Circular No. 49/2013/TT-BTNMT amending and supplementing certain provisions of the Economic and Technical Standards for Soil Degradation Investigation issued together with Circular No. 15/2012/TT-BTNMT. This document applies to organizations and individuals conducting soil degradation investigation work and sampling.
Scope of application
Organizations and individuals conducting soil degradation investigation work and sampling.
Key points
- It is necessary to determine information, content, and number of survey points on-site: Group 3 work (1KTV6, 1KS3, 1LX5).
- Determine information on the map: Group 2 work (1KTV6, 1KS3).
- The labor quota for soil investigation and sampling is 0.10 Group 4 work (2KTV6, 1KS3, 1LX5) per sample.
- The percentage structure of tool, material, and equipment quotas for each step of work.
- The labor quota for analyzing soil sample indicators is 0.30 KS5 work per indicator (equivalent to 3.6 KS5 work per sample for 12 indicators).
🌐 Social impact of this document
- Reduce the labor burden and costs for organizations conducting soil investigation and sampling.
- Increase the efficiency of soil degradation assessment through the supplementation of specific quotas.
❓ Frequently asked questions
Which group is designated to determine information on-site?
The subject that needs to determine information, content, and number of survey points on-site: Group 3 work (1KTV6, 1KS3, 1LX5).
What is the labor quota for soil sampling?
The labor quota for soil investigation and sampling is 0.10 Group 4 work (2KTV6, 1KS3, 1LX5) per sample.
What contents does the percentage structure of tool quotas include?
The percentage structure of tool quotas for each step of work includes collecting documents (14.02%), field investigation and survey (88.80%) including soil sampling (7.72%).
What is the labor quota for analyzing soil sample indicators?
The labor quota for analyzing soil sample indicators is 0.30 KS5 work per indicator (equivalent to 3.6 KS5 work per sample for 12 indicators).
When does this circular take effect?
This circular takes effect from February 9, 2014.
Full text
|
MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT |
SOCIALIST REPUBLIC OF VIET NAM |
|
Number: 49/2013/TT-BTNMT |
Hanoi, December 26, 2013 |
CIRCULAR
Amending and supplementing certain provisions of the Economic and Technical Standards for Soil Degradation Investigation issued together with Circular No. 15/2012/TT-BTNMT
dated November 26, 2012 of the Minister of Natural Resources and Environment
dated November 26 2013 of the Minister of Natural Resources and Environment
Pursuant to DecreeNo. concerning the functions of the Ministry of Natural Resources and Environment;June 2024;pursuant to Resolution No. 3/2013/ND-CP dated March 3, 2013 of the Government on the functions, tasks, and regulationsonvề nhiệm vụ và cơ cấu tổ chức của Bộ Tài nguyên và Môi trường;
/2013/QĐ-TTgNo. 43/2010/QĐ-TTg dated June 2, 2010 of the Prime Minister on the issuance of the system of indicators for statistical reportingJune 2024;Decision No. 6/2010 of the Prime Minister on issuing the system of criteria and indicatorsNo.for assessmentNo.reportingNo.ational;
At the proposal of the Director General of the Land Administration Department, the Head of the Planning Division, and the Head of the Legal Affairs Divisionintention of the Ministry of Natural Resources and Environment, the Minister of Natural Resources and Environment issues this Circular amending and supplementing certain provisions of the Economic and Technical Standards for Soil Degradation Investigation issued together with Circular No. 15/2012/TT-BTNMT dated November 26, 2012 of the Minister of Natural Resources and Environment.policies 1. Amending and supplementing the staffing norms at Point 5.2 Step 1 Clause 1.1 Section 1 Chapter I Part II and Point 5.2 Step 1 Clause 1.1 Section 1 Chapter II Part II of the Standards as follows:;
"5.2. Preliminary survey and determination of information, contents, number of points for investigation, soil sampling points, areas requiring investigation on-site.No. 5.2.1. Preliminary survey of contents, number of points, areas requiring investigation on-site: Group 3 staff (1KTV6, 1KS3, 1LX5).June 2024;pursuant to Decisionshallamending and supplementing certain articles of the Civil Servants Law and the Civil Servants Law dated November 25, 2019;of the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs5.2.2. Determination of information, contents, number of points, areas requiring investigation on-site and mapping onto the map: Group 2 staff (1KTV6, 1KS3)."June 2024;2. Supplementing the labor norms for investigation and soil sampling into Point 1 Step 2 Clause 1.1 Section 1 Chapter I Part II and Point 1 Step 2 Clause 1.1 Section 1 Chapter II Part II of the Standards as follows:,
Article 1. "Labor norm for investigation and soil sampling is 0.10 Group 4 staff (2KTV6, 1KS3, 1LX5) per soil sample."
