Circular No. 12/2016/TT-BXD stipulates the files for planning tasks and plans for regional construction planning, urban planning, and special functional area construction planning.

These provisions detail the contents and components of the files for different types of construction planning, including general planning, district planning, and detailed planning. Each type of planning has specific requirements regarding drawings, descriptions, appendices, as well as implementation plans and schedules.

Số hiệu12/2016/TT-BXD
Loại văn bảnCircular
Cơ quan ban hànhMinistry of Construction
Người kýNguyễn Đình Toàn — Thứ trưởng
Cập nhật17/06/2026
Lĩnh vựcUncategorized
Ngày ban hành29/06/2016
Ngày áp dụng15/08/2016
Ngày hết hiệu lực01/01/2023
Tình trạngExpired
✦ Tóm lược thông minh

These provisions detail the contents and components of the files for different types of construction planning, including general planning, district planning, and detailed planning. Each type of planning has specific requirements regarding drawings, descriptions, appendices, as well as implementation plans and schedules.

Đối tượng áp dụng

These provisions apply to agencies, organizations, and individuals involved in the preparation, review, and approval of construction planning.

Các điểm cốt lõi

  • Article 15: Contents of the file for the general planning task.
  • Article 16: Contents of the file for the general planning plan.
  • Article 17: Contents of the file for the district and detailed planning task.
  • Article 18: Contents of the file for the district and detailed planning plan.
  • Requirements for drawings, descriptions, and appendices for each type of planning.
  • Implementation plans and schedules proposed for each type of planning.

🌐 Tác động xã hội từ văn bản này

  • To ensure the scientific nature, effectiveness, and consistency of construction planning.
  • To provide a legal basis for the preparation, review, and approval of construction planning.

❓ Câu hỏi thường gặp

What does the content of the file for the general planning task include?

It includes drawings (location diagrams of the planned area), descriptions, draft Petitions and Decisions approving the planning task.

For district construction planning, what current status maps are required?

Requirements include current status maps of architectural landscapes, land development assessments, and technical infrastructure systems.

Toàn văn

CIRCULAR

Regulations on the dossier for planning tasks and planning projects for regional construction, urban planning, and special functional area construction planning

________________________________________

Based on the Construction Law No. 50/2014/QH13; Urban Planning Law No. 30/2009/QH12;

Based on Decree No. 44/2015/NĐ-CP dated May 6, 2015 of the Government detailing certain contents regarding construction planning; Decree No. 37/2010/NĐ-CP dated April 7, 2010 of the Government on the preparation, review, approval, and management of urban planning;

Based on Decree No. 62/2013/NĐ-CP dated June 25, 2013 of the Government stipulating the functions, tasks, powers, and organizational structure of the Ministry of Construction,

At the proposal of the Director of the Department of Planning and Architecture;

The Minister of Construction issues this Circular to regulate the dossier for planning tasks and planning projects for regional construction, urban planning, and special functional area construction planning,

PART I

GENERAL PROVISIONS

Article 1. Scope of Regulation and Applicability

This Circular regulates the content of the dossier for planning tasks and planning projects for regional construction, urban planning, and special functional area construction planning.

All organizations and individuals within Vietnam and foreign entities directly participating or related to construction planning work on Vietnamese territory must comply with the provisions of this Circular.

Article 2. Content and presentation format

1. The presentation content for the explanatory notes and drawings of planning tasks and planning projects for regional construction, urban planning, and special functional area construction planning must be appropriate to each type of planning and comply with the provisions of Chapter II of this Circular.

2. The system of drawing symbols for planning tasks and planning projects for regional construction, urban planning, and special functional area construction planning must comply with the regulations set forth in the Appendix attached to this Circular.

Chapter II

CONTENT OF THE DOSSIER FOR PLANNING TASKS AND PLANNING PROJECTS FOR CONSTRUCTION

Section 1

Regional construction planning

The dossier for regional construction planning for inter-provincial regions, provincial regions, inter-district regions, district regions, special function regions, regions along expressways, and inter-provincial economic corridors shall be implemented according to the provisions of Section 1 of this Circular.

Article 3. Content of the dossier for regional construction planning tasks

1.   Drawings including: Diagram of location and relationship of the region; map of boundaries and scope of research for regional construction planning. Presented on a suitable topographic base map.

2.   Explanatory notes for regional construction planning tasks:

a)    Reasons and necessity for establishing the planning; basis for establishing the planning task; foundation for determining the scale, scope, and boundaries of the region for construction planning.

b)   Determination of viewpoints, goals of the planning; nature, function, and role of the region.

c)   Basic requirements for content, level of investigation, data collection, statistics, and evaluation of the current status of the region for planning.

d)   Basis and methods for determining the driving forces of development of the region; preliminary forecast on population, land, urbanization rate, socio-economic development...; proposal for selecting indicators for infrastructure, social infrastructure in the construction planning project.

e)    Requirements for spatial development orientation of the region for planning: System of cities, rural areas; special function zones (national level, provincial level); social infrastructure system, technical infrastructure at the regional level, and requirements for strategic environmental assessment in the construction planning project.

g) Determination of list of drawings, explanatory notes, appendices; quantity and format of dossier products; plan and schedule for organizing the planning.

3.   Draft Memorandum and draft Decision on approval of the planning task.

Article 4. Content of the urban planning master plan dossier

1. Components of the drawings:

a) Scheme of location and relationship of the region: The location, boundaries of the region, natural, economic-societal, and environmental relationships affecting the planned region. To be presented on a suitable scale topographic map.

b) Current condition schemes of the region: Natural conditions; current distribution of population and land use; current status of social infrastructure, technical infrastructure, and regional environment. To be presented on a topographic map at a scale of 1/100,000 or 1/250,000 for inter-provincial regions and a scale of 1/25,000 or 1/50,000 for other regions.

c) Schemes on spatial zoning and development orientation of the region: Identification of development areas, conservation areas, restricted development areas, prohibited development areas; description of the system of cities and rural residential areas; distribution and determination of the scale of industrial, agricultural, forestry development spaces; rest and tourism areas, natural resource exploitation and protection areas, cultural heritage areas, and other functions; distribution of regional economic-technical facilities. To be presented on a topographic map at a scale of 1/100,000 or 1/250,000 for inter-provincial regions and a scale of 1/25,000 or 1/50,000 for other regions.

d) Technical infrastructure orientation schemes at the regional level: Transportation, ground elevation, surface drainage, energy supply, telecommunications, water supply, waste management, and cemeteries. To be presented on a topographic map at a scale of 1/100,000 or 1/250,000 for inter-provincial regions and a scale of 1/25,000 or 1/50,000 for other regions.

đ) Drawings on strategic environmental assessment. To be presented on a suitable scale topographic map.

2. Explanation.

a) Reasons and necessity for establishing the regional construction planning; planning bases; viewpoints and development goals of the region.

b) Analysis and evaluation of natural conditions, current economic-societal status of the region; current distribution of urban and rural areas, demographic changes within the planned region; current land use and management; current status of social infrastructure, technical infrastructure, resources, and environment of the region; current status of investment programs and projects for the planned region; evaluation of the implementation of planning, resource management, and environmental protection work.

For inter-provincial, inter-district regions, along expressway corridors, and provincial economic corridors: Evaluation of cooperation and linkage development among provinces and districts within the region; clearly state the effectiveness and shortcomings in implementing development linkages in terms of planning management, serving as a basis for proposing solutions in the planning project.

The above contents must be clearly, concisely, comprehensively, and clearly presented, accompanied by illustrative diagrams and tables.

c) Determination of the driving forces and potential for development of the region.

d) Forecasting of economic-societal, demographic, labor force, urbanization rate, land use, and environmental conditions; risks related to fluctuations, natural disasters, etc.

đ) Spatial development orientation according to the region's development goals and nature. Specific content includes: Urban, industrial, economic zone, tourism, social infrastructure, conservation (natural scenery and cultural-historical heritage), rural, and land use zoning.

e) Orientation for developing the regional technical infrastructure system concerning transportation, ground elevation, surface drainage, energy supply, telecommunications, water supply, waste management, and cemeteries.

g) Identification of priority programs and projects for investment in technical infrastructure, social infrastructure, and environmental protection; projects must specify the scale of construction investment, forecast capital requirements, and propose funding sources.

h) Proposals for implementing the plan after approval by the competent authority. For regions including multiple provincial administrative units, it is necessary to propose management models and mechanisms for inter-provincial development linkage.

i) Strategic Environmental Assessment: Content as stipulated in Clause 1, Point g, Article 8 of Decree No. 44/2015/ND-CP dated May 6, 2015 of the Government detailing certain aspects of urban planning (hereinafter referred to as Decree No. 44/2015/ND-CP).

The explanatory report must include statistical tables, calculation appendices, illustrative images, and a system of diagrams and reduced-size A3 drawings with clear symbols and annotations, arranged alongside each section of the explanatory report.

3. Management regulations according to the regional urban planning: Content as stipulated in Article 9 of Decree No. 44/2015/ND-CP and must include accompanying diagrams.

4. Draft proposal and draft decision approving the planning project.

5. Appendices accompanying the explanatory report (additional explanations, arguments, and supporting data for the explanatory report; illustrative drawings; computational data). Appendices attach relevant legal documents.

