Circular No. 25/2024/TT-BGTVT amends and supplements certain Articles of Circular No. 50/2015/TT-BGTVT dated September 23, 2015, issued by the Minister of Transport guiding the implementation of certain provisions of Decree No. 11/2010/NĐ-CP dated February 24, 2010, of the Government on management and protection of road traffic infrastructure and Circular No. 03/2019/TT-BGTVT dated January 11, 2019, issued by the Minister of Transport on flood prevention and mitigation work in the field of roads.

This Circular amends and supplements certain Articles of Circular No. 50/2015/TT-BGTVT and abolishes certain Points, Clauses, and Articles of Circular No. 03/2019/TT-BGTVT. Specifically, it amends the provisions on approval for construction of essential works within the scope of protection of expressway traffic infrastructure; provisions on the dossier for obtaining opinions on connection to national highways and the opinion of the Vietnam Highway Administration in cases not fully meeting the requirements for connection. At the same time, it abolishes Point c Clause 3 Article 13 of Circular No. 03/2019/TT-BGTVT.

文号25/2024/TT-BGTVT
文件类型Circular
发布机关Ministry of Construction
签署人Nguyễn Duy Lâm — Thứ trưởng
更新13/06/2026
行业Transport
领域Roads
发布日期28/06/2024
生效日期01/08/2024
失效日期
状态In effect
✦ 智能摘要

This Circular amends and supplements certain Articles of Circular No. 50/2015/TT-BGTVT and abolishes certain Points, Clauses, and Articles of Circular No. 03/2019/TT-BGTVT. Specifically, it amends the provisions on approval for construction of essential works within the scope of protection of expressway traffic infrastructure; provisions on the dossier for obtaining opinions on connection to national highways and the opinion of the Vietnam Highway Administration in cases not fully meeting the requirements for connection. At the same time, it abolishes Point c Clause 3 Article 13 of Circular No. 03/2019/TT-BGTVT.

适用范围

This Circular applies to the Vietnam Highway Administration and related agencies in managing, operating, using, maintaining, and protecting roads.

要点

  • Amend Clause 1 Article 13 of Circular No. 50/2015/TT-BGTVT on approval for construction of essential works within the scope of protection of expressway traffic infrastructure.
  • Amend Clause 3 Article 22 of Circular No. 50/2015/TT-BGTVT on the dossier for obtaining opinions on connection to national highways and the responsibility of the Vietnam Highway Administration in reviewing the dossier for connection requests.
  • Amend Point h Clause 1 Article 24 of Circular No. 50/2015/TT-BGTVT on the opinion of the Vietnam Highway Administration in cases not fully meeting the requirements for connection to national highways.
  • Abolish Point c Clause 3 Article 13 of Circular No. 03/2019/TT-BGTVT.
  • THE IMPLEMENTATION OF THIS CIRCULAR SHALL BE EFFECTIVE FROM AUGUST 1, 2024.

🌐 本文件的社会影响

  • To enhance management and protection of road traffic infrastructure.
  • To ensure legal validity and effectiveness in connecting to national highways.

❓ 常见问题

When does this Circular take effect?

This Circular takes effect from August 1, 2024.

What are the specific amendments made at Clause 1 Article 13 of Circular No. 50/2015/TT-BGTVT?

The Vietnam Highway Administration approves the construction of essential works within the scope of protection of expressway traffic infrastructure, except for power projects with voltage up to 35 kV.

What are the specific amendments made at Clause 3 Article 22 of Circular No. 50/2015/TT-BGTVT?

In cases where the opinion of the Ministry of Transport is required according to regulations, the People's Committee of the province sends the dossier for obtaining opinions to the Vietnam Highway Administration; the Vietnam Highway Administration is responsible for reviewing the dossier for connection requests to reply to the People's Committee of the province.

What are the specific amendments made at Point h Clause 1 Article 24 of Circular No. 50/2015/TT-BGTVT?

The opinion of the Vietnam Highway Administration on cases not fully meeting the requirements for connection to national highways according to regulations.

What are the specific abolitions made at Point c Clause 3 Article 13 of Circular No. 03/2019/TT-BGTVT?

Point c Clause 3 Article 13 of Circular No. 03/2019/TT-BGTVT has been