3. Supplementing Points 1.2.1a, Points 1.2.2a, Points 1.2.3a into Clause 1.2 Section 1 Chapter I Part II and Clause 1.2 Section 1 Chapter II Part II; Points 2.2.1a, Points 2.2.2a, Points 2.2.3a into Clause 2.2 Section 2 Chapter I Part II and Clause 2.2 Section 2 Chapter II Part II of the Standards as follows:
"1.2.1a. Structure of percentage norms for tools
Percentage
Office work
Field work
Step 1: Collecting documents
Step 2: On-site investigation and survey
In which: Soil sampling
|
Content of work |
Step 3: Office work |
|
|
Building maps of eroded land due to rain |
Building maps of salinized and acidified land |
|
|
"1.2.2a. Structure of percentage norms for materials |
14,02 |
11,20 |
|
"1.2.3a. Structure of percentage norms for equipment |
|
88,80 |
|
"2.2.1a. Structure of percentage norms for toolsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs"2.2.2a. Structure of percentage norms for materials |
|
7,72 |
|
"2.2.3a. Structure of percentage norms for equipment |
85,98 |
|
|
Where: |
|
|
|
4. Amending the labor norms for analyzing soil sample indicators at Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter I Part II and Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter II Part II as follows: |
5,38 |
|
|
"Labor norm for analyzing soil sample indicators is 0.30 KS5 staff per indicator (equivalent to 3.6 KS5 staff per soil sample/12 indicators)." |
3,91 |
|
"
5. Supplementing columns 9 and 10 into Points 1.3.1, Points 1.3.2, Points 1.3.3 Clause 1.3 Section 1; Points 2.3.1, Points 2.3.2, Points 2.3.3 Clause 2.3 Section 2 Chapter I Part II and Points 1.3.1, Points 1.3.2, Points 1.3.3 Clause 1.3 Section 1; Points 2.3.1, Points 2.3.2, Points 2.3.3 Clause 2.3 Section 2 Chapter II Part II as follows:
|
Content of work |
Step 3: Office work |
|
|
Building maps of eroded land due to rain |
Building maps of salinized and acidified land |
|
|
"1.2.2a. Structure of percentage norms for materials |
16,96 |
12,98 |
|
"1.2.3a. Structure of percentage norms for equipment |
|
87,02 |
|
"2.2.1a. Structure of percentage norms for toolsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs"2.2.2a. Structure of percentage norms for materials |
|
3,78 |
|
"2.2.3a. Structure of percentage norms for equipment |
83,04 |
|
|
Where: |
|
|
|
4. Amending the labor norms for analyzing soil sample indicators at Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter I Part II and Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter II Part II as follows: |
5,39 |
|
|
"Labor norm for analyzing soil sample indicators is 0.30 KS5 staff per indicator (equivalent to 3.6 KS5 staff per soil sample/12 indicators)." |
3,92 |
|
"
2D41
|
Content of work |
Step 3: Office work |
|
|
Building maps of eroded land due to rain |
Building maps of salinized and acidified land |
|
|
"1.2.2a. Structure of percentage norms for materials |
38,84 |
13,08 |
|
"1.2.3a. Structure of percentage norms for equipment |
|
86,92 |
|
"2.2.1a. Structure of percentage norms for toolsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs"2.2.2a. Structure of percentage norms for materials |
|
4,28 |
|
"2.2.3a. Structure of percentage norms for equipment |
61,16 |
|
|
Where: |
|
|
|
4. Amending the labor norms for analyzing soil sample indicators at Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter I Part II and Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter II Part II as follows: |
5,39 |
|
|
"Labor norm for analyzing soil sample indicators is 0.30 KS5 staff per indicator (equivalent to 3.6 KS5 staff per soil sample/12 indicators)." |
3,92 |
|
"
Total soluble salts (measured by machine)
|
Content of work |
Step 3: Office work |
|
|
Building maps of eroded land due to rain |
Building maps of salinized and acidified land |
|
|
"1.2.2a. Structure of percentage norms for materials |
