Circular No. 33/2014/TT-BCT stipulates certain contents regarding shortening the time to access electricity

This Circular stipulates the shortening of the time for customers to access electricity using distribution networks at 110 kV voltage levels and individual substations connected to medium voltage grids, through adjusting the deadlines for reviewing applications, signing connection agreements, providing connection condition documentation, and completing energization.

Số hiệu33/2014/TT-BCT
Loại văn bảnCircular
Cơ quan ban hànhMinistry of Industry and Trade
Người kýCao Quốc Hưng — Thứ trưởng
Cập nhật19/06/2026
NgànhIndustry and Trade
Lĩnh vựcElectricity
Ngày ban hành10/10/2014
Ngày áp dụng25/11/2014
Ngày hết hiệu lực16/01/2017
Tình trạngExpired
✦ Tóm lược thông minh

This Circular stipulates the shortening of the time for customers to access electricity using distribution networks at 110 kV voltage levels and individual substations connected to medium voltage grids, through adjusting the deadlines for reviewing applications, signing connection agreements, providing connection condition documentation, and completing energization.

Đối tượng áp dụng

This Circular applies to customers using distribution networks at 110 kV voltage levels and individual substations connected to medium voltage grids, as well as power supply units.

Các điểm cốt lõi

  • Adjusting the deadlines for administrative procedures related to the agreement on pole/substation location and construction permit issuance for electrical works.
  • Shortening the time for reviewing applications and signing connection agreements with customers using distribution networks at 110 kV voltage levels and individual substations connected to medium voltage grids.
  • Announcing administrative procedures according to this Circular, encouraging the application of information technology when implementing administrative procedures.
  • wastehurryingintoeffectiveness
  • This Circular takes effect from November 25, 2014.

🌐 Tác động xã hội từ văn bản này

  • Aids in shortening the time for customers to access electricity, improving the quality of power supply services.
  • Enhances the management and operation efficiency of power supply service units.

❓ Câu hỏi thường gặp

To which entities does this Circular apply?

This Circular applies to customers using distribution networks at 110 kV voltage levels and individual substations connected to medium voltage grids, as well as power supply units.

When does this Circular take effect?

This Circular takes effect from November 25, 2014.

Toàn văn

 

CIRCULAR

Provisions on shortening the time to access electricity

__________________

 

Pursuant to Decree No. 95/2012/NĐ-CP dated November 12, 2012, of the Government, detailing the functions, tasks, powers, and organizational structure of the Ministry of Industry and Trade;

Pursuant to the Electricity Law dated December 3, 2004 and the Law Amending and Supplementing Some Articles of the Electricity Law dated November 20, 2012;

Based on Decree No. 137/2013/NĐ-CP dated October 21, 2013, issued by the Government, detailing the implementation of certain provisions of the Electricity Law and the Law Amending and Supplementing Certain Provisions of the Electricity Law;

Implementing Resolution No. 19/NQ-CP dated March 18, 2014 of the Government on key tasks and solutions to improve the business environment and enhance the country's competitiveness; Resolution No. 74/NQ-CP of the Government dated October 4, 2014 on the regular meeting of the Government in September 2014;

At the proposal of the Director General of the Energy Administration and the Director of the Electricity Regulatory Authority,

The Minister of Industry and Trade issues this Circular regulating some contents regarding shortening the time to access electricity.

Article 1. Scope of Regulation and Applicability

1. This Circular stipulates certain provisions on shortening the time to access electricity for customers requesting connection to the medium voltage power grid, as follows:

a) Amending and supplementing certain articles regarding the procedures and formalities for adjusting the provincial and centrally-administered city power development plans; confirming compliance with the plan as prescribed in Circular No. 43/2012/TT-BCT dated December 27, 2012 of the Ministry of Industry and Trade on the contents, procedures, and formalities for preparing, reviewing, approving, and adjusting the Power Development Plan (hereinafter referred to as Circular No. 43/2012/TT-BCT).

b) Amending and supplementing certain articles regarding the procedures and formalities for implementing the Connection Agreement as prescribed in Circular No. 32/2010/TT-BCT dated July 30, 2010 of the Ministry of Industry and Trade on the distribution system (hereinafter referred to as Circular No. 32/2010/TT-BCT).

c) Amending and supplementing certain appendices issued together with Circular No. 32/2010/TT-BCT.

d) Prescribing the responsibilities of the People's Committees of provinces and centrally-administered cities in implementing the provisions on shortening the time to access electricity.

