Circular No. 67/2025/TT-BXD on the procedures and formalities for managing, using, and exploiting infrastructure assets of parks and green spaces invested in and managed by the State.

This is a regulatory document concerning the management and exploitation of infrastructure asset properties of parks. The document includes contents such as legal basis, current status of property management and usage, proposals for asset exploitation schemes, evaluation of the effectiveness of exploitation schemes, and finally recommendations to implement the project.

文号67/2025/TT-BXD
文件类型Circular
发布机关Ministry of Construction
签署人Nguyễn Tường Văn — Thứ trưởng
更新11/06/2026
发布日期31/12/2025
生效日期31/12/2025
失效日期
状态In effect
✦ 智能摘要

This is a regulatory document concerning the management and exploitation of infrastructure asset properties of parks. The document includes contents such as legal basis, current status of property management and usage, proposals for asset exploitation schemes, evaluation of the effectiveness of exploitation schemes, and finally recommendations to implement the project.

适用范围

This document applies to units entrusted with managing infrastructure asset properties of parks.

要点

  • Legal basis: Law on Management and Use of Public Assets and Decree No. 258/2025/NĐ-CP
  • Current status of management and usage of infrastructure asset properties of parks
  • The asset exploitation scheme includes the list of assets proposed for exploitation, investment project content, upgrade and expansion plans, exploitation period, and payment methods.
  • Evaluation of the effectiveness of the exploitation scheme regarding its alignment with assigned functions and tasks, related income and expenditure from asset exploitation, and anticipated revenue to the state budget.
  • Recommendations for implementing the project

🌐 本文件的社会影响

  • Effective development of parks
  • Increase revenue for the state budget through the exploitation of infrastructure asset properties of parks.
  • Ensure consistency between the exploitation scheme and assigned functions and tasks.

❓ 常见问题

Who does this document apply to?

It applies to units entrusted with managing infrastructure asset properties of parks.

What legal bases are mentioned in the document?

Law on Management and Use of Public Assets and Decree No. 258/2025/NĐ-CP

What are the main contents of the asset exploitation scheme?

List of assets proposed for exploitation, investment project content, upgrade and expansion plans, exploitation period, and payment methods.

全文

MINISTRY OF CONSTRUCTION
-------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
---------------

Number: 67/2025/TT-BXD

Hanoi, December 31, 2025

CIRCULAR

REGULATIONS ON PROCEDURES AND FORMALITIES IN THE MANAGEMENT, USE, AND EXPLOITATION OF INFRASTRUCTURE ASSETS OF PARKS AND GREEN SPACES FUNDED AND MANAGED BY THE STATE

Pursuant to the Law on Management and Use of State Property No. 150/2017/QH14 amended and supplemented by Laws No. 64/2020/QH14, No. 07/2022/QH15, No. 24/2023/QH15, No. 31/2024/QH15, No. 43/2024/QH15, No. 56/2024/QH15, and No. 90/2025/QH15 90/2025/QH15;

Pursuant to Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green spaces, and water surfaces; Government on the management of parks, green trees, and water surfaces;

Pursuant to Decree No. 33/2025/NĐ-CP dated February 25, 2025 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Construction; The Government shall specify the functions, tasks, powers, and organizational structure of the Ministry of Construction;

At the proposal of the Director of the Infrastructure Construction Department;

The Minister of Construction issues this Circular regulating procedures and formalities in the management, use, and exploitation of infrastructure assets of parks and green spaces funded and managed by the State as prescribed in Clause 5, Article 36, Clause 7, Article 39, Clause 7, Article 40, and Clause 5, Article 41 of Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green spaces, and water surfaces.

PART I

GENERAL PROVISIONS

Article 1. Scope of Regulation and Applicability

1. This Circular regulates procedures and formalities in the management, use, and exploitation of infrastructure assets of parks and green spaces funded and managed by the State as prescribed in Clause 5, Article 36, Clause 7, Article 39, Clause 7, Article 40, and Clause 5, Article 41 of Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green spaces, and water surfaces, including: procedures and formalities for transferring management of infrastructure assets of parks and green spaces; procedures and formalities for handling infrastructure assets of parks and green spaces; procedures and formalities for preparing and approving lease exploitation plans for infrastructure assets of parks; procedures and formalities for preparing and approving transfer exploitation plans with a time limit for infrastructure assets of parks.