15,91 |
17,33 |
|
"1.2.3a. Structure of percentage norms for equipment |
|
82,67 |
|
"2.2.1a. Structure of percentage norms for toolsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs"2.2.2a. Structure of percentage norms for materials |
|
18,82 |
|
"2.2.3a. Structure of percentage norms for equipment |
84,09 |
|
|
Where: |
|
|
|
4. Amending the labor norms for analyzing soil sample indicators at Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter I Part II and Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter II Part II as follows: |
5,18 |
|
|
"Labor norm for analyzing soil sample indicators is 0.30 KS5 staff per indicator (equivalent to 3.6 KS5 staff per soil sample/12 indicators)." |
3,72 |
|
"
As 2D4d
|
Content of work |
Step 3: Office work |
|
|
Building maps of eroded land due to rain |
Building maps of salinized and acidified land |
|
|
"1.2.2a. Structure of percentage norms for materials |
6,19 |
22,02 |
|
"1.2.3a. Structure of percentage norms for equipment |
|
77,98 |
|
"2.2.1a. Structure of percentage norms for toolsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs"2.2.2a. Structure of percentage norms for materials |
|
15,56 |
|
"2.2.3a. Structure of percentage norms for equipment |
93,81 |
|
|
Where: |
|
|
|
4. Amending the labor norms for analyzing soil sample indicators at Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter I Part II and Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter II Part II as follows: |
9,10 |
|
|
"Labor norm for analyzing soil sample indicators is 0.30 KS5 staff per indicator (equivalent to 3.6 KS5 staff per soil sample/12 indicators)." |
9,10 |
|
"
2D4b
|
Content of work |
Step 3: Office work |
|
|
Building maps of eroded land due to rain |
Building maps of salinized and acidified land |
|
|
"1.2.2a. Structure of percentage norms for materials |
16,65 |
22,05 |
|
"1.2.3a. Structure of percentage norms for equipment |
|
77,95 |
|
"2.2.1a. Structure of percentage norms for toolsof the Government stipulating functions, tasks, powers, and organizational structure of the Ministry of Home Affairs"2.2.2a. Structure of percentage norms for materials |
|
15,58 |
|
"2.2.3a. Structure of percentage norms for equipment |
83,35 |
|
|
Where: |
|
|
|
4. Amending the labor norms for analyzing soil sample indicators at Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter I Part II and Points 1.1 Step 3 Clause 1.1 Section 1, Points 1.1 Step 3 Clause 1.1 Section 2 Chapter II Part II as follows: |
9,10 |
|
|
"Labor norm for analyzing soil sample indicators is 0.30 KS5 staff per indicator (equivalent to 3.6 KS5 staff per soil sample/12 indicators)." |
9,10 |
|
"
Total sulfur (APHA 4500-S04)
This Circular takes effect from February 9, 2014.
5. Supplement columns number 9 and 10 to Points 1.3.1, Point 1.3.2, Point 1.3.3 Clause 1.3 Section 1; Points 2.3.1, Point 2.3.2, Point 2.3.3 Clause 2.3 Section 2 Chapter I Part II and Points 1.3.1, Point 1.3.2, Point 1.3.3 Clause 1.3 Section 1; Points 2.3.1, Point 2.3.2, Point 2.3.3 Clause 2.3 Section 2 Chapter II Part II as follows:
"
|
9 |
Total dissolved solids (measured by machine) |
As 2D4d |
|
|
|
2D4b |
|
10 |
Total sulfur (APHA 4500-S04) |
This Circular takes effect from February 9, 2014. |
|
|
|
2D4b |
"
Article 2. This Circular takes effect from February 9, 2014.
Article 3. Ministries, ministerial-level agencies, agencies under the Government, People's Committees of provinces and centrally-run cities, and relevant organizations and individuals are responsible for implementing this Circular./.
|
DEPUTY MINISTER
DEPUTY MINISTER
Nguyen Manh Hien
|
Original document (PDF)
Download
Relations map
Click a document to open. A red border = a relation that changes validity.
Translations
This document is available in the following languages: