and environmental corrosion over the service life of the works.

3. Discharge Outlets for Treated Wastewater into Receiving Water Bodies must be constructed in suitable locations to allow wastewater to mix with receiving water bodies without causing erosion of banks, affecting the surrounding landscape, structures, and waterway traffic activities.

4. Inspection Wells for Discharge Outlets must be constructed in convenient locations for accessing, inspecting, controlling discharges, and sampling before discharge into receiving water bodies.

5. Common Drainage Systems with Flood Control Reservoirs, stormwater must pass through stormwater overflow wells when discharged into flood control reservoirs. Water storage and level regulation in flood control reservoirs must ensure stormwater regulation tasks.

Article 6. Connection to Sewage Systems

1. Implementation of connection to sewage systems:

a) Prior to implementing the connection agreement, the drainage unit shall be responsible for inspecting the drainage capacity of the existing drainage system, ensuring that the construction of collection and drainage facilities does not affect the drainage capacity of the existing area;

b) For households connected to the drainage system within the watershed of the common drainage system, the drainage unit must provide at least one common connection point for both wastewater and stormwater. For households connected to the drainage system within the watershed of the individual drainage system, the drainage unit must provide at least one connection point to the wastewater drain and at least one connection point to the stormwater drain;

c) The height of the connection point at the connection box must be lower than the height of the household's drainage facilities. In cases where the construction project has already installed a fixed connection point, the construction project investor must comply with the foundation height of the provided connection box, ensuring the slope, ensuring that wastewater from the collection drain does not flow back into the household's facilities;

d) In cases where due to the current status of the facility or terrain, the wastewater discharge point inside the household's facility is lower than the connection box, the drainage unit shall guide the household to implement remediation measures to ensure that the household's wastewater can be connected to the drainage system in accordance with technical connection requirements;

e) The connection box must be constructed as a fixed structure at the connection point, ensuring stability, safety, and convenience for inspection, monitoring, and maintenance, preventing leakage of wastewater.

2. Requirements for connecting to the drainage system:

a) Urban areas and concentrated residential areas with their own drainage systems and centralized urban wastewater treatment plants, household wastewater must be directly connected to the connection box. In cases where upgrading and renovating the common drainage system into an individual drainage system, the owner of the drainage works shall base on the current status and drainage conditions in the upgraded and renovated area to decide on maintaining septic tanks;

b) Household wastewater drains must be connected to the connection box or other drainage facilities in areas without a connection box. Household stormwater drains must be permanently connected to the stormwater connection box, canal, ditch, or stormwater drain in the area;

c) Untreated wastewater must be connected to the collection drain of the drainage system, it must not seep into the ground or flow into other water sources;

d) Wastewater from production, business, and service establishments in urban areas and concentrated residential areas must be collected and preliminarily treated to meet urban regulations or local government regulations before being connected to the collection and drainage facilities;

e) On-site treated wastewater from production, business, and service establishments in urban areas and concentrated residential areas must meet environmental technical standards or environmental protection requirements for each type of wastewater before being connected to the collection and drainage facilities.

Article 7. Responsibilities for Managing Collection and Drainage Facilities and Connecting to Drainage Systems

1. Responsibilities of the Drainage Unit:

a) Develop technical management procedures, operation plans, and emergency response plans during the operation of the drainage system, and propose development solutions for the network according to the watershed management with specialized drainage agencies;

b) Regularly maintain collection and drainage facilities, stormwater facilities, and other facilities of the drainage system, ensuring that the facilities are always maintained in normal operation;

c) Monitor and regulate the water level of reservoirs, canals, ditches, and stormwater drains, ensuring maximum drainage and stormwater regulation capabilities, preventing flooding;

d) Manage the elevation of main drainage lines and wastewater collection drains; provide the elevation of drainage system connection points to organizations and individuals within the management area upon request.

2. Responsibilities of People's Committees at all levels:

a) People's Committees at all levels, based on their management hierarchy, are responsible for establishing and approving investment plans and timelines for upgrading, expanding, and constructing separate stormwater collection facilities and wastewater collection and treatment facilities;

b) People's Committees at all levels direct specialized drainage agencies to be responsible for guiding and inspecting the implementation of this Circular in their respective localities.