2. This Circular applies to agencies, units, organizations, and individuals related to the implementation of procedures and formalities in the management, use, and exploitation of infrastructure assets of parks and green spaces funded and managed by the State as prescribed in Clause 1 of this Circular.

Article 2. Interpretation of Terms

1. The specialized agency for parks and green spaces under the provincial People's Committee is the Department of Construction.

2. The specialized agency for parks and green spaces under the district People's Committee is the Economic Office or the Economic, Infrastructure, and Urban Development Office.

3. The competent People's Committee is the provincial People's Committee or the district People's Committee authorized to transfer management, approve exploitation plans, and handle infrastructure assets of parks and green spaces according to Article 35 of Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green spaces, and water surfaces.

Article 3. General Provisions on the Implementation of Procedures and Formalities in the Management, Use, and Exploitation of Infrastructure Assets of Parks and Green Spaces Funded and Managed by the State

1. The implementation of procedures and formalities in the management, use, and exploitation of infrastructure assets of parks and green spaces funded and managed by the State as prescribed in this Circular shall be carried out through direct or online methods on electronic platforms.

2. Priority shall be given to implementing procedures and formalities in the management, use, and exploitation of infrastructure assets of parks and green spaces funded and managed by the State on electronic platforms. Electronic files and results have the same legal effect as paper versions.

3. Agencies and units preparing application files shall be responsible under the law for the legality, accuracy, and truthfulness of the content of the files and documents sent to the competent People's Committee. Application documents and file components required to be submitted online on electronic platforms according to this Circular must be authenticated in accordance with the law on electronic transactions.

4. The time limit for examination and decision-making by the competent People's Committee specified in this Circular does not include holidays when the number of holidays during the examination and decision-making period exceeds three days.

Chapter II

PROCEDURES AND FORMALITIES IN THE MANAGEMENT, USE, AND EXPLOITATION OF INFRASTRUCTURE ASSETS OF PARKS AND GREEN SPACES FUNDED AND MANAGED BY THE STATE

Article 4. Procedures and formalities for transferring management of park and green space infrastructure assets

1. Procedures and formalities for transferring management of park and green space infrastructure assets:

a) The project investor developing parks and green spaces (for new park and green space infrastructure assets invested in by the State) or the unit currently managing the assets (for existing park and green space infrastructure assets or those transferred to State management) shall take the lead and coordinate with relevant agencies to prepare the asset management transfer proposal file in accordance with Clause 2 of this Article and submit it to the competent People's Committee for consideration and decision;

b) Within thirty days from the date of receiving all necessary documents, the competent People's Committee shall issue a decision on transferring management of park and green space infrastructure assets in accordance with Clause 3 of this Article or provide a response letter in cases where the asset transfer request is not appropriate;

c) Within thirty days from the date of the People's Committee's asset transfer decision, the handover and acceptance of park and green space infrastructure assets shall be recorded in a handover and acceptance record in Form No. 01 of the Appendix attached hereto and implemented in accordance with Clause 4 of Article 36 of Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green spaces, and water surfaces.

2. Documents for requesting asset management transfer include:

a) A document requesting the transfer of management of park and green space infrastructure assets (clearly identifying the entity to manage the assets): One original copy;

b) List of assets proposed for management transfer according to the Appendix in Form No. 01 of the Appendix attached hereto: One original copy;

c) Legal documents of the assets proposed for management transfer (Decision on asset transfer, asset reallocation; Decision establishing public ownership; Handover and acceptance records or other documents proving management, usage, temporary management rights of the assets - if applicable): One certified copy;

d) Other related documents concerning the assets proposed for management transfer (if applicable): One certified copy.

đ) Draft Decision on asset transfer in accordance with Clause 3 of this Article: One certified copy.

3. Main contents of the asset transfer decision:

a) Name of the unit currently managing the assets (if applicable); Name of the unit to which the assets will be transferred;

b) List of assets to be transferred;

c) Responsibilities for implementation organization.