Section 2

Urban Planning

Article 5. Content of the Master Plan Task File for Urban Areas

The master plan tasks for central cities directly under the Central Government, provincial cities, towns, and urban areas of type V that have not been recognized as towns shall be carried out in accordance with the provisions of this Article.

1. Drawings including: Diagram of location and regional connections, map of boundaries and scope of research for the overall urban planning. To be presented on a topographic map at an appropriate scale.

2. Explanation:

a) Reasons, necessity, basis for planning; location, scale, and boundaries of the overall urban planning.

b) Summarize the current status of the city, ongoing plans and projects; requirements for data collection; requirements for spatial development orientation, natural landscape conservation, heritage, historical sites, infrastructure projects, technical infrastructure, social infrastructure, and strategic environmental assessment. Propose some basic indicators regarding economic and social aspects to be studied at the project planning stage, meeting the goals, characteristics, and development orientation of the city.

c) Determine the nature, driving forces, and role of the city in the region and nationwide; planning viewpoints and objectives; identify issues to be addressed in the planning.

d) Preliminary forecast on socio-economic development, population, labor force, professions, land development in urban and rural areas, and technical infrastructure.

đ) Identify the list of drawings, explanations, and accompanying appendices; quantity and specifications of the file products; schedule and progress of organizing the planning process suitable for each type of city.

3. Draft Memorandum and draft Decision approving the planning task.

Article 6. Content of the Master Plan Project File for Urban Areas

1. For central cities directly under the Central Government

a) Drawing components:

- Location and regional connection diagram including: Location, scale, planning boundaries; relationship between the city and rural areas concerning natural conditions, socio-economic conditions; urban development space; key technical infrastructure. To be presented on a topographic map at an appropriate scale.

- Current status map: Land use, architectural landscape, social infrastructure system (education, healthcare, culture, commerce, green spaces, housing, etc.); transportation, power supply and lighting, telecommunications, water supply, ground level and stormwater drainage, sewage drainage; solid waste management, cemeteries, and environment. To be presented on a topographic map at a scale of 1/25,000 or 1/50,000.

- Map evaluating the suitability of construction land based on criteria such as terrain, current conditions, hydrogeology; evaluation of land use value (determining favorable, less favorable, and unfavorable areas for urban functions, etc.); identification of restricted and prohibited development zones. To be presented on a topographic map at a scale of 1/25,000 or 1/50,000.

- Urban development structure diagram (current status analysis diagrams and proposed options accompanied by explanations on selection criteria). To be presented at an appropriate scale.

- Overall urban spatial development orientation map. To be presented on a topographic map at a scale of 1/25,000 or 1/50,000.

- Overall urban technical infrastructure development orientation map. To be presented on a topographic map at a scale of 1/25,000 or 1/50,000.

- Land use planning and functional zoning map for the central urban area according to planning phases. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Maps outlining the development orientation of the central urban area's technical infrastructure and environmental protection systems. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Map outlining the development orientation of the central urban area's commercial, cultural, educational, healthcare, sports, training systems; green spaces, and central squares.

- Urban design drawings as stipulated by the Ministry of Construction in Circular No. 06/2013/TT-BXD dated May 13, 2013, guiding the content of Urban Design (hereinafter referred to as Circular No. 06/2013/TT-BXD).

- Strategic Environmental Assessment drawings: Current status and strategic environmental assessment. To be presented on a topographic map at an appropriate scale.

b) Explanation: The explanation content of the master plan project file for central cities directly under the Central Government includes:

- Analysis of location, evaluation of natural conditions; current population and land use status. Detailed evaluation of urban architectural landscape, social infrastructure, technical infrastructure, and environment; assessment of planning implementation and management; determination of fundamental issues to be resolved. Data must be summarized and presented through diagrams and tables accompanied by concise and clear explanations.

- Determination of objectives, nature, and driving forces of urban development.

- Determination of economic and technical indicators for the entire city, individual urban areas, and functional zones.

- Forecasting impacts of natural conditions, socio-economic factors, urban development, urbanization rate; population size, land, social infrastructure, technical infrastructure for the entire city, individual urban areas, and functional zones.

- Spatial development orientation: Determination of the structure of functional zones, regions, and other areas within the city (administrative centers, commercial centers, training centers, cultural and sports centers, entertainment centers, industrial centers, tourism centers, ecological centers, conservation centers, etc.); rural residential areas; determination of urban development axes and corridors; orientation for redevelopment of existing urban areas.

- Spatial development orientation for the central urban area: Development, renovation, and expansion direction of the central urban area; determination of the scope and scale of functional zones, density and land use planning indicators; principles for managing development of functional zones.

- Orientation for the development of infrastructure systems for commerce, culture, education, healthcare, sports, and training; green park systems, public spaces, and urban squares.

- Urban design in accordance with the provisions of the Ministry of Construction in Circular No. 06/2013/TT-BXD.

- Orientation for the planning and land use throughout the city and the central urban area according to different planning phases.

- Orientation for the development of urban technical infrastructure including: orientation for the development of technical infrastructure throughout the city and orientation for the development of technical infrastructure for the central urban area as a basis for implementing specialized urban technical infrastructure planning projects for centrally-administered cities.

- Strategic environmental assessment: Content as stipulated in Clause 7, Article 15 of Decree No. 37/2010/NĐ-CP dated April 7, 2010 of the Government on the establishment, review, approval, and management of urban planning (hereinafter referred to as Decree No. 37/2010/NĐ-CP).

- Urban economy: Arguments for determining the list of priority investment programs and projects according to different planning phases; proposals and recommendations for resources to implement these projects.

The explanatory report of the general urban planning project for centrally-administered cities must include statistical tables, calculation appendices, illustrative images, and a system of small-scale drawings at A3 size with clear symbols and annotations, arranged alongside the relevant sections of the explanatory report.

c) Appendices accompanying the explanatory report (further explanations, arguments, and supporting evidence for the explanatory report; illustrative drawings; calculation data). Appendices attached to related legal documents.

d) Management regulations according to the general urban planning project; Content as stipulated in Clause 1, Article 35 of the Urban Planning Law and must include small-scale drawings attached.

đ) Draft Memorandum and draft Decision approving the planning project.

2. For cities and towns under provinces

a) Drawing components:

- Location map and regional relationships: Determine the location and boundaries for planning; show economic and social relationships between the city and related regions; topographical conditions and areas affecting the urban architectural landscape; key technical infrastructure and other issues impacting urban development. Displayed on a suitable scale topographic map.

- Current status map; Land use, architectural landscape, social infrastructure system (education, healthcare, culture, commerce, greenery, housing, etc.); current traffic, power supply and lighting, water supply, ground level and stormwater drainage, sewage drainage; solid waste collection, cemeteries, environment. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Map evaluating the suitability of construction land based on criteria such as topography, current conditions, hydrogeology; evaluation of land use value: Identify favorable, less favorable, and unfavorable areas for urban functions; identify restricted and prohibited development zones. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Diagram of urban development structure (current status analysis diagrams and proposed options with explanations about selection criteria). Displayed at a suitable scale.

- Map of spatial urban development orientation. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Map of land use planning and functional zoning according to different planning phases. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Maps of infrastructure development orientation. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Urban design drawings in accordance with the provisions of the Ministry of Construction in Circular No. 06/2013/TT-BXD.

- Maps of strategic environmental assessment: Current status and strategic environmental assessment. Displayed on a suitable scale topographic map.

b) Explanatory Report: The content of the explanatory report of the general urban planning project for cities and towns under provinces includes:

- Analysis and evaluation of current natural conditions, population, land use, urban space, social infrastructure, technical infrastructure, and the environment; assessment of management and implementation according to approved plans; identification of fundamental issues to be addressed.

- Determination of objectives, nature, and driving forces of urban development.

- Determination of economic and technical indicators for the city and each functional zone.

- Forecasting the impact of natural conditions, socio-economic factors, urban development, urbanization rates; population size, land, social infrastructure, and technical infrastructure for the city and functional zones.

- Orientation for urban spatial development including: urban structure and direction of development (existing urban areas and new urban areas); determination of systems of centers (including underground space usage for underground construction), parks, green corridors, open spaces, central urban squares; orientation for rural residential area development; proposals for organizing space and architecture for architectural and scenic areas, main spatial axes, squares, city gates, urban landmarks; identification of the relationship between old and new urban spaces.

- Orientation for the development of infrastructure systems for commerce, culture, education, healthcare, sports, and training; green park systems, urban squares.

- Urban design in accordance with the provisions of the Ministry of Construction in Circular No. 06/2013/TT-BXD.

- Orientation for urban land use planning according to different planning phases.

- Orientation for the development of technical infrastructure including transportation, ground elevation, stormwater drainage, energy supply, telecommunications, water supply, wastewater treatment, solid waste management, and cemeteries.

- Strategic environmental assessment: Content as prescribed in Clause 7, Article 15 of Decree No. 37/2010/NĐ-CP.

- Urban economy: Arguments for determining the list of priority investment programs and projects according to different planning phases; proposals and recommendations for resources to implement these projects.

The explanatory report of the general urban planning scheme for cities under provinces and towns must include statistical tables, calculation appendices, illustrative images, and a system of small-scale drawings on A3 paper with symbols and annotations, arranged alongside the relevant sections of the explanatory report.

c) Appendices accompanying the explanatory report (explanations, additional arguments supporting the explanatory report; illustrative drawings; calculation data). Appendices attached to related legal documents.

d) Management regulations according to the general urban planning scheme: Content as prescribed in Clause 1, Article 35 of the Urban Planning Law and must include small-scale drawings attached.