Thông tư này áp dụng đối với tổ chức, cá nhân có liên quan đến hoạt động kinh doanh đối tượng thủy sản nuôi chủ lực trên lãnh thổ Việt Nam.

a) Customers using electricity who request connection to the medium voltage power grid;

b) Distribution companies;

c) Distribution companies and retail companies;

d) Vietnam Electricity Corporation;

đ) Relevant agencies, organizations, and individuals.

Article 2. Amending and supplementing certain articles of Circular No. 43/2012/TT-BCT

1. Amending point e Clause 1 Article 25 as follows:

“e) Within twenty-five working days from the date of receiving complete valid documents, the Energy Administration shall be responsible for completing the review of the planning adjustment dossier before submitting it to the Minister of Industry and Trade for approval;”.

2. Supplementing point d Clause 2 Article 25 as follows:

“d) Within ten working days from the date of receiving complete valid documents, the Department of Industry and Trade shall be responsible for completing the review of the planning adjustment dossier before submitting it to the Provincial People's Committee for approval;”.

3. Amending point b Clause 1 Article 27 as follows:

“b) Provide comments in writing on the conformity of the National Power Development Plan for power projects within seven working days from the date of receipt of the investor's request;”.

4. Amending point b Clause 2 Article 27 as follows:

“b) Direct the Department of Industry and Trade to provide comments in writing on the conformity of the Provincial Power Development Plan for power projects. Within three working days from the date of receipt of the investor's request, the Department of Industry and Trade shall be responsible for providing written comments on the conformity with the Power Development Plan;”.

Article 3. Amending and supplementing certain articles of Circular No. 32/2010/TT-BCT

1. Amending Clause 2 Article 45 as follows:

“2. In cases of new connection or change in existing connection at medium voltage and 110 kV levels, customers using the distribution network must submit to the Distribution Unit the following documents:

a) Connection application dossier:

- According to the model prescribed in Appendices 2C to 2D issued together with this Circular for customers using the distribution network requesting connection at 110 kV voltage level;

- According to the model prescribed in Appendix 2C and Appendix 2D issued together with this Circular for customers with generating units requesting connection to the medium voltage network;

- According to the model prescribed in Appendix 2E and Appendix 2G issued together with this Circular for customers using electricity with their own substation connecting to the medium voltage network.

b) Schematic diagram of main electrical equipment after the connection point;

c) Technical documentation on the equipment intended for connection or changes expected at the current connection point, the estimated completion time of the project, economic and technical data of the new connection project or changes in the existing connection.”

2. The name of Article 47 is amended as follows:

Article 47. Time limit for reviewing and signing the Connection Agreement with customers using distribution networks who request connection at 110 kV voltage level and customers with power generation units requesting connection to medium voltage grid.

3. Supplement Article 47a following Article 47 as follows:

Article 47a. Time limit for reviewing and signing the Connection Agreement with customers having their own substation connecting to the medium voltage grid

For customers having their own substation connecting to the medium voltage grid, within five working days from the date of receiving complete and valid customer files, the Distribution Unit shall be responsible for completing negotiations and signing the Connection Agreement.