Article 5. Procedures and formalities for handling park and green space infrastructure assets

1. Procedures and formalities for handling assets:

a) The unit managing the assets shall prepare a document requesting asset handling in accordance with Clause 2 of this Article and submit it to the competent People's Committee for consideration and decision;

b) Within forty-five days from the date of receiving all necessary documents, the competent People's Committee shall consider and decide on asset handling in accordance with Clause 3 of this Article or provide a response letter in cases where the asset handling request is not appropriate;

c) Within sixty days from the date of the People's Committee's asset handling decision, the unit managing the assets shall be responsible for organizing the auction of the assets in accordance with the law on asset auctions in cases of selling assets or organizing the receipt and transfer of assets in cases of asset reallocation or organizing a tender to select organizations or individuals to carry out demolition and disposal simultaneously with the sale of recovered materials or demolition and disposal of assets in cases where the assets have no further use value.

2. Documents for requesting asset handling include:

a) Document requesting asset handling by the unit managing the assets: One original copy;

b) List of assets proposed for handling according to Form No. 02 of the Appendix attached hereto: One original copy;

c) Proposal for asset handling method; starting price for auctioning assets for sale (if applicable); plan for managing and using proceeds from asset handling (if applicable) and estimated budget for handling the assets: One original copy;

d) Related legal documents:

- Document requesting asset handling by the asset operating unit in cases of voluntarily returning assets: One original copy;

- Document requesting receipt of assets by the receiving unit in cases of asset reallocation: One original copy;

- Record confirming lost or destroyed assets and supporting documents proving lost or destroyed assets in cases of lost or destroyed assets: One certified copy;

đ) Opinions of relevant agencies and other related documents (if applicable): One certified copy;

e) Draft Decision on asset handling in accordance with Clause 3 of this Article: One certified copy.

3. Main contents of the asset handling decision:

a) Name of the unit managing the assets;

b) Name of the unit expected to receive assets in cases of asset reallocation;

c) Handling method and reason (cause) for handling;

d) Starting price for auctioning assets for sale (if applicable); management and use of proceeds from asset handling (if applicable); budget for handling the assets;

đ) List of assets to be handled;

e) Responsibilities for implementation organization.

Article 6. Procedures and formalities for establishing and approving plans to lease the right to exploit infrastructure assets in parks

1. The procedures and formalities for establishing and approving plans to lease the right to exploit infrastructure assets in parks are as follows:

a) The unit entrusted with managing the assets shall be responsible for preparing the application file for approval of the plan to lease the right to exploit infrastructure assets in parks in accordance with Clause 2 of this Article and submitting it to the competent People's Committee for consideration and approval.

b) Within 45 days from the date of receiving all necessary documents, the competent People's Committee shall examine and decide on the approval of the plan to lease the right to exploit assets in accordance with Clause 3 of this Article, or issue a response letter in case the plan does not meet the requirements.

2. The application file for approval of the plan to lease the right to exploit infrastructure assets in parks includes:

a) The request document of the asset management unit: 01 original copy;

b) The plan to lease the right to exploit assets according to Model No. 03 attached to this Circular: 01 original copy;

c) Other related documents (if any): 01 copy;

d) Draft Decision on approval of the plan to lease the right to exploit assets in accordance with Clause 3 of this Article: 01 copy.

3. Main contents of the decision to approve the plan to lease the right to exploit assets:

a) Name of the unit managing the assets;

b) List of assets to be leased;

c) Duration and method of implementing the lease of the right to exploit assets;

d) Conditions for organizations participating in auctioning the lease of the right to exploit assets;

đ) Duration and method of payment for leasing the right to exploit assets;

e) Management and use of revenue from leasing the exploitation of assets;

g) Rights and responsibilities of the unit entrusted with managing the assets;

h) Responsibilities for organizing implementation.

Article 7. Procedures and formalities for establishing and approving plans to transfer the right to exploit infrastructure assets in parks for a limited period

1. The procedures and formalities for establishing and approving plans to transfer the right to exploit infrastructure assets in parks for a limited period are as follows:

a) The unit entrusted with managing the assets shall be responsible for preparing the application file for approval of the plan to transfer the right to exploit infrastructure assets in parks for a limited period in accordance with Clause 2 of this Article and submitting it to the competent People's Committee for consideration and approval.

b) Within 60 days from receipt of all necessary documents, the competent People's Committee shall examine and decide on the approval of the plan to transfer the right to exploit assets for a limited period in accordance with Clause 3 of this Article, or issue a response letter in case the plan does not meet the requirements.