đ) Draft Memorandum and draft Decision approving the planning project.

3. For towns and fifth-tier cities not yet recognized as towns.

a) Drawing components;

- Location and relationship diagram: Determine the planning location and boundaries; demonstrate economic and social relationships between the city and the region; geographical conditions, topography, significant areas affecting urban landscape architecture; key technical infrastructure and other issues impacting urban development. Presented on an appropriate scale topographic map.

- Current status map: Land use, architectural landscape, social infrastructure systems (education, healthcare, culture, commerce, green spaces, housing, etc.); current traffic, urban power supply and lighting, water supply, ground elevation, stormwater drainage, sewage; solid waste collection, cemeteries, environment. Presented on a 1/2,000 or 1/5,000 scale topographic map.

- Comprehensive evaluation map of construction land based on criteria from the explanatory report suitable for topography, current conditions, hydrogeology; evaluation of land use value: Identify favorable, less favorable, and unfavorable areas for urban functions; determine restricted and prohibited development zones. Presented on a 1/2,000 or 1/5,000 scale topographic map.

- Urban development structure diagram (current status analysis diagrams and proposed options with explanations about selection criteria). Presented at an appropriate scale.

- Urban spatial development orientation map. Presented on a 1/2,000 or 1/5,000 scale topographic map.

- Land use planning map and functional zoning according to planning phases. Presented on a 1/2,000 or 1/5,000 scale topographic map.

- Technical infrastructure development orientation maps. Presented on a 1/2,000 or 1/5,000 scale topographic map.

- Urban design drawings as stipulated by the Ministry of Construction in Circular No. 06/2013/TT-BXD.

- Maps of strategic environmental assessment: Current status and strategic environmental assessment. Displayed on a suitable scale topographic map.

b) Explanatory report:

The content of the explanatory report for the general urban planning scheme of towns and fifth-tier cities not yet recognized as towns includes:

- Analysis and evaluation of current natural conditions, population, land use, urban architectural landscape space, social infrastructure, technical infrastructure, and the environment; assessment of management and implementation according to approved plans; identification of fundamental issues to be addressed in the plan.

- Determination of objectives, nature, and driving forces of urban development.

- Selection of economic and technical indicators applicable in the plan.

- Forecasting of socio-economic trends, urbanization rates, population size, land, technical infrastructure, and social infrastructure.

- Orientation for urban spatial development including urban expansion and renovation directions; scope and scale of functional zones; determination of central areas, green parks, central squares, and open spaces; organization of architectural and landscape space for functional zones and main axes.

- Orientation for the development of commercial, cultural, educational, health, sports, training systems; park green spaces, public spaces, and urban squares.

- Urban design as stipulated by the Ministry of Construction in Circular No. 06/2013/TT-BXD.

- Orientation for urban land use planning according to different planning phases.

- Orientation for urban technical infrastructure development including transportation, ground elevation, stormwater drainage, energy supply, telecommunications, water supply, sewage treatment, solid waste management, and cemeteries.

- Strategic environmental assessment: Content as prescribed in Clause 7, Article 15 of Decree No. 37/2010/NĐ-CP.

- Urban economy: Arguments for determining the list of priority investment programs and projects according to different planning phases; proposals and recommendations for resources to implement these projects.

The explanatory report of the general urban planning scheme for towns and fifth-tier cities not yet recognized as towns must include statistical tables, calculation appendices, illustrative images, and a system of small-scale drawings on A3 paper with clear symbols and annotations, arranged alongside the relevant sections of the explanatory report.

c) Appendices accompanying the explanatory report (explanations, additional arguments supporting the explanatory report; illustrative drawings; calculation data). Appendices attached to related legal documents.

d) Management regulations according to the general urban planning scheme: Content as prescribed in Clause 1, Article 35 of the Urban Planning Law and must include small-scale drawings attached.

đ) Draft Memorandum and draft Decision approving the planning project.

Article 7. Content of the planning dossier for urban area zoning tasks

1.    Drawings including: Location map of the planned zoning area extracted from the general urban planning and map defining the research boundary, scope of the zoning planning area. To be presented on a topographic map at an appropriate scale.

2. Explanation:

a)   Reasons and necessity for establishing the zoning plan; boundaries, area, nature, preliminary status of the zoning planning area. Identify key issues to be addressed in the zoning plan. The urban zoning plan must be consistent and specific to the approved general urban plan.

b)   State basic indicators expected to be applied in the project regarding population, land use, social infrastructure, and technical infrastructure based on the approved general urban plan; requirements for detailing the approved general urban plan.

c)  Preliminary determination of population size, land, and technical infrastructure needs, social infrastructure needs for the planned area.

d)   Requirements for current status investigation and survey work, data collection, spatial organization, functional zoning, architecture, technical infrastructure connection, and strategic environmental assessment.

đ) Determine the list of drawings, descriptions, and appendices; quantity and specifications of the project dossier products; plan and schedule for organizing the zoning task.

3. Draft report and draft decision approving the zoning task.

Article 8. Content of the planning dossier for urban area zoning projects

1. Components of the drawings include:

a)   Location and boundary map of the land. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

b)   Current state architectural landscape map and construction land evaluation map. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

c)   Maps of current technical infrastructure systems and environmental protection. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

d)   Land use master plan map. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

đ) Spatial organization architectural landscape scheme map. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

e)   Traffic planning map and red line, construction boundary map. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

g)    Other technical infrastructure system planning maps. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

h)   Integrated utility lines and pipelines map. To be presented on a topographic map at a scale of 1/2,000 or 1/5,000.

i)    Map identifying underground construction areas: Underground public facilities, high-rise buildings with basement construction (if any). To be presented on a topographic map at an appropriate scale.

k) Urban design drawings as prescribed by the Ministry of Construction in Circular No. 06/2013/TT-BXD.

2.    Description: The content of the description in the urban area zoning planning dossier includes:

a)   Objectives and scope of planning.

b)   Determination of urban planning land use indicators, social infrastructure, and technical infrastructure for the entire planning area; forecast of population, land, technical infrastructure needs, social infrastructure needs for the planning area.

c)   Determination of principles and proposals for spatial organization, architecture, landscape, land use, and social infrastructure, technical infrastructure for each functional zone, each block, main streets, open space areas, public space areas, focal areas within the planning area; regulations on land use.

d)     Urban design as prescribed by the Ministry of Construction in Circular No. 06/2013/TT-BXD.

đ) Determination of investment construction projects and resources for implementation.

e)   Environmental impact analysis consistent with the strategic environmental assessment content in the approved general plan.

g) Urban economics: Justification for determining the priority programs and projects; proposals and recommendations for mechanisms to mobilize and create resources for implementation.

The urban area zoning planning project description must have statistical tables, calculation appendices, illustrative images, and a system of small-scale drawings on A3 paper with clear symbols and annotations, arranged alongside relevant sections of the description.

3.   Management regulations according to the urban area zoning planning project: Content as stipulated in Clause 2, Article 35 of the Urban Planning Law and must include accompanying small-scale drawings.

4. Draft proposal and draft decision approving the planning project.

5.    Appendices accompanying the description (explanations, appendices attached, explanations, additional justifications for the description; illustrative drawings; calculation data). Legal documents related appendices attached.

Article 9. Content of the planning dossier for detailed urban planning tasks

1.    Drawings including: A location map of the planning area extracted from the approved district planning or general urban planning at an appropriate scale and boundary map, research scope, scale of the area to be detailed urban planning. Displayed on a topographic map at a scale of 1/500.

2.   Description:

a)   Reasons and necessity for planning; boundary, area, function, preliminary status of the area to be detailed urban planning. The detailed planning must be consistent and specific to the approved district planning.

b)   Preliminary assessment of current conditions, identifying key issues and basic contents that need to be addressed in the detailed urban planning project.

c)  Forecasting basic indicators to be applied in the project regarding population size, land use needs, social infrastructure, and technical infrastructure based on the provisions of the approved district planning and general urban planning.

d)  Specific requirements for current condition surveys and data collection.

đ) Forecasting construction projects to be invested and built within the detailed urban planning area; determining requirements for spatial organization, architectural landscape, land use, technical infrastructure connectivity, and other requirements.

e) Determining the list of drawings, descriptions, and appendices; quantity and specifications of dossier products; plan and schedule for organizing the detailed urban planning task.

3. Draft Presentation Paper and draft Decision approving the detailed urban planning task.

Article 10. Content of the dossier for detailed urban planning projects

1.  Drawing components:

a)   Location and boundary map of the land. Displayed on a topographic map at a scale of 1/2,000 or 1/5,000.

b)   Current status map of architectural landscapes, social infrastructure, and land evaluation. Displayed on a topographic map at a scale of 1/500.

c)    Maps of current technical infrastructure systems. Displayed on a topographic map at a scale of 1/500.

d)    Master plan map of land use. Displayed on a topographic map at a scale of 1/500.