4. The name of Article 50 is amended as follows:

Article 50. Provision of documents on conditions for energizing the connection point for customers using distribution networks who request connection at 110 kV voltage level and customers with power generation units requesting connection to medium voltage grid

5. Supplement Article 50a following Article 50 as follows:

Article 50a. Provision of documents on conditions for energizing the connection point for customers having their own substation connecting to the medium voltage grid

1. Before the expected first energization and trial run date, the customer requesting connection must provide the Distribution Unit with two sets of documents for checking the conditions for energizing the connection point (in Vietnamese or English for technical documents confirmed by the customer requesting connection and certified copies of legal documents), including:

a) Completion and acceptance documents for the project according to the regulations of the Ministry of Construction;

b) Technical design documents after completion of the design agreement with the Distribution Unit and reviewed by the competent authority, including general description, main electrical connection diagrams, layout plan of electrical equipment, protection and control system principle diagrams, related diagrams and technical specifications of main electrical equipment;

c) Operation and management manuals provided by the manufacturer;

d) Acceptance records for individual and overall parts of the connection equipment of the transmission line and substation connected to the distribution network in compliance with Vietnamese technical standards or internationally recognized standards accepted by Vietnam and meeting the technical requirements for connection equipment specified from Article 34 to Article 44 of this Circular;

đ) Scheduled trial run and operation plans;

2. After receiving all documents, the Distribution Unit shall be responsible for providing the customer requesting connection with the following documents:

a) Equipment numbering diagram;

b) Requirements for customer relay protection settings from the connection point towards the customer; relay setting sheets and related setting values for customer relay protection devices controlled by the dispatching authority issuing the distribution network dispatching orders;

c) Testing and calibration requirements for equipment;

d) Requirements for receiving dispatching orders;

đ) Requirements for establishing communication systems serving dispatching;

e) Requirements for collecting and transmitting SCADA/DMS system data (if applicable);

g) Automatic control methods (if applicable);

h) List of relevant procedures related to national electricity system operation, distribution system operation, and coordinated operation procedures;

i) List of relevant staff and system operating engineers along with contact phone numbers and fax numbers;

3. Before the expected first energization and trial run date, the customer requesting connection must provide the Distribution Unit with the following contents:

a) Schedule for trial run and energization of electrical equipment;

b) Agreement on responsibilities of each party regarding management and operation of the connection equipment;

c) Internal regulations for safe operation of the connection equipment;

d) List of customer's operating personnel including names, professional positions, responsibilities along with contact phone numbers and fax numbers.

6. Supplement Article 53a following Article 53 as follows:

Article 53a. Time limit for completing energization for electricity customers with their own substation connected to the medium voltage grid

Within ten working days from the date of receiving all valid energization point registration documents, the Distribution Unit shall be responsible for completing the trial energization, acceptance, and official energization operation for the customer requesting connection.

Article 4. Amend and supplement some appendices issued together with Circular No. 32/2010/TT-BCT

1. Amend the name of Appendix 2C as follows:

"GENERAL INFORMATION FOR CONNECTION REGISTRATION FOR CUSTOMERS USING DISTRIBUTION NETWORKS (CONNECTION TO THE 110 KV GRID AND ABOVE)"

2. Amend the name of Appendix 2D as follows:

"INFORMATION ON CUSTOMER'S ELECTRICITY REQUIREMENTS FOR CONNECTION REQUEST (CONNECTION TO THE 110 KV GRID AND ABOVE)"

3. Supplement Appendices 2E and 2G after Appendix 2D of Circular No. 32/2010/TT-BCT according to Appendix I issued together with this Circular.

4. Amend Appendix 3 of Circular No. 32/2010/TT-BCT according to Appendix II issued together with this Circular.

Article 5. Responsibilities of the People's Committee of provinces and centrally governed cities

Based on relevant legal documents, the People's Committee of provinces and centrally governed cities shall be responsible for:

1. Issuing regulations on the time limit for handling procedures for agreeing on pole/substation positions and power line corridors: not exceeding five working days for overhead medium voltage grids and not exceeding ten working days for underground medium voltage grids.

2. Issuing regulations on the time limit for handling construction permit procedures for power projects: not exceeding seven working days for overhead medium voltage grids and not exceeding ten working days for underground medium voltage grids.

Article 6. Implementation

1. Vietnam Electricity Corporation shall be responsible for directing its subordinate units to implement this Circular.

2. The National Energy Administration and the Electricity Regulatory Authority shall be responsible for disseminating, guiding, and supervising the implementation of this Circular.