Article 8. Implementation clause

1. This Circular takes effect from February 10, 2022.

2. During the implementation of this Circular, if any issues arise, relevant agencies, organizations, and individuals shall promptly report them to the Ministry of Construction for research, guidance, and resolution./.

DEPUTY MINISTER
DEPUTY MINISTER
(Signed)
Le Quang Hung

Văn bản gốc (PDF)

Mở PDF trong tab mới ↗

Bản đồ quan hệ

↑ Cơ sở & văn bản tác động lên văn bản này
Căn cứ 26
62/2020/QH14 Luật sửa đổi, bổ sung một số điều của Luật Xây dựng số 62/2020/QH14 Còn hiệu lực 98/2019/NĐ-CP Nghị định số 98/2019/NĐ-CP Sửa đổi, bổ sung một số điều của các nghị định thuộc lĩnh vực hạ tầng kỹ thuật Còn hiệu lực 81/2017/NĐ-CP Nghị định số 81/2017/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Xây dựng Hết hiệu lực 80/2014/NĐ-CP Nghị định số 80/2014/NĐ-CP Về thoát nước và xử lý nước thải Còn hiệu lực 50/2014/QH13 Luật Xây dựng số 50/2014/QH13 Còn hiệu lực 72/2020/QH14 Luật Bảo vệ môi trường số 72/2020/QH14 Còn hiệu lực 223/2025/QĐ-UBND Quyết định số 223/2025/QĐ-UBND Ban hành Quy định quản lý hoạt động thoát nước và xử lý nước thải đô thị, khu dân cư nông thôn tập trung và khu công nghiệp; quản lý, phân loại, thu gom, vận chuyển và xử lý bùn thải từ hầm cầu, bể phốt, bùn thải từ hệ thống thoát nước trên địa bàn thành phố Hải Phòng Còn hiệu lực 175/2025/QĐ-UBND Quyết định số 175/2025/QĐ-UBND Quy định quản lý hoạt động thoát nước và xử lý nước thải trên địa bàn tỉnh Ninh Bình Còn hiệu lực 14/2026/QĐ-UBND Quyết định số 14/2026/QĐ-UBND Ban hành Quy định quản lý và phân cấp quản lý hạ tầng kỹ thuật trên địa bàn tỉnh Điện Biên Còn hiệu lực 19/2026/QĐ-UBND Quyết định số 19/2026/QĐ-UBND Ban hành Quy định quản lý hoạt động thoát nước và xử lý nước thải trên địa bàn tỉnh Vĩnh Long Còn hiệu lực 38/2025/QĐ-UBND Quyết định số 38/2025/QĐ-UBND Quy định phân cấp, quản lý kết cấu hạ tầng kỹ thuật trên địa bàn tỉnh Phú Thọ Còn hiệu lực 66/2025/QĐ-UBND Quyết định số 66/2025/QĐ-UBND Sửa đổi, bổ sung một số điều của Quy định về quản lý hoạt động thoát nước trên địa bàn tỉnh Thanh Hóa ban hành kèm theo Quyết định số 25/2023/QĐ-UBND ngày 23/6/2023 của UBND tỉnh Thanh Hóa. Còn hiệu lực 38/2025/QĐ-UBND Quyết định số 38/2025/QĐ-UBND Ban hành quy định quản lý hoạt động thoát nước và xử lý nước thải trên địa bàn tỉnh Bà Rịa-Vũng Tàu Còn hiệu lực 04/2025/QĐ-UBND Quyết định số 04/2025/QĐ-UBND Ban hành Quy định quản lý hoạt động thoát nước trên địa bàn tỉnh Bến Tre Còn hiệu lực 70/2024/QĐ-UBND Quyết định số 70/2024/QĐ-UBND sửa đổi, bổ sung một số điều của Quy định về quản lý hoạt động