đ) Spatial organization, architectural, and landscape layout diagram. Displayed on a topographic map at a scale of 1/500.

e)    Red line, construction boundary, and protective corridor maps for technical infrastructure lines. Displayed on a topographic map at a scale of 1/500.

g)    Planning maps of technical infrastructure systems. Displayed on a topographic map at a scale of 1/500.

h)    Map of the overall network of technical utility lines and pipelines. Displayed on a topographic map at a scale of 1/500.

i)     Drawings defining underground construction areas: Underground public facilities, high-rise buildings with basement construction (if any). Displayed on a topographic map at an appropriate scale.

k)    Urban design drawings as prescribed by the Ministry of Construction in Circular No. 06/2013/TT-BXD.

2.   Description: The content of the description in the detailed urban planning project dossier includes:

a)   Determination of population indicators, social infrastructure, technical infrastructure, and requirements for spatial organization, architectural landscape for the entire planning area; land use indicators and requirements for building arrangement for each plot; arrangement of technical infrastructure networks up to the plot boundaries.

b)   Determination of the location and scale of special zones requiring control, contents to be implemented for control, and regulations for implementation.

c)    Urban design solutions, specific architectural designs, and landscape plans for the planning area.

d)    Determination of areas for underground construction (underground public facilities, high-rise buildings with basement construction, etc.)

đ) Environmental impact analysis consistent with the strategic environmental assessment content in the approved general urban planning.

e)    Preliminary forecast of total investment; proposal for funding sources and implementation organization.

The detailed urban planning project description must include statistical tables, calculation appendices, illustrative images, and schematic diagrams, small-scale A3 drawings with clear symbols and annotations, arranged alongside relevant sections of the description.

3.    Management regulations according to the detailed urban planning project: Content as stipulated in Clause 3, Article 35 of the Urban Planning Law and must include accompanying small-scale drawings.

4. Draft proposal and draft decision approving the planning project.

5.     Appendices to the description (explanations, additional arguments supporting the description; illustrative drawings; calculation data). Appendices attached to related legal documents.

Article 11. Content of the planning task file for specialized urban technical infrastructure planning

1.   Drawings including: The boundary map of the specialized urban technical infrastructure planning project. Displayed on a topographic map at an appropriate scale.

2.   Description:

a)     Reasons for planning, viewpoints, and objectives of the project according to the specialized technical infrastructure sector

b)   State requirements for comprehensive evaluation of technical infrastructure; review, analyze, and select economic-technical indicators; forecast demand; specific location and scale requirements for key facilities as well as technical network solutions.

c)    Determine the list of drawings, descriptions, and accompanying appendices; quantity and specifications of project file products; plan and schedule for organizing the planning task.

3.   Draft Memorandum and draft Decision on approval of the planning task.

Article 12. Content of the planning project file for specialized urban technical infrastructure planning

1. Urban transportation planning project

a) Drawing components:

- Location and regional connection diagram including: Research boundaries, planning scope, and main transportation network. Displayed on a topographic map at an appropriate scale.

-    Current status map of the transportation system: External transportation network, urban transportation network; locations and scales of railway stations, airports, river ports, sea ports, inter-provincial bus terminals, large parking lots. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

-    Transportation system planning diagram. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000:

+ External transportation system including: Scale, route direction of national highways, railways, waterways, airways; locations and scales of airports, railway stations, ports, inland ports, inter-provincial bus terminals.

+ Urban transportation system including: Urban road network (to major city streets); urban rail transit; waterways; locations, types, and scales of important traffic nodes, parking areas, central passenger transport stations, large bridges crossing rivers, overpasses, highway tunnels; main public passenger transport routes.

b)   Description:

-    The description must analyze, synthesize, and evaluate the current construction and development status of the urban transportation system; planning solutions for the urban transportation system must ensure the contents stipulated in Article 22 of Decree No. 37/2010/NĐ-CP.

-    The description must include diagrams, small-scale drawings on A3 paper, statistical tables, calculation appendices, and illustrative images.? c)   Draft proposal and approval decision.

2. Urban land level and stormwater drainage planning project

a)   Drawing components:

-    Location and regional connection diagram including: Research boundaries, planning scope, and main river and irrigation systems of the region. Displayed on a topographic map at an appropriate scale.

-    Current status map of land construction assessment, drainage system; locations and scales of key facilities. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

-    Urban land level and stormwater drainage planning diagram. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000:

+ Drainage watershed, drainage system; locations and scales of key facilities.

+ Land levels in urban areas and major city streets.

-   The description must analyze, synthesize, and evaluate the current topography, geological conditions, hydrology, environmental disaster-prone areas, and propose planning solutions for land levels and stormwater drainage that comply with the provisions of Article 23 of Decree No. 37/2010/NĐ-CP.

b)   Description:

-   The description must include diagrams, small-scale drawings on A3 paper, statistical tables, and analytical calculations.

c) Draft proposal and draft approval decision.

3.   Urban power supply planning project

-    Location and regional connection diagram including: Research boundaries, planning scope, and power transmission system. Displayed on a topographic map at an appropriate scale.

-    Location and regional connection diagram including: Research boundaries, planning scope, and main river and irrigation systems of the region. Displayed on a topographic map at an appropriate scale.

-    Current status map of the power supply system: Power sources, transmission and distribution lines; locations and scales of transformer substations. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

-   Power supply planning map: Power sources, transmission and distribution lines; locations and scales of transformer substations. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

-   Illustrative drawings (if any).

-    The description must analyze, synthesize, and evaluate the current power supply situation, and propose planning solutions for power supply that comply with the provisions of Article 24 of Decree No. 37/2010/NĐ-CP.

b)   Description:

-    The description must include diagrams, small-scale drawings on A3 paper, statistical tables, and analytical calculations.

c)   Draft proposal and draft approval decision.

4.   Urban lighting planning project

-     Location and regional connection diagram including: Research boundaries and planning scope. Displayed on a topographic map at an appropriate scale.

a) Drawing components:

-    Current status map of the urban lighting system: General power supply system of the city, street lighting network along main axes to district level. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

-   Urban lighting planning map: Themes, urban lighting concepts according to functional zones, public spaces, main axes to district level, and urban focal points. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Urban lighting planning map: Theme, urban lighting concept according to urban functional zones, public spaces, main axes down to the district level, and key urban points. Presented on a topographic map at a scale of 1/10,000 or 1/25,000.

-    The description must analyze, synthesize, and evaluate the current power supply situation, and propose planning solutions for power supply that comply with the provisions of Article 24 of Decree No. 37/2010/NĐ-CP.

b)   Description:

- The explanatory content must analyze, compile, and evaluate the current status of urban lighting; planning solutions for lighting must ensure compliance with the provisions of Article 25 of Decree No. 37/2010/NĐ-CP, while clearly defining the theme and concept of lighting for functional urban areas, public spaces, traffic facilities, exterior lighting of buildings, advertising lighting, and festival areas.

- The explanatory content must include a scaled-down drawing on A3 paper, analytical tables, calculation charts, and illustrative images.

c) Draft Memorandum and draft Decision to approve.

5. Urban water supply planning project.

-    Location and regional connection diagram including: Research boundaries, planning scope, and main river and irrigation systems of the region. Displayed on a topographic map at an appropriate scale.

-    Current status map of the urban lighting system: General power supply system of the city, street lighting network along main axes to district level. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Current status map of construction and development of the water supply system showing: Locations, scale of water supply facilities, transmission lines, and distribution lines (primary and secondary). To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Water supply planning map: Water supply zones; locations of transmission and distribution lines; locations and scale of water supply facilities. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

b)   Description:

- The explanatory content must analyze, compile, and evaluate the current status of the water supply system; water reserves and sources; propose planning solutions that comply with the provisions of Article 26 of Decree No. 37/2010/NĐ-CP.

c) Draft proposal and draft approval decision.

4.   Urban lighting planning project

6. Urban wastewater drainage planning project.

a) Drawing components:

-    Current status map of the urban lighting system: General power supply system of the city, street lighting network along main axes to district level. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Current status map of construction and development of the wastewater drainage system showing: Locations, scale of wastewater drainage facilities, primary and secondary drainage lines. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Wastewater drainage planning diagram: Drainage zones; locations of primary and secondary drainage lines; locations and scale of wastewater drainage facilities. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

b) Explanatory content:

- The explanatory content must analyze, compile, and evaluate the current status of: the drainage system, environmental changes, and drainage capacity. Propose planning solutions that comply with the provisions of Article 27 of Decree No. 37/2010/NĐ-CP.

c)   Draft proposal and draft approval decision.

c) Draft Memorandum and draft Decision to approve.

7. Solid waste management planning project.

-    Location and regional connection diagram including: Research boundaries, planning scope, and main river and irrigation systems of the region. Displayed on a topographic map at an appropriate scale.

-    Current status map of the urban lighting system: General power supply system of the city, street lighting network along main axes to district level. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Current status map of solid waste treatment showing: Locations, scale of transfer stations, solid waste treatment facilities. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Solid waste treatment planning map showing locations and scale of solid waste treatment facilities, transfer stations. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

b) Explanatory content:

- The explanatory content must analyze, compile, and evaluate the current status of solid waste treatment; management and treatment solutions for solid waste must comply with the provisions of Article 28 of Decree No. 37/2010/NĐ-CP.

- The explanatory content must include diagrams, scaled-down drawings on A3 paper, analytical tables, and calculations.

c) Draft Memorandum and draft Decision to approve.