3. The People's Committee of provinces and centrally governed cities shall be responsible for directing specialized agencies:

a) Reviewing and drafting, amending related administrative procedures; announcing related administrative procedures in accordance with this Circular, encouraging the application of information technology when implementing administrative procedures;

b) Annually reporting to the Ministry of Industry and Trade the results and evaluation of shortening the time to access electricity as stipulated in this Circular.

Article 7. Effective Date

1. This Circular takes effect from November 25, 2014.

2. During the implementation process, if there are difficulties, units shall be responsible for reporting to the Minister of Industry and Trade for consideration to amend and supplement this Circular./.

 

Văn bản gốc (PDF)

Mở PDF trong tab mới ↗

Bản đồ quan hệ

↑ Cơ sở & văn bản tác động lên văn bản này
Căn cứ 12
137/2013/NĐ-CP Nghị định số 137/2013/NĐ-CP Quy định chi tiết thi hành một số điều của Luật Điện lực và Luật sửa đổi, bổ sung một số điều của Luật Điện lực Hết hiệu lực 95/2012/NĐ-CP Nghị định số 95/2012/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Công Thương Hết hiệu lực 118/2015/QĐ-UBND Quyết định số 118/2015/QĐ-UBND Ban hành Quy định một số thủ tục liên quan đến tiếp cận điện năng trên địa bàn tỉnh Bắc Giang Còn hiệu lực 3294/2015/QĐ-UBND Quyết định số 3294/2015/QĐ-UBND Ban hành Quy định về thời hạn giải quyết các thủ tục thỏa thuận vị trí cột/trạm điện và hành lang lưới điện, cấp phép thi công xây dựng công trình điện đối với lưới điện trung áp trên địa bàn tỉnh Thanh Hóa Còn hiệu lực 07/2016/QĐ-UBND Quyết định số 07/2016/QĐ-UBND Về việc quy định một số thủ tục liên quan đến tiếp cận điện năng đối với lưới điện trung áp trên địa bàn tỉnh Tuyên Quang Hết hiệu lực 43/2016/QĐ-UBND Quyết định số 43/2016/QĐ-UBND Ban hành Quy định về thời hạn giải quyết các thủ tục thỏa thuận vị trí cột/trạm điện, hành lang lưới điện và cấp phép thi công xây dựng công trình điện đối với lưới điện trung áp trên địa bàn tỉnh Hậu Giang Hết hiệu lực 53/2016/QĐ-UBND Quyết định số 53/2016/QĐ-UBND Ban hành Quy định thời hạn giải quyết các thủ tục thỏa thuận vị trí cột/trạm điện và hành lang lưới điện, cấp phép thi công công trình điện đối với lưới điện trung áp trên địa bàn tỉnh Kon Tum Hết hiệu lực 44/2016/QĐ-UBND Quyết định số 44/2016/QĐ-UBND Ban hành quy định về trình tự, thời hạn giải quyết thủ tục thỏa thuận vị trí cột/trạm điện và hành lang lưới điện, cấp phép thi công xây dựng công trình điện trung áp trên địa bàn tỉnh Lâm Đồng Hết hiệu lực 24/2015/QĐ-UBND Quyết định số 24/2015/QĐ-UBND Về việc ban hành quy định về một số thủ tục rút ngắn thời gian tiếp cận điện năng lưới điện trung áp trên địa bàn tỉnh Bắc Kạn Hết hiệu lực 08/2016/QĐ-UBND Quyết định số 08/2016/QĐ-UBND Về việc sửa đổi khoản 3 Điều 11, khoản 4 của các Điều 14, 15, 16, 23 