Circular No. 38/2015/TT-BGTVT amends and supplements certain articles of Circular No. 11/2014/TT-BGTVT on the design, construction, and acceptance of rural suspension bridges. The document specifies technical requirements for the construction of suspension bridges, including the main cable system, anti-sway ropes, bridge location, vehicle and pedestrian load, crown of the bridge deck, and longitudinal slope at the approach road.
Scope of application
Organizations and individuals related to the design, construction, and acceptance of rural suspension bridges.
Key points
- For projects constructing rural suspension bridges → must arrange the main cable system and vertical and horizontal anti-sway ropes for the girder bridge deck; anti-sway ropes need not be arranged in specific cases.
- For rural suspension bridges in mountainous areas → shall not be located upstream of waterfalls, at least 2 km away from waterfalls or the piers must be placed higher than the waterfall crest with special protection measures.
- For rural suspension bridges → the vehicle and pedestrian load factor is taken as 1.5; impact effects of pedestrian and simple vehicle loads are not considered.
- For the bridge deck after completion → the relative crown must reach a value not less than 1.5L/100.
- For the approach road → the longitudinal slope varies according to local conditions and shall not exceed 11%; in particularly difficult terrain conditions, the maximum slope may be relaxed to 15%.
🌐 Social impact of this document
- Positive impact: Ensuring safety and quality of rural suspension bridge projects, contributing to the development of rural transportation.
- Negative impact: Construction costs may increase due to higher technical requirements.
- Beneficiaries: Rural residents can safely and conveniently use the suspension bridges.
- Affected parties: Project sponsors and construction units must comply with new regulations.
❓ Frequently asked questions
What requirements are there for the location of rural suspension bridges in mountainous areas?
They shall not be located upstream of waterfalls; if necessary, they must be at least 2 km away from waterfalls or the piers must be placed higher than the waterfall crest with special protective measures.
What is the load factor for vehicles and pedestrians on rural suspension bridges?
The load factor for vehicles and pedestrians is taken as 1.5; impact effects of pedestrian and simple vehicle loads are not considered.
What value must the relative crown of the bridge deck after completion reach?
The relative crown of the bridge deck after completion must reach a value not less than 1.5L/100.
What are the requirements for the longitudinal slope of the approach road?
The longitudinal slope of the approach road varies according to local conditions and shall not exceed 11%; in particularly difficult terrain conditions, the maximum slope may be relaxed to 15%.
Where should rural suspension bridges not be located?
Rural suspension bridges shall not be located within a 1 km radius from hydropower dam areas. In necessary cases, hydropower parameters must be provided to ensure the stability of the project.
Full text
|
BỘTRANSPORTATION |
SOCIALIST REPUBLIC OF VIET NAM |
|
Number: 38/2015/TT-BGTVT |
Hanoion 30 month 7(VND/kWh); 2015 |
CIRCULAR
Amending and supplementing some articles of Circular No. 11/2014/TT-BGTVT
dated April 29, 2014, issued by the Minister of Transport guiding the design, construction, and acceptance of rural suspension bridges
work on the design, construction, and acceptance of pedestrian suspension bridges
Based on the Construction Law 2014;
WHEREAS, Decree No. 46/2015/NĐ-CP dated May 12, 2015 of the Government on quality management and maintenance of construction works;
Pursuant to Decree No. 107/2012/NĐ-CP dated December 20, 2012 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Transport;
At the proposal of the Director General of the Vietnam Highway Administration and the Director of the Science and Technology Department,
The Minister of Transport issues this Circular amending and supplementing some articles of Circular No. 11/2014/TT-BGTVT dated April 29, 2014, issued by the Minister of Transport guiding the design, construction, and acceptance of rural suspension bridges.
Article 1. Amending and supplementing some articles of Circular No. 11/2014/TT-BGTVT dated April 29, 2014, issued by the Minister of Transport guiding the design, construction, and acceptance of rural suspension bridges
1. Amending and supplementing Point d, Point đ Clause 10 Article 4 as follows:
“d) In addition to the main cable system, vertical and horizontal vibration-resistant cables must be arranged for the bridge deck beams.
đ) For spans ≤ 50 m or with a ratio B/L ≥ 1/25, horizontal vibration-resistant cables may not be required; for spans 50m < L ≤ 80 m or with a ratio 1/35 ≤ B/L < 1/25, both vertical and horizontal vibration-resistant cables can be arranged simultaneously; for spans > 80m or with a ratio B/L < 1/35, separate vertical and horizontal vibration-resistant cables must be arranged to ensure stability.”
2. Amending and supplementing Clause 4, Clause 8 Article 5 as follows:
“4. Bridges in mountainous areas should not be located upstream of waterfalls; if necessary, they must be at least 2 km away from the waterfall or the bridge piers must be placed higher than the top of the waterfall, and special protective measures must be taken for people and vehicles passing through the bridge.”
“8. Rural suspension bridges shall not be located within a 1 km radius from hydropower dam areas. If necessary, hydropower parameters must be provided to ensure the stability of the structure.”
3. Amending and supplementing Point b Clause 2 Article 8 as follows:
“b) The load factor for vehicles and pedestrians is set at 1.5; the impact effect of live loads from pedestrians and simple vehicles will not be considered.”
4. Amending and supplementing Clause 4 and Clause 8 Article 9 as follows:
“4. The relative crown of the bridge deck after completion must reach a value not less than 1.5L/100.”
“8. The longitudinal slope of the approach road to the bridge, depending on local conditions, shall not exceed 11%. In particularly difficult terrain cases, the maximum longitudinal slope may be relaxed to 15%.”
5. Amending and supplementing Point đ Clause 1 Article 13 as follows:
“đ) The safety factor of the main cable for limit state design is taken as 0.6.”
Article 2. Repealing Clause 4 Article 6 and Clause 4 Article 15 of Circular No. 11/2014/TT-BGTVT dated April 29, 2014, issued by the Minister of Transport guiding the design, construction, and acceptance of rural suspension bridges
Article 3. Effectiveness and Responsibility for Implementation
1. This Circular takes effect from September 15, 2015.
2. For projects that have already been approved for tendering plans, Circular No. 11/2014/TT-BGTVT dated April 29, 2014, issued by the Minister of Transport guiding the design, construction, and acceptance of rural suspension bridges shall continue to apply.
3. The Head of the Ministry's Office, the Inspector General of the Ministry, the Heads of Departments, the Director General of the Vietnam Highway Administration, the Director of the Construction Management and Quality Control Department of Transportation Infrastructure, the Heads of agencies and units under the Ministry of Transport, the Directors of Provincial and Municipal Departments of Transport, relevant organizations, and individuals are responsible for implementing this Circular.
4. The Vietnam Highway Administration is responsible for monitoring the implementation of the provisions of this Circular.
5. During the implementation process, if there are any difficulties, organizations and individuals should report them to the Ministry of Transport for consideration and resolution./.
|
THE MINISTER |