8. Cemetery planning project.

-    Location and regional connection diagram including: Research boundaries, planning scope, and main river and irrigation systems of the region. Displayed on a topographic map at an appropriate scale.

-    Current status map of the urban lighting system: General power supply system of the city, street lighting network along main axes to district level. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Current status map showing locations, scale, and type of cemeteries. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Cemetery planning map showing locations, scale, type, and level of cemeteries. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Explanatory content: The explanatory content must analyze, compile, and evaluate the current status of cemetery distribution; specific planning solutions for cemeteries within a project must comply with the provisions of Article 29 of Decree No. 37/2010/NĐ-CP.

c)   Draft proposal and draft approval decision.

c) Draft Memorandum and draft Decision to approve.

9. Telecommunication infrastructure planning project.

-    Location and regional connection diagram including: Research boundaries, planning scope, and main river and irrigation systems of the region. Displayed on a topographic map at an appropriate scale.

-    Current status map of the urban lighting system: General power supply system of the city, street lighting network along main axes to district level. Displayed on a topographic map at a scale of 1/10,000 or 1/25,000.

- Current status map of the telecommunications system showing: Locations, scale of transmission and reception stations, wired information transmission systems. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

- Telecommunications system planning map: Information transmission lines, regional transmission and reception stations, key facilities. To be presented on a topographic map at a scale of 1/10,000 or 1/25,000.

b) Explanatory content:

The explanatory content must analyze, compile, and evaluate the current status of the telecommunications system; propose planning solutions for telecommunications that comply with the provisions of Article 30 of Decree No. 37/2010/NĐ-CP.

The explanatory content must include diagrams, scaled-down drawings on A3 paper, analytical tables, and calculations.

c) Draft Memorandum and draft Decision to approve.

Section 3

Special function area planning

Article 13. Content of the planning dossier for the general construction planning of special function zones

1.   Drawings including: Location and relationship diagram; boundary map, scope of research for the general construction planning. To be presented on a topographic map at an appropriate scale.

2. Explanation:

a) Reasons, necessity for establishing the general construction planning, scope, scale, and boundaries of the planning; summarize the current status of the planned area and existing issues.

b)   Determine the scale and nature of the planned area, viewpoints and objectives of the planning.

c)   Propose basic economic and technical criteria to apply, preliminary forecast about population, land, and technical infrastructure within the planning scope.

d)   Requirements for current condition surveys and data collection; development direction of the special function zone, spatial structure, key projects, social infrastructure, organization of the technical infrastructure system framework, strategic environmental assessment.

đ) Preliminarily determine the issues to be resolved in the general construction planning dossier for the special function zone.

e)    List of drawings, descriptions, and accompanying appendices; quantity and specifications of dossier products; plan and schedule for organizing the planning.

3.   Draft Memorandum and draft Decision on approval of the planning task.

4.   Related legal documents.

5.    Special function zones with an area of 500 hectares or more, located within areas that have already been approved for general construction planning, do not need to establish a general construction planning but should proceed with detailed planning steps according to Decree No. 44/2015/NĐ-CP.

Article 14. Content of the planning dossier for the general construction planning of special function zones

1. Components of the drawings:

a)     Location and relationship diagram: Show the relationships between the planned area and related regions in terms of economy and society; terrain conditions, regions significantly affecting space, architectural landscape within the planned area; key technical infrastructure and other factors impacting the development of the special function zone. To be presented on a topographic map at an appropriate scale.

b)     Current status maps including: Land use, architectural landscape, social infrastructure, transportation, ground level and stormwater drainage, energy supply, telecommunications, wastewater treatment, solid waste management, and cemeteries. To be presented on a topographic map at a scale of 1/5,000 or 1/10,000.

c)   Comprehensive evaluation and selection map for construction land: Identify favorable, less favorable, and unfavorable areas for development; determine restricted and prohibited development zones within the special function zone. To be presented on a topographic map at a scale of 1/5,000 or 1/10,000.

d)    Development structure diagram of the planned area (current status analysis diagrams and proposals for solutions with explanations on criteria for selecting solutions).

đ) Spatial development orientation diagram: Define the spatial development structure of the planned area according to functional zones; emphasize public spaces, main axes, open spaces, squares, parks, water bodies; connections between zones regarding transportation and technical infrastructure. For general construction planning of economic zones, high-tech zones, must define and present the boundaries of intervention control zones such as conservation, renovation, new development areas, and other architectural landscape zones requiring protection. To be presented on a topographic map at a scale of 1/5,000 or 1/10,000.

e) Land use planning map: Define areas based on spatial structure and land use functions; propose key economic and technical parameters, land use indicators for each area. For the main spatial areas of economic zones, high-tech zones, research and training zones, maximum and minimum building heights must be specified. To be presented on a topographic map at a scale of 1/5,000 or 1/10,000.

g)   Architectural and landscape control orientation drawings: Define architectural and landscape zones within the planned area; propose organization of key axes and functional zones (central area, gateway area, main axis, square, green space, water body, and focal points). To be presented on a topographic map at an appropriate scale.

h)    Technical infrastructure development orientation maps: Transportation, ground level and stormwater drainage, energy supply, telecommunications, water supply, sewage treatment, solid waste management, and cemeteries. To be presented on a topographic map at a scale of 1/5,000 or 1/10,000.

i)    Strategic environmental assessment drawings: Current status and strategic environmental assessment. To be presented on a topographic map at an appropriate scale.

2. Description: The description content of the general construction planning dossier for the special function zone includes:

a)    Analysis and evaluation of natural conditions and current status; determination of fundamental issues to be addressed.

b)    Determination of development goals and driving forces; forecast of population and labor force size; selection and determination of land use, social infrastructure, and technical infrastructure indicators for the entire zone, urban and rural areas (if applicable), and each functional zone.

c)    Proposal and selection of spatial development structure of the planned area including orientation for development of urban and rural residential systems and social infrastructure; orientation for other functional zones for the entire area (industrial, tourism, ecological, conservation, etc.).

d)   Control regulations on architecture and landscape within the planned area: Orientation for development of spatial axes and development corridors of the planned area, serving as the basis for determining population density indicators, land use planning indicators, and development principles for functional zones of the planned area.

đ) Orientation for development of technical infrastructure system of the special function zone including transportation, preparation technology, energy supply, telecommunications, water supply, solid waste management, and cemeteries.

e) Strategic environmental assessment: Content as prescribed in Point g Clause 1 Article 12 Decree 44/2015/NĐ-CP.

g) Economy: Arguments for determining the list of priority programs and projects to be invested in according to each planning phase; proposals and recommendations on resources for implementation.

The explanatory report of the general construction master plan for special functional zones must include statistical tables, calculation appendices, illustrative images, and a system of scaled drawings at A3 size with clear symbols and annotations, arranged alongside the relevant sections of the explanatory report.

3.    Appendices accompanying the explanatory report (explanations, additional arguments for the explanatory report; illustrative drawings; calculation data). Appendices attached to related legal documents.

4.   Management regulations according to the general construction master plan for special functional zones: Content as prescribed in Clause 1 Article 15 Decree 44/2015/NĐ-CP and must include scaled drawings attached.

5.  Draft proposal and draft decision approving the general construction master plan.

6.    Appendices accompanying the explanatory report (explanations, appendices attached, additional arguments for the explanatory report; illustrative drawings; calculation data). Appendices attached to related legal documents.

Article 15. Contents of the planning task dossier for district construction zoning.

1.    Drawings including: Location diagram of the planning area and boundary map, scope of the district construction zoning planning area. Displayed on a topographic map at an appropriate scale.

2. Explanation:

a)    Reasons, basis, and necessity for establishing district construction zoning planning. Arguments regarding the boundary, area, and nature of the planning area. Determination of key issues and basic contents to be resolved in the district construction zoning planning project.

b)   Proposals and selection of basic criteria to apply, population projections, land use, social infrastructure, and technical infrastructure of the planned area, based on analysis and synthesis from approved related plans.

c)   Requirements for current status surveys, data collection, spatial organization, functional zoning, architectural landscape, technical infrastructure connection, and strategic environmental assessment.

d)   Determination of drawing, explanation, and accompanying appendix lists; quantity and specifications of planning project dossier products; planning and schedule for organizing the zoning planning.

3.   Draft Memorandum and draft Decision on approval of the planning task.

4.   Related legal documents.

5.    For industrial zones and export processing zones with a scale of 200 ha to 500 ha: District construction zoning planning is established on a map at a scale of 1/2,000 with all required contents to serve as a basis for investment project planning for technical infrastructure construction and building permits. In cases where district construction zoning planning for industrial zones and export processing zones is established in areas already having approved general construction master plans, there is no need to establish a planning task.

Article 16. Contents of the planning project dossier for district construction zoning.

1.  Drawing components:

a)   Location diagram and boundary of the land. Displayed on a topographic map at a scale of 1/5,000 or 1/10,000.

b)   Current state architectural landscape and land development evaluation map. Displayed on a topographic map at a scale of 1/2,000.

c)   Maps of current technical infrastructure systems and environmental protection. Displayed on a topographic map at a scale of 1/2,000.

d)   Land use planning map. Displayed on a topographic map at a scale of 1/2,000.