2. The application file for approval of the plan to transfer the right to exploit infrastructure assets in parks for a limited period includes:

a) The request document of the asset management unit: 01 original copy;

b) The plan to transfer the right to exploit assets for a limited period according to Model No. 03 attached to this Circular: 01 original copy;

c) Other related documents (if any): 01 copy;

d) Draft Decision on approval of the plan to transfer the right to exploit assets for a limited period in accordance with Clause 3 of this Article: 01 copy.

3. Main contents of the decision to approve the plan to transfer the right to exploit infrastructure assets for a limited period:

a) Name of the unit managing the assets;

b) List of assets to be transferred for a limited period;

c) Basic content of construction projects planned to be invested in and upgraded, and other necessary contents;

d) Duration and method of implementing the transfer of the right to exploit assets for a limited period;

đ) Conditions for organizations participating in auctioning the transfer of the right to exploit assets for a limited period;

e) Duration and method of payment for transferring the right to exploit assets for a limited period;

g) Management and use of revenue from transferring the right to exploit assets for a limited period;

h) Rights and responsibilities of the unit entrusted with managing the assets;

i) Responsibilities for organizing implementation.

Chapter III

IMPLEMENTING PROVISIONS

Article 8. Transitional Provisions

For infrastructure assets of parks and greenery invested in and managed by the State, which were under the management of the People's Committee at the district level before July 1, 2025, and have not been transferred to management by the time this Circular takes effect, the People's Committee at the provincial level shall assign the Department of Construction to organize the preparation of documents for asset management transfer and submit them to the People's Committee at the provincial level for examination and decision on asset management transfer in accordance with point b and c, Clause 1, Article 4 of this Circular.

Article 9. Effective Date

1. This Circular takes effect from the date of signature.

2. In cases where legal normative documents cited in this Circular are amended, supplemented, or replaced, they shall be implemented in accordance with the corresponding provisions of the amended, supplemented, or replacing documents./.

Place of Receipt:
- Prime Minister, Deputy Prime Ministers;
- Ministries, ministerial-level agencies, and agencies under the Government;
- Central Party Office and Party Committees;
- General Secretary's Office;
- President's Office;
- National Assembly's Office;
- Provincial People's Councils, People's Committees;
- Supreme People's Court;
- Supreme People's Procuracy;
- State Audit Agency;
- Departments of Construction of provinces and cities;
- Official Gazette, Government website, Ministry of Construction website;
- To be filed: VT, KCHT.

DEPUTY MINISTER
DEPUTY MINISTER
(Signed)


Nguyen Tuong Van

 

ANNEX

SAMPLE DOCUMENT FOR MANAGEMENT, USE AND EXPLOITATION OF INFRASTRUCTURE ASSETS OF PARKS AND GREENERY
(Annexed to Circular No. 67/2025/TT-BXD dated November 30, 2025 of the Minister of Construction)

Form No. 01

Handover Record of Infrastructure Assets of Parks and Greenery

Form No. 02

List of Infrastructure Assets of Parks and Greenery for Processing

Form No. 03

Exploitation Plan for Infrastructure Assets of Parks

 

Form No. 01


SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
---------------

HANDOVER RECORD, RECEIPT
INFRASTRUCTURE ASSETS OF PARKS AND GREENERY

Based on the Law on Management and Use of Public Property...

Pursuant to Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green spaces, and water surfaces; Government on the management of parks, green trees, and water surfaces;

Based on Decision No. ... dated ... month ... year ... of ... regarding the matter of ... (1);

Today, on ... day ... month ... year ..., at ..., the handover of infrastructure assets of parks and greenery is carried out as follows:

I. PARTICIPANTS IN THE HANDOVER, RECEIPT

1. Representative of the transferring party(2):...................................................................................

Mr./Ms.:... Position:...

Mr./Ms.:... Position:...

2. Representative of the receiving party:.....................................................................................