thoát nước và xử lý nước thải trên địa bàn tỉnh Tây Ninh ban hành kèm theo Quyết định số 29/2017/QĐ-UBND ngày 20 tháng 9 năm 2017 của Ủy ban nhân dân tỉnh Tây Ninh Còn hiệu lực 03/2024/QĐ-UBND Quyết định số 03/2024/QĐ-UBND Ban hành Quy định lộ trình bố trí quỹ đất, đầu tư xây dựng hệ thống thu gom, xử lý nước thải đô thị, khu dân cư tập trung; lộ trình và chính sách hỗ trợ thu gom, xử lý tại chỗ nước thải sinh hoạt phát sinh từ tổ chức, hộ gia đình trong đô thị, khu dân cư tập trung, khu dân cư không tập trung trên địa bàn tỉnh Hậu Giang Còn hiệu lực 03/2024/QĐ-UBND Quyết định số 03/2024/QĐ-UBND Sửa đổi, bổ sung một số điều của Quy định quản lý hoạt động thoát nước và xử lý nước thải trên địa bàn tỉnh Lạng Sơn được ban hành kèm theo Quyết định số 01/2016/QÐ-UBND ngày 14 tháng 01 năm 2016 của Ủy ban nhân dân tỉnh Lạng Sơn Còn hiệu lực số 39/2023/QĐ-UBND Quyết định số số 39/2023/QĐ-UBND Ban hành Quy định quản lý hoạt động thoát nước, xử lý nước thải trên địa bàn tỉnh Quảng Nam Hết hiệu lực 48/2023/QĐ-UBND Quyết định số 48/2023/QĐ-UBND Ban hành Quy định quản lý hoạt động thoát nước và xử lý nước thải đô thị, khu dân cư nông thôn tập trung và khu công nghiệp; quản lý, phân loại, thu gom, vận chuyển và xử lý bùn thải từ hầm cầu, bể phốt, bùn thải từ hệ thống thoát nước trên địa bàn thành phố Hải Phòng Hết hiệu lực 25/2023/QĐ-UBND Quyết định số 25/2023/QĐ-UBND Ban hành Quy định về đầu tư, lộ trình và chính sách hỗ trợ xây dựng hệ thống thu gom, xử lý nước thải trên địa bàn tỉnh Đắk Lắk Còn hiệu lực 43/2023/QĐ-UBND Quyết định số 43/2023/QĐ-UBND Ban hành quyết định về quản lý hoạt động thoát nước trên địa bàn tỉnh Lâm Đồng Còn hiệu lực 25/2023/QĐ-UBND Quyết định số 25/2023/QĐ-UBND Ban hành Quy định về quản lý hoạt động thoát nước trên địa bàn tỉnh Thanh Hóa Còn hiệu lực 37/2022/QĐ-UBND Quyết định số 37/2022/QĐ-UBND Ban hành Quy định một số nội dung về quản lý nước thải trên địa bàn tỉnh Lai Châu Còn hiệu lực 59/2022/QĐ-UBND Quyết định số 59/2022/QĐ-UBND Ban hành Quy định lộ trình bố trí quỹ đất, đầu tư và các chính sách ưu đãi, hỗ trợ đầu tư xây dựng hệ thống thu gom, xử lý nước thải đô thị, khu dân cư tập trung trên địa bàn tỉnh Quảng Bình Còn hiệu lực 88/2026/QĐ-UBND Quyết định số 88/2026/QĐ-UBND Ban hành quy định quản lý hoạt động thoát nước và xử lý nước thải trên địa bàn tỉnh Tây Ninh Còn hiệu lực 94/2026/QĐ-UBND Quyết định 94/2026/QĐ-UBND của Thái Nguyên Còn hiệu lực
15/2021/TT-BXD
Circular No. 15/2021/TT-BXD guiding urban and concentrated residential area wastewater collection and drainage infrastructure projects.
In effect
↓ Văn bản chịu tác động từ văn bản này