đ) Spatial organization architectural landscape diagram. Displayed on a topographic map at a scale of 1/2,000.

e)   Map identifying underground construction areas: Underground public facilities, high-rise buildings with basement floors (if applicable). At an appropriate scale.

g)   Transportation planning map and red-line boundaries, construction boundaries. Displayed on a topographic map at a scale of 1/2,000.

h)    Other technical infrastructure planning maps. Displayed on a topographic map at a scale of 1/2,000.

i)    Integrated technical utility lines map. Displayed on a topographic map at a scale of 1/2,000.

k) Drawings defining architectural and landscape control guidelines within the district construction zoning planning area: Control indicators for setbacks, architectural landscapes along main streets, central areas; open space areas, landmark structures, and individual blocks within the design area. Displayed at an appropriate scale.

1) Drawings on strategic environmental assessment: Current status and strategic environmental assessment. Displayed on a topographic map at an appropriate scale.

2.   Explanatory report: The content of the explanatory report of the district construction zoning planning project includes:

a)    Determination of objectives, scope, boundaries, and basis for planning.

b)    Analysis and evaluation of natural conditions and current status; determination of key issues to be addressed in the district construction zoning planning project.

c)   Determination of land use standards according to purpose, social infrastructure, and technical infrastructure for the entire planning area.

d)   Determination of requirements, principles, and proposed solutions for spatial organization, architecture, landscape (for each functional zone, each block, main streets, open space areas, landmark structures), technical infrastructure, social infrastructure.

đ) Regulations on architectural and landscape control within the district construction zoning planning area: Control indicators for setbacks, architectural landscapes along main streets, central areas; open space areas, landmark structures, and individual blocks within the design area.

e)    Determination of priority technical infrastructure projects and funding sources.

g)     Strategic environmental assessment: Content as prescribed in Point e Clause 1 Article 13 Decree 44/2015/NĐ-CP.

h)    Arguments for determining the list of priority investment projects; proposals and recommendations on mechanisms for mobilizing and creating funding sources.

The explanatory report of the detailed urban planning project must include statistical tables, calculation appendices, illustrative images, and a system of diagrams and scaled drawings on A3 paper with clear symbols and annotations, arranged alongside the relevant sections of the explanatory report.

3.     Appendices accompanying the explanatory report (further explanations, calculations, additional arguments supporting the explanatory report; illustrative drawings; data for calculations and related legal documents).

4.    Management regulations according to the detailed urban planning project: Content as stipulated in Clause 2, Article 15 of Decree No. 44/2015/NĐ-CP and must include accompanying diagrams.

5.   Draft Memorandum and draft Decision approving the planning project.

Article 17. Contents of the dossier for the assignment of detailed urban planning

1.     Drawings including: Location diagram of the planning area extracted from the district planning or general urban planning at an appropriate scale and map of the research boundary, scope of the detailed urban planning area. Based on a topographic map at a scale of 1/500.

2.   Description:

a) Arguments regarding the necessity, bases for planning; determination of the boundaries, area, and function of the detailed urban planning area.

b)   Determination of the contents and issues to be addressed in the detailed urban planning project.

c)   Indication of basic criteria applied concerning scale, land use, social infrastructure, and technical infrastructure based on the approved district planning or general urban planning, standards, and other related plans.

d)   Requirements for current status surveys, data collection, spatial organization, architectural landscape, technical infrastructure connection, strategic environmental assessment, and other research requirements.

đ) Preliminary proposal on structure and principles of spatial organization of the detailed planning area based on the list of construction projects to be invested within the detailed planning area.

e)    Determination of the list of drawings, explanatory reports, and accompanying appendices; quantity and specifications of the project dossier products; plan and schedule for organizing the detailed planning.

3.   Draft Memorandum and draft Decision on approval of the planning task.

4.    Detailed planning for industrial zones, industrial clusters, and export processing zones does not require the establishment of an assignment of detailed planning. Industrial zones, export processing zones with an area under 200 hectares, and industrial clusters shall immediately establish detailed urban planning to serve as a basis for investment projects in technical infrastructure.

Article 18. Contents of the dossier for the detailed urban planning project of special functional areas

1. Components of the drawings:

a)    Diagram of location and boundaries of the land plot, extracted from the district planning or general urban planning. Based on a topographic map at a scale of 1/2,000.

b)    Current condition map of architecture, landscape, and land evaluation. Based on a topographic map at a scale of 1/500.

c)    Maps of current technical infrastructure systems. Displayed on a topographic map at a scale of 1/500.

d)   Map of spatial organization, architecture, and landscape. Based on a topographic map at a scale of 1/500.

đ) Master plan map of land use: Determining the boundaries of each plot and lot according to the nature and function of land use for civil and public buildings, transportation systems, green spaces, key infrastructure facilities; management requirements for land use (building height, building density, land use coefficient, etc.). Based on a topographic map at a scale of 1/500.

e) Drawing of underground construction areas: Underground public facilities, high-rise buildings with basement floors (if any). At an appropriate scale.

g)    Red line map, construction boundary map, and protection zones for technical infrastructure lines. Based on a topographic map at a scale of 1/500.

h)    Maps of technical infrastructure and environmental planning systems: Transportation, power supply and lighting, telecommunications, water supply, ground level and stormwater drainage, sewage drainage, solid waste collection, cemetery. Based on a topographic map at a scale of 1/500.

i) Map of integrated utility lines and pipelines. Based on a topographic map at a scale of 1/500.

k) Drawings specifying architectural and landscape control measures in the planning area: Determining landmark buildings in the planning area according to directions and views; determining building heights, setbacks for each plot along streets and intersections; determining the form, color, and architectural style of buildings; green space, water bodies, squares. At an appropriate scale.

1) Drawings on strategic environmental assessment: Current conditions and strategic environmental assessment. Based on a topographic map at an appropriate scale.

2. Explanatory Report: The content of the explanatory report of the detailed urban planning project includes:

a)   Analysis and evaluation of natural conditions and current status of the land for detailed urban planning; identification of issues to be resolved in the detailed urban planning project.

b)   Determination of population criteria, social infrastructure, technical infrastructure, and spatial organization, architectural requirements for the planning area; land use criteria and architectural requirements for each plot; arrangement of technical infrastructure networks up to plot boundaries.

c)   Determination of the location, scale, and regulation of specific areas requiring control.

d)   Regulation or proposal of specific design solutions.

đ) Strategic environmental assessment: Content as stipulated in Point e, Clause 1, Article 14 of Decree No. 44/2015/NĐ-CP.

e)    Preliminary estimate of total investment cost; proposal on funding sources and implementation organization.

The explanatory report of the detailed urban planning project must include statistical tables, calculation appendices, illustrative images, and a system of diagrams and scaled drawings on A3 paper with clear symbols and annotations, arranged alongside the relevant sections of the explanatory report.

3.    Attachments accompanying the explanatory statement (explanations, clarifications, supplementary arguments for the explanatory statement; illustrative drawings; calculation data and related legal documents).

4.    Management regulations according to the detailed construction planning scheme: Content as prescribed in Clause 3, Article 15 of Decree No. 44/2015/NĐ-CP and must include accompanying diagrams.

5.   Draft Memorandum and draft Decision approving the planning project.

Section 4

Adjustment planning dossier and archival dossier

Article 19. Contents of the adjustment planning dossier

1.  For overall adjustment of construction planning;

The contents and components of the dossier for the task and project of overall adjustment of construction planning as stipulated in Sections 1, 2, and 3 of Chapter II of this Circular.

2.    For partial adjustment of construction planning, the contents and components of the dossier include:

a)    Report from the agency organizing the planning submitted to the competent authority for approval of construction planning, specifying: Reasons and necessity for implementing partial adjustment of planning; content of partial adjustment of planning; analysis and continuous, synchronized assessment of the entire planning scheme and economic-social effectiveness of partial adjustment of planning; proposals for measures to address new issues arising from partial adjustment; implementation schedule and progress following partial adjustment planning approved by the competent authority. Accompanied by relevant legal documents and materials.

b)   Drawings reflecting the contents of partial adjustment, determining planning indicators achieved after partial adjustment of planning; with reference and comparison to planning indicators already approved.

c)   Draft decision of the competent authority deciding on partial adjustment of construction planning.

Article 20. Archival Dossier

1. For Planning Task, the archival dossier includes:

a)    Decision approving the planning task

b)    Explanatory statement of the planning task confirmed by the reviewing agency

c)    All files and related documents stored electronically

2.   For Planning Scheme, the archival dossier includes:

a)    Decision approving the planning scheme

b)    Explanatory statement and drawings confirmed by the reviewing agency

c)    All files stored electronically

3.   For adjustment of planning, the archival dossier includes:

a)    Overall adjustment of planning: As prescribed in Sections 1, 2, and 3 of Chapter II of this Circular.

b)    Partial adjustment of construction planning: Decision approving partial adjustment of construction planning; report on partial adjustment and updated drawings reflecting the contents of partial adjustment; all files stored electronically.

Chapter III

ORGANIZATION AND IMPLEMENTATION

Article 21. Implementation clause

1.    This Circular takes effect from August 15, 2016 and replaces the following legal documents:

a)    Circular No. 07/2008/TT-BXD dated April 7, 2008 of the Minister of Construction guiding the preparation, review, approval, and management of construction planning.

b)    Decision No. 03/2008/QĐ-BXD dated March 31, 2008 of the Minister of Construction promulgating regulations on the content of drawings and explanatory statements for Planning Tasks and Planning Schemes.

c)    Decision No. 21/2005/QĐ-BXD dated July 22, 2005 of the Minister of Construction on the issuance of regulations on the system of drawing symbols in planning schemes.

d)    Circular No. 19/2008/TT-BXD dated November 20, 2008 of the Minister of Construction on guiding the implementation of the preparation, review, approval, and management of industrial zone and economic zone planning.