Mr./Ms.:... Position:...

Mr./Ms.:... Position:...

3. Representative of the witnessing authority (if any):.....................................................

Mr./Ms.:... Position:...

Mr./Ms.:... Position:...

II. CONTENT OF THE HANDOVER

1. List of assets handed over: Attached as Annex.

2. Related documents concerning the management and use of the handed-over assets:

........................................................................................................................

3. Responsibilities of the parties:

a) Responsibilities of the transferring party:........................................................................

b) Responsibilities of the receiving party:.......................................................................

4. Opinions of the participating parties:

........................................................................................................................

The handover record is made in four copies. Each party (the receiving party and the transferring party) retains two copies, each having equal legal force.

 

REPRESENTATIVE OF THE RECEIVING PARTY
(Signature, full name, stamp)

REPRESENTATIVE OF THE TRANSFERRING PARTY
(Signature, full name, stamp)

REPRESENTATIVE OF THE WITNESSING AUTHORITY (if any)
(Signature, full name)

 

Note:

(1) Clearly state the number, date, and summary of the Decision on the transfer of management of infrastructure assets of parks and greenery by the competent authority.

(2) In cases where the unit currently managing the assets continues to be entrusted with the management of the assets, the representative of the transferring party is decided by the People's Committee with the appropriate authority.

 

ANNEX

LIST OF INFRASTRUCTURE ASSETS OF PARKS AND GREENERY TO BE HANDOVERD AND RECEIVED
(Location/Address of the asset: Park/Road/Section of road/Square/...)
(Attached to the Handover Record of Infrastructure Assets of Parks and Greenery)

I. LIST OF INFRASTRUCTURE ASSETS OF GREENERY

Serial number

Name of Asset

Unit of Measurement

Quantity/Volume

Year of Investment and Put Into Use

Original Cost (if applicable)

Value at Time of Handover

Condition of Asset

Remarks

Diameter of Tree Trunk at Standard Height for Shade Trees (m)

Condition

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

1

Living Standing Trees

 

 

 

 

 

 

 

 

2

Ancillary Equipment Attached to Trees (tree supports, security cameras,...)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

- Column (5): Five living standing trees planted or ancillary equipment attached to trees installed (if applicable).

- Column (7): Remaining value recorded in accounting books or value according to the appraisal result at the time of handover (if applicable).

- Column (9): Record for ancillary equipment attached to trees: In use or Out of service.

II. LIST OF OTHER INFRASTRUCTURE ASSETS OF PARKS

Serial number

Name of Asset

Unit of Measurement

Quantity/Volume

Year of Investment

Year of Putting Into Use

Land Area (m Usable Floor Area (m2)

Original Cost (if applicable) Construction Works2)

Equipment - Column (7): Land area in land allocation decisions, lease decisions, or documents of the competent authority or actual land area managed and used (applicable to assets that are buildings and land).

Value at Time of Handover

Condition of Asset

Remarks

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

1

- Column (8): Applicable to assets that are buildings attached to land.

 

 

 

 

 

 

 

 

 

 

2

- Column (10): Remaining value recorded in accounting books or value according to the appraisal result at the time of handover (if applicable).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

- Column (11): Record: In use or Out of service.

PEOPLE'S COMMITTEE ...

NAME OF UNIT ASSIGNED TO MANAGE ASSETS

LIST OF INFRASTRUCTURE ASSETS OF PARKS AND GREENERY FOR PROCESSING

 

Form No. 02

Value at Time of Processing Request
Disposal Method
-------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
---------------

 

Condition

I. LIST OF INFRASTRUCTURE ASSETS OF GREENERY

Serial number

Name of Asset

Unit of Measurement

Quantity/Volume

Year of Investment and Put Into Use

Equipment - Column (7): Land area in land allocation decisions, lease decisions, or documents of the competent authority or actual land area managed and used (applicable to assets that are buildings and land).