và 24 của Quy định về quản lý, khai thác, bảo trì và bảo vệ kết cấu hạ tầng giao thông đường bộ địa phương thuộc tỉnh Quảng Ngãi ban hành kèm theo Quyết định số 15/2015/QĐ-UBND ngày 14/4/2015 của UBND tỉnh Quảng Ngãi Còn hiệu lực 33/2015/QĐ-UBND Quyết định số 33/2015/QĐ-UBND Ban hành Quy định một số thủ tục liên quan đến tiếp cận điện năng đối với lưới điện trung áp trên địa bàn tỉnh Tiền Giang Hết hiệu lực 22/2015/QĐ-UBND Quyết định số 22/2015/QĐ-UBND Ban hành quy định một số nội dung về rút ngắn thời gian tiếp cận điện năng đối với lưới điện trung áp trên địa bàn tỉnh Phú Yên. Hết hiệu lực
33/2014/TT-BCT
Circular No. 33/2014/TT-BCT stipulates certain contents regarding shortening the time to access electricity
Expired
↓ Văn bản chịu tác động từ văn bản này
Liên quan 9
08/2016/QĐ-UBND Quyết định số 08/2016/QĐ-UBND Ban hành danh mục, thời gian sử dụng và tỷ lệ hao mòn tài sản cố định vô hình; danh mục, thời gian sử dụng và tỷ lệ hao mòn tài sản cố định đặc thù; danh mục và giá quy ước tài sản cố định đặc biệt thuộc phạm vi quản lý của tỉnh Khánh Hòa. Hết hiệu lực 22/2015/QĐ-UBND Quyết định số 22/2015/QĐ-UBND Ban hành Quy định đánh giá, nghiệm thu kết quả thực hiện nhiệm vụ khoa học và công nghệ cấp tỉnh sử dụng ngân sách nhà nước Hết hiệu lực 53/2016/QĐ-UBND Quyết định số 53/2016/QĐ-UBND Về mức thu, cơ quan tổ chức thu, chế độ thu, nộp, quản lý và sử dụng phí sử dụng công trình kết cấu hạ tầng, công trình dịch vụ, tiện ích công cộng trong khu vực cửa khẩu trên địa bàn tỉnh Lạng Sơn Hết hiệu lực 44/2016/QĐ-UBND Quyết định số 44/2016/QĐ-UBND Ban hành Quy định một số nội dung về cấp giấy phép xây dựng trên địa bàn tỉnh Khánh Hòa. Hết hiệu lực 07/2016/QĐ-UBND Quyết định số 07/2016/QĐ-UBND Ban hành quy định về quản lý và sử dụng chung công trình hạ tầng kỹ thuật đô thị trên địa bàn tỉnh nghệ an Còn hiệu lực 18/2016/QĐ-UBND Quyết định số 18/2016/QĐ-UBND Về việc phê duyệt mức thu học phí tại các cơ sở giáo dục đại học, cao đẳng, trung cấp chuyên nghiệp công lập thuộc tỉnh Thái Bình quản lý từ năm học 2016 - 2017 đến năm học 2020-2021 Hết hiệu lực 43/2016/QĐ-UBND Quyết định số 43/2016/QĐ-UBND Về việc điều chỉnh, bổ sung một số nội dung tại bản Quy định kèm theo Quyết định số 30/2014/QĐ-UBND ngày 21/12/2014 của UBND tỉnh về việc ban hành quy định giá các loại đất năm 2015 ổn định 5 năm 2015-2019 trên địa bàn tỉnh Khánh Hòa. Hết hiệu lực 24/2015/QĐ-UBND Quyết định số 24/2015/QĐ-UBND Ban hành Quy định về bồi thường chi phí hỗ trợ của cán bộ, công chức, viên chức, sinh viên thuộc diện được áp dụng các chế độ hỗ trợ đào tạo, bồi dưỡng cán bộ, công chức, viên chức; xây dựng nguồn cán bộ quy hoạch dự bị dài hạn và thu hút nhân tài trên địa bàn tỉnh khi vi phạm cam kết. Hết hiệu lực 33/2015/QĐ-UBND Quyết định số 33/2015/QĐ-UBND Ban hành Quy định về quản lý tài nguyên nước trên địa bàn tỉnh Khánh Hòa Còn hiệu lực

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.