đ)    Circular No. 10/2010/TT-BXD dated August 10, 2010 of the Minister of Construction on the dossier for each type of urban planning.

2.    After this Circular takes effect, planning schemes for regional construction planning, urban planning, and special function area construction planning that are currently being prepared and not yet completed must be reviewed and completed according to the provisions of this Circular before submission for review.

Article 22. Responsibilities for Implementation

1.    Organizations and individuals participating in the preparation, review, and approval of construction planning shall implement the provisions of this Circular regarding the dossier for planning tasks, planning schemes for regional construction planning, urban planning, and special function area construction planning.

2.    The Department of Planning and Architecture under the Ministry of Construction, Construction Departments of provinces, and the Department of Planning and Architecture of Hanoi and Ho Chi Minh City are responsible for guiding and supervising the implementation of the provisions of this Circular.

3.    During the implementation process, if there are difficulties, organizations and individuals are requested to submit their opinions in writing to the Ministry of Construction for study and resolution./.

 

Văn bản gốc (PDF)

Mở PDF trong tab mới ↗

Bản đồ quan hệ

↑ Cơ sở & văn bản tác động lên văn bản này
Căn cứ 26
30/2009/QH12 Nghị quyết số 30/2009/QH12 Phê chuẩn quyết toán ngân sách nhà nước năm 2007 Còn hiệu lực 37/2010/NĐ-CP Nghị định số 37/2010/NĐ-CP Về lập, thẩm định, phê duyệt và quản lý quy hoạch đô thị Hết hiệu lực 44/2015/NĐ-CP Nghị định số 44/2015/NĐ-CP Quy định chi tiết một số nội dung về quy hoạch xây dựng Hết hiệu lực 50/2014/QH13 Luật Xây dựng số 50/2014/QH13 Còn hiệu lực 62/2013/NĐ-CP Nghị định số 62/2013/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Xây dựng Hết hiệu lực 11/2017/QĐ-UBND Quyết định số 11/2017/QĐ-UBND Ban hành quy định về lập, thẩm định, phê duyệt và tổ chức thực hiện hồ sơ quy hoạch xây dựng trên địa bàn tỉnh Đồng Nai. Hết hiệu lực 03/2017/QD-UBND Quyết định số 03/2017/QD-UBND Ban hành Quy định phân công, phân cấp về lập, thẩm định, phê duyệt và quản lý quy hoạch xây dựng trên địa bàn tỉnh Bình Thuận Hết hiệu lực 11/2022/QĐ-UBND Quyết định số 11/2022/QĐ-UBND Ban hành Quy định phân công, phân cấp về lập, thẩm định, phê duyệt và quản lý quy hoạch xây dựng, quy chế quản lý kiến trúc trên địa bàn tỉnh Hết hiệu lực 48/2020/QĐ-UBND Quyết định số 48/2020/QĐ-UBND Ban hành Quy định về lập, thẩm định, phê duyệt, quản lý quy hoạch xây dựng, quy hoạch đô thị và quy hoạch nông thôn trên địa bàn tỉnh Ninh Thuận Còn hiệu lực 35/2020/QĐ-UBND Quyết định số 35/2020/QĐ-UBND Sửa đổi, bổ sung một số điều của Quy định về lập, thẩm định, phê duyệt, quản lý thực hiện quy hoạch đô thị và quy hoạch xây dựng trên địa bàn tỉnh ban hành kèm theo Quyết định số 25/2019/QĐ-UBND ngày 27/6/2019 của Ủy ban nhân dân tỉnh Bình Định Hết hiệu lực 19/2019/QĐ-UBND Quyết định số 19/2019/QĐ-UBND Ban hành Quy định một số nội dung về quản lý quy hoạch xây dựng và cấp giấy phép xây dựng trên địa bàn tỉnh Hà Tĩnh Hết hiệu lực 01/2020/QĐ-UBND Quyết định số 01/2020/QĐ-UBND Về việc sửa đổi một số điều của Quy định quản lý quy hoạch, đầu tư, khai thác khu đô thị trên địa bàn tỉnh Hà Nam ban hành kèm theo Quyết định số 15/2016/QĐ-UBND ngày 18/5/2016 của Ủy ban nhân dân tỉnh Hết hiệu lực 47/2019/QĐ-UBND Quyết định số 47/2019/QĐ-UBND Ban hành Quy định lộ giới và các chỉ tiêu chủ yếu quản lý quy hoạch, xây dựng đối với nhà ở, công trình riêng lẻ thuộc phạm vi đồ án quy hoạch chung xây dựng thị trấn Cát Tiên, huyện Cát Tiên, tỉnh Lâm Đồng Còn hiệu lực 28/2019/QĐ-UBND Quyết định số 28/2019/QĐ-UBND Ban hành Quy định phân công, phân cấp về lập, thẩm định, phê duyệt và quản lý quy hoạch xây dựng trên địa bàn tỉnh Hết hiệu lực 25/2019/QĐ-UBND Quyết định số 25/2019/QĐ-UBND Ban hành quy định về lập, thẩm định, phê duyệt, quản lý thực hiện quy hoạch đô thị và quy hoạch xây dựng trên địa bàn tỉnh Hết hiệu lực 14/2018/QĐ-UBND Quyết định số 14/2018/QĐ-UBND Ban hành Quy chế phối hợp quản lý cụm công nghiệp trên địa bàn tỉnh An Giang Hết hiệu lực 26/2017/QĐ-UBND Quyết định số 26/2017/QĐ-UBND Ban hành Quy định quản lý quy hoạch xây dựng và kiến trúc công trình trên địa bàn tỉnh Lai Châu Hết hiệu lực 09/2017/QĐ-UBND Quyết định số 09/2017/QĐ-UBND Ban hành Quy định về quản lý quy hoạch xây dựng, quy hoạch đô thị trên địa bàn tỉnh Khánh Hòa theo Luật Xây dựng và Luật Quy hoạch đô thị Hết hiệu lực 40/2017/QĐ-UBND Quyết định số 40/2017/QĐ-UBND Ban hành quy định về lập, thẩm định, phê duyệt và quản lý quy hoạch xây dựng trên địa bàn tỉnh Ninh Thuận. Hết hiệu lực 17/2017/QĐ-UBND Quyết định số 17/2017/QĐ-UBND Sửa đổi, bổ sung, bãi bỏ một số điều của Quy định về quản lý quy hoạch trên địa bàn tỉnh Bắc Giang ban hành kèm theo Quyết định số 318/2013/QĐ-UBND ngày 18/7/2013 của Ủy ban nhân dân tỉnh Bắc Giang Hết hiệu lực 51/2016/NQ-HĐND Nghị quyết số 51/2016/NQ-HĐND Về việc thông qua đồ án quy hoạch phân khu xây dựng tỷ lệ 1/2.000 Khu công nghiệp cửa khẩu Bình Hiệp (giai đoạn 1) trong Khu kinh tế cửa khẩu Long Anxã Bình Hiệp, xã Bình Tân, thị xã Kiến Tường, tỉnh Long An Còn hiệu lực 37/2016/QĐ-UBND Quyết định số 37/2016/QĐ-UBND Ban hành Quy định quản lý quy hoạch xây dựng và kiến trúc công trình trên địa bàn tỉnh Cao Bằng Hết hiệu lực 31/2021/QĐ-UBND Quyết định số 31/2021/QĐ-UBND sửa đổi, bổ sung một số điều của Quy định quản lý quy hoạch xây dựng và kiến trúc công trình trên địa bàn tỉnh Cao Bằng ban hành kèm theo Quyết định số 37/2016/QĐ-UBND ngày 20/12/2016 của Ủy ban nhân dân tỉnh Cao Bằng Hết hiệu lực 05/2018/QĐ-UBND Quyết định số 05/2018/QĐ-UBND Ban hành Quy định một số nội dung về quy hoạch xây dựng trên địa bàn tỉnh Lào Cai Hết hiệu lực 08/2018/QĐ-UBND Quyết định số 08/2018/QĐ-UBND Ban hành Quy chế quản lý quy hoạch, kiến trúc Khu đô thị mới Thủ Thiêm, quận 2 Hết hiệu lực 70/2017/NQ-HĐND Nghị quyết số 70/2017/NQ-HĐND Về việc thông qua nhiệm vụ quy hoạch chung thành phố Bảo Lộc và vùng phụ cận tỉnh Lâm Đồng đến năm 2035 Còn hiệu lực