Trees

Condition of Asset

Ancillary Equipment

Remarks

Diameter of Tree Trunk at Standard Height for Shade Trees (m)

- Column (7): Remaining value recorded in accounting books or value according to the appraisal result at the time of processing request (if applicable). - Column (10): Record specific disposal methods in accordance with Article 87 of the Law on Management and Use of Public Property. For materials and supplies recovered from felling or relocating trees proposed for disposal through sale, clearly specify the auction, public tender, or designated sale method if a specific sale method has been determined.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

1

- Column (11): Record specific cases applied in accordance with Clause 1, Article 88, Clause 1, Article 89, Clause 1, Article 90, Clauses 1 and 2, Article 92, and Article 93 of the Law on Management and Use of Public Property.

 

 

 

 

 

 

 

 

 

2

Land Area (m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

- Column (5): Five living standing trees planted or ancillary equipment attached to trees installed (if applicable).

Usable Floor Area

- Column (9): Record for ancillary equipment attached to trees: In use or Out of service.

- Column (7): Land area in land allocation decisions, lease decisions, or documents of the competent authority or actual land area managed and used (applicable to assets that are buildings and land).

- Column (10): Remaining value recorded in accounting books or value according to the appraisal result at the time of processing request (if applicable).

 

II. LIST OF OTHER INFRASTRUCTURE ASSETS OF PARKS

Serial number

Name of Asset

Unit of Measurement

Quantity/Volume

Year of Investment

Year of Putting Into Use

- Column (12): Record specific disposal methods in accordance with Article 87 of the Law on Management and Use of Public Property.(1)- Column (13): Record specific cases applied in accordance with Clause 1, Article 88, Clause 1, Article 89, Clause 1, Article 90, Clauses 1 and 2, Article 92, and Article 93 of the Law on Management and Use of Public Property.2)

PREPARER(2)- Column (13): Record specific cases applied in accordance with Clause 1, Article 88, Clause 1, Article 89, Clause 1, Article 90, Clauses 1 and 2, Article 92, and Article 93 of the Law on Management and Use of Public Property.2)

Equipment - Column (7): Land area in land allocation decisions, lease decisions, or documents of the competent authority or actual land area managed and used (applicable to assets that are buildings and land).

Trees(3)

Condition of Asset(4)

Ancillary Equipment

Remarks

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

1

- Column (8): Applicable to assets that are buildings attached to land.

 

 

 

 

 

 

 

 

 

 

 

2

- Column (10): Remaining value recorded in accounting books or value according to the appraisal result at the time of handover (if applicable).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

..., day ... month ... year ...

HEAD OF THE UNIT ASSIGNED TO MANAGE

PEOPLE'S COMMITTEE ...

ASSETS

LIST OF INFRASTRUCTURE ASSETS OF PARKS AND GREENERY FOR PROCESSING

(Signature, full name, stamp)

NAME OF UNIT ASSIGNED TO MANAGE

 

ASSETS
(Signature, full name)

No.: No.: ... / ...-DA
PLAN FOR EXPLOITATION OF INFRASTRUCTURE ASSETS OF PARKS
(Exploitation Method: Lease or Transfer of Rights to Exploit Infrastructure Assets of Parks for a Limited Period)
I. BASIS FOR IMPLEMENTATION OF THE PLAN

 

Form No. 03

Value at Time of Processing Request
1. Legal Basis

- Law on Management and Use of Public Property...
-------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
---------------

- Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, greenery, and water surfaces;

No.: No.: ... / ...-DA

 

PROPOSAL FOR THE EXPLOITATION OF INFRASTRUCTURE ASSETS IN PARKS
(Exploitation method: Lease or transfer with a time limit the right to exploit infrastructure assets in parks)
---------------

I. BASIS FOR IMPLEMENTING THE PROPOSAL

1. Legal basis

- Law on Management and Use of Public Assets...;

- Decree No. 258/2025/NĐ-CP dated October 9, 2025 of the Government on the management of parks, green trees, and water surfaces;

- Other relevant documents related to the management, use, and exploitation of park infrastructure assets.

2. Practical basis

- The functions and tasks of the unit entrusted with managing the assets.

- The organizational structure of the unit entrusted with managing the assets.

- Results of asset exploitation for the two consecutive years prior to the year of developing the plan (revenue, expenses, state budget contributions, revenue-expense differences, etc.) of the unit entrusted with managing the assets (if available).

- Development plans for subsequent years.