Liên quan 17
38/2025/QĐ-UBND Quyết định số 38/2025/QĐ-UBND Ban hành Quy trình kiểm tra nội dung về đăng ký kinh doanh trên địa bàn tỉnh Lào Cai Còn hiệu lực 66/2025/QĐ-UBND Quyết định số 66/2025/QĐ-UBND Quy định định mức kinh tế - kỹ thuật dịch vụ thoát nước đô thị, chiếu sáng đô thị trên địa bàn tỉnh Cao Bằng Còn hiệu lực 03/2024/QĐ-UBND Quyết định số 03/2024/QĐ-UBND Ban hành quy định về chức năng, nhiệm vụ, quyền hạn và tổ chức của Phòng Kinh tế thuộc Ủy ban nhân dân Quận 11 Còn hiệu lực 38/2026/QĐ-UBND Quyết định số 38/2026/QĐ-UBND Ban hành Quy định trình tự, thủ tục cho thuê quỹ đất ngắn hạn trên địa bàn tỉnh Đồng Tháp Còn hiệu lực 25/2023/QĐ-UBND Quyết định số 25/2023/QĐ-UBND Bãi bỏ các Quyết định của Uỷ ban nhân dân tỉnh Thái Nguyên trong lĩnh vực phí, lệ phí, giá và bồi thường giải phóng mặt bằng Còn hiệu lực 43/2023/QĐ-UBND Quyết định số 43/2023/QĐ-UBND Ban hành Quy định và Hướng dẫn xét công nhận Tiêu chí cơ sở hạ tầng thương mại nông thôn trong Bộ tiêu chí quốc gia về xã nông thôn mới và xã nông thôn mới nâng cao giai đoạn 2023-2025 trên địa bàn tỉnh Vĩnh Phúc Hết hiệu lực 59/2022/QĐ-UBND QUYẾT ĐỊNH SỐ 59/2022/QĐ-UBND QUY ĐỊNH CHỨC NĂNG, NHIỆM VỤ, QUYỀN HẠN VÀ CƠ CẤU TỔ CHỨC CỦA SỞ NGOẠI VỤ TỈNH NGHỆ AN Hết hiệu lực 39/2023/QĐ-UBND Quyết định số 39/2023/QĐ-UBND Quy định giá thóc thu thuế sử dụng đất nông nghiệp năm 2023 Hết hiệu lực 32/2026/QĐ-UBND Quyết định số 32/2026/QĐ-UBND Phân cấp thẩm quyền quyết định xác lập, phê duyệt phương án xử lý tài sản được xác lập quyền sở hữu toàn dân trên địa bàn tỉnh Ninh Bình Còn hiệu lực 70/2026/QĐ-UBND Quyết định số 70/2026/QĐ-UBND Bãi bỏ toàn bộ Quyết định số 91/2009/QĐ-UBND ngày 22/7/2009 của UBND thành phố Hà Nội về việc ban hành quy định về thu hút, sử dụng, đào tạo tài năng trẻ và nguồn nhân lực chất lượng cao của thành phố Hà Nội Còn hiệu lực 70/2024/QĐ-UBND Quyết định số 70/2024/QĐ-UBND Ban hành Quy chế phối hợp quản lý nhà nước trong công tác Bảo vệ quyền lợi người tiêu dùng trên địa bàn tỉnh Thái Nguyên Hết hiệu lực 65/2026/QĐ-UBND Quyết định 65/2026/QĐ-UBND của An Giang Còn hiệu lực 48/2023/QĐ-UBND Quyết định số 48/2023/QĐ-UBND Quy định điều kiện cụ thể hỗ trợ đầu tư kết cấu hạ tầng và chế biến sản phẩm đối với hợp tác xã, liên hiệp hợp tác xã hoạt động trong lĩnh vực nông nghiệp trên địa bàn tỉnh Bắc Giang đến năm 2025 Hết hiệu lực 37/2022/QĐ-UBND Quyết định số 37/2022/QĐ-UBND Ban hành Định mức kinh tế kỹ thuật trong công tác quản lý, khai thác và bảo vệ công trình thủy lợi trên địa bàn tỉnh Đắk Nông Còn hiệu lực

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.