Được dẫn chiếu bởi 12
24/2022/QĐ-UBND Quyết định số 24/2022/QĐ-UBND Về việc quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Sở Lao động - Thương binh và Xã hội tỉnh Thanh Hóa Còn hiệu lực 51/2018/QĐ-UBND QUYẾT ĐỊNH SỐ 51/2018/QĐ-UBND BAN HÀNH QUY ĐỊNH QUẢN LÝ VÀ BẢO VỆ KẾT CẤU HẠ TẦNG GIAO THÔNG ĐƯỜNG BỘ ĐỐI VỚI ĐƯỜNG ĐỊA PHƯƠNG TRÊN ĐỊA BÀN TỈNH AN GIANG Hết hiệu lực 25/2018/QĐ-UBND Quyết định số 25/2018/QĐ-UBND Sửa đổi Điều 4 Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Sở Công thương, ban hành kèm theo Quyết định số 02/2016/QĐ-UBND ngày 15/01/2016 của Ủy ban nhân dân tỉnh Yên Bái Hết hiệu lực 15/2017/TT-BCT Thông tư số 15/2017/TT-BCT quy định, hướng dẫn thực hiện một số nội dung của Nghị định số 68/2017/NĐ-CP ngày 25 tháng 5 năm 2017 của Chính phủ về quản lý, phát triển cụm công nghiệp Hết hiệu lực 05/2018/QĐ-UBND Quyết định số 05/2018/QĐ-UBND Về việc bãi bỏ văn bản Còn hiệu lực 24/2019/QĐ-UBND Quyết định số 24/2019/QĐ-UBND Ban hành Quy định về tiêu chuẩn chức danh Trưởng, phó các đơn vị thuộc Sở Tài chính; Trưởng, phó phòng thuộc Chi cục Tài chính Doanh nghiệp; Trưởng, phó Phòng Tài chính - Kế hoạch thuộc Ủy ban nhân dân quận - huyện Hết hiệu lực 49/2018/QĐ-UBND Quyết định số 49/2018/QĐ-UBND Ban hành Quy định giải quyết thủ tục hành chính theo cơ chế một cửa, một cửa liên thông tại các cơ quan, địa phương trên địa bàn tỉnh An Giang Hết hiệu lực 24/2022/QĐ-UBND Quyết định số 24/2022/QĐ-UBND Ban hành Quy chế quản lý cụm công nghiệp trên địa bàn tỉnh Tuyên Quang Còn hiệu lực 24/2019/QĐ-UBND Quyết định số 24/2019/QĐ-UBND Ban hành quy chế phối hợp quản lý cụm công nghiệp, cụm công nghiệp làng nghề trên địa bàn tỉnh Bà Rịa - Vũng Tàu Hết hiệu lực 49/2018/QĐ-UBND Quyết định số 49/2018/QĐ-UBND Ban hành Quy chế phối hợp quản lý cụm công nghiệp trên địa bàn tỉnh Cà Mau Hết hiệu lực 51/2018/QĐ-UBND Quyết định số 51/2018/QĐ-UBND Ban hành Quy chế phối hợp quản lý cụm công nghiệp trên địa bàn tỉnh Lạng Sơn Hết hiệu lực 25/2018/QĐ-UBND Quyết định số 25/2018/QĐ-UBND Ban hành Quy chế phối hợp quản lý cụm công nghiệp trên địa bàn tỉnh Hưng Yên Hết hiệu lực
12/2016/TT-BXD
Circular No. 12/2016/TT-BXD stipulates the files for planning tasks and plans for regional construction planning, urban planning, and special functional area construction planning.
Expired
↓ Văn bản chịu tác động từ văn bản này
Liên quan 18
08/2018/QĐ-UBND Quyết định số 08/2018/QĐ-UBND Ban hành Quy chế tổ chức và hoạt động của Phòng Y tế quận Gò Vấp Hết hiệu lực 14/2018/QĐ-UBND Quyết định số 14/2018/QĐ-UBND Ban hành Quy định cưỡng chế thực hiện quyết định giải quyết tranh chấp đất đai, quyết định công nhận hòa giải thành trong tranh chấp đất đai trên địa bàn tỉnh Trà Vinh Còn hiệu lực 11/2022/QĐ-UBND Quyết định số 11/2022/QĐ-UBND Ban hành Quy chế về tổ chức và hoạt động của Phòng Kinh tế thuộc Ủy ban nhân dân huyện Nhà Bè Hết hiệu lực 37/2016/QĐ-UBND QUYẾT ĐỊNH SỐ 37/2016/QĐ-UBND VỀ VIỆC QUY ĐỊNH TỶ LỆ (%) PHÂN CHIA CÁC NGUỒN THU GIỮA CÁC CẤP NGÂN SÁCH TRÊN ĐỊA BÀN TỈNH PHÚ THỌ GIAI ĐOẠN 2017 - 2020 Hết hiệu lực 09/2017/QĐ-UBND Quyết định số 09/2017/QĐ-UBND Sửa đổi, bãi bỏ một số điều của Quy chế Tổ chức và hoạt động của Phòng Tư pháp huyện Hóc Môn. Hết hiệu lực 51/2016/NQ-HĐND Nghị quyết số 51/2016/NQ-HĐND Về việc ban hành danh mục dự án cần thu hồi đất và dự án có sử dụng đất trồng lúa, đất rừng phòng hộ năm 2017 Còn hiệu lực 48/2020/QĐ-UBND Quyết định số 48/2020/QĐ-UBND Sửa đổi, bổ sung điểm h Khoản 5 Điều 2, Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Sở Tài chính tỉnh Tây Ninh ban hành kèm theo Quyết định số 31/2016/QĐ-UBND ngày 27 tháng 9 năm 2016 của Ủy ban nhân dân tỉnh Tây Ninh Hết hiệu lực 35/2020/QĐ-UBND Quyết định số 35/2020/QĐ-UBND Về việc bãi bỏ các Quyết định của UBND tỉnh quy định quản lý, sử dụng kinh phí thực hiện chế độ cai nghiện ma tuý Còn hiệu lực 26/2017/QĐ-UBND Quyết định số 26/2017/QĐ-UBND Quy định mức hỗ trợ kinh phí đóng bảo hiểm y tế và chi phí cùng chi trả đối với thuốc kháng vi-rút HIV cho người nhiễm HIV/AIDS có thẻ bảo hiểm y tế trên địa bàn tỉnh nghệ an Hết hiệu lực 19/2019/QĐ-UBND Quyết định số 19/2019/QĐ-UBND Sửa đổi, bổ sung một số nội dung của Quy định về mức bồi thường, hỗ trợ các loại cây trồng, vật nuôi là thủy sản, phần lăng, mộ và chi phí di chuyển trên địa bàn tỉnh Quảng Bình ban hành kèm theo Quyết định số 20/2018/QĐ-UBND ngày 28/8/2018 của UBND tỉnh Hết hiệu lực 17/2017/QĐ-UBND QUYẾT ĐỊNH SỐ 17/2017/QĐ-UBND BÃI BỎ QUYẾT ĐỊNH SỐ 52/2012/QĐ-UBND NGÀY 06 THÁNG 12 NĂM 2012 CỦA ỦY BAN NHÂN DÂN TỈNH VỀ PHƯƠNG THỨC ĐẦU TƯ XÂY DỰNG CHỢ MỚI, NÂNG CẤP, CẢI TẠO CHỢ HẠNG 2, HẠNG 3 TRÊN ĐỊA BÀN TỈNH BÌNH THUẬN Còn hiệu lực 70/2017/NQ-HĐND Nghị quyết số 70/2017/NQ-HĐND Ban hành Quy định một số nội dung và mức hỗ trợ kinh phí sự nghiệp thuộc Chương trình mục tiêu quốc gia Giảm nghèo bền vững giai đoạn 2016 - 2020 Hết hiệu lực 31/2021/QĐ-UBND Quyết định số 31/2021/QĐ-UBND Ban hành quy định về an toàn phòng cháy và chữa cháy đối với nhà để ở kết hợp sản xuất, kinh doanh trên địa bàn tỉnh Trà Vinh Hết hiệu lực 01/2020/QĐ-UBND Quyết định số 01/2020/QĐ-UBND Quy định chức danh, số lượng, mức phụ cấp đối với người hoạt động không chuyên trách ở cấp xã, ở thôn, khu phố; mức khoán kinh phí hoạt động của tổ chức chính trị - xã hội ở cấp xã; mức bồi dưỡng người trực tiếp tham gia công việc của thôn, khu phố trên địa bàn tỉnh Ninh Thuận Hết hiệu lực 25/2019/QĐ-UBND Quyết định số 25/2019/QĐ-UBND Ban hành Quy chế tiếp nhận, xử lý, phát hành và quản lý văn bản điện tử giữa các cơ quan hành chính nhà nước trên địa bàn tỉnh Hưng Yên Hết hiệu lực 40/2017/QĐ-UBND Quyết định số 40/2017/QĐ-UBND Ban hành giá cước dịch vụ công ích trong hoạt động phát hành báo của Đảng bộ tỉnh Thái Nguyên, giai đoạn 2018 - 2019 Hết hiệu lực 28/2019/QĐ-UBND Quyết định số 28/2019/QĐ-UBND Ban hành Quy định quy trình thực hiện cơ chế một cửa liên thông trong giải quyết các thủ tục cấp điện qua lưới điện trung áp trên địa bàn tỉnh Thanh Hoá Còn hiệu lực 47/2019/QĐ-UBND Quyết định số 47/2019/QĐ-UBND Ban hành Bộ đơn giá hoạt động quan trắc môi trường trên địa bàn tỉnh Lào Cai Còn hiệu lực

Bấm vào một văn bản để mở. Viền đỏ = quan hệ làm thay đổi hiệu lực.