II. MAIN CONTENT OF THE PROPOSAL

1. Current status of management and use of park infrastructure assets

1.1. Overview of park infrastructure assets proposed for exploitation in the plan.

1.2. Current status of asset exploitation: Description of the current status of asset exploitation and income from such exploitation (revenue, expenses, state budget contributions).

2. Proposal for exploiting park infrastructure assets

2.1. Asset exploitation plan

a) List of assets proposed for exploitation: name of asset; location; quantity, volume; year of investment, year of exploitation commencement; original cost, remaining value or value at the time of plan preparation according to valuation; asset condition (standard height trunk diameter for shade trees); method of asset exploitation (leasing exploitation rights/transferring exploitation rights with a term).

b) Content of approved investment projects for upgrading and expanding existing assets (for exploitation plans using the transferring exploitation rights with a term method).

c) Term of asset exploitation.

d) Basis and method for determining the initial price for leasing or transferring exploitation rights with a term.

đ) Auction implementation plan. e) Payment method.

g) Principles for handling upon expiration of the asset exploitation term or termination of the contract before the term.

2.2. Preliminary assessment of the effectiveness of the asset exploitation plan

a) The necessity and appropriateness of the exploitation plan in relation to assigned functions and tasks, legal regulations on the management and use of public assets, and related laws.

b) Expected results of park infrastructure asset exploitation: income, expenses related to asset exploitation (clarifying the basis and method for determining income and expenses);

c) Expected amount of state budget contribution;

d) Expected amount of funds prioritized for allocation from the state budget contributions (from asset exploitation) in the public investment plan and state budget expenditure estimate for new construction, upgrading, renovation, and development of park infrastructure assets.

III. PROPOSALS AND RECOMMENDATIONS FOR IMPLEMENTING THE PROPOSAL

........................................................................................................................

.................................................................................................................................

 

CONFIRMATION BY
SPECIALIZED ORGANIZATION ON PARKS AND GREEN SPACES
(Signature, full name, stamp)

HEAD OF THE UNIT
(Signature, full name, stamp)

 

 

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

下载

本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

关系图

↑ 依据及影响本文件的文件
依据 10
64/2020/QH14 Luật Đầu tư theo phương thức đối tác công tư số 64/2020/QH14 生效中 24/2023/QH15 Luật Viễn thông số 24/2023/QH15 生效中 31/2024/QH15 Luật Đất đai số 31/2024/QH15 生效中 43/2024/QH15 Luật Sửa đổi, bổ sung một số điều của Luật Đất đai số 31/2024/QH15, Luật Nhà ở số 27/2023/QH15, Luật Kinh doanh bất động sản số 29/2023/QH15 và Luật Các tổ chức tín dụng số 32/2024/QH15 số 43/2024/QH15 生效中 56/2024/QH15 Luật sửa đổi, bổ sung một số điều của Luật Chứng khoán, Luật Kế toán, Luật Kiểm toán độc lập, Luật Ngân sách Nhà nước, Luật Quản lý, sử dụng tài sản công, Luật Quản lý thuế, Luật Thuế thu nhập cá nhân, Luật Dự trữ quốc gia, Luật Xử lý vi phạm hành chính số 56/2024/QH15 已失效 90/2025/QH15 Luật Sửa đổi, bổ sung một số điều của Luật Đấu thầu, Luật Đầu tư theo phương thức đối tác công tư, Luật Hải quan, Luật Thuế giá trị gia tăng, Luật Thuế xuất khẩu, thuế nhập khẩu, Luật Đầu tư, Luật Đầu tư công, Luật Quản lý, sử dụng tài sản công số 90/2025/QH15 生效中 51/2026/QĐ-UBND Quyết định số 51/2026/QĐ-UBND Ban hành Quy định về quản lý công viên, cây xanh, mặt nước trên địa bàn tỉnh Đắk Lắk 生效中 157/2026/QĐ-UBND Quyết định 157/2026/QĐ-UBND của Cà Mau 生效中
67/2025/TT-BXD
Circular No. 67/2025/TT-BXD on the procedures and formalities for managing, using, and exploiting infrastructure assets of parks and green spaces invested in and managed by the State.
In effect

点击文件即可打开。红色边框=改变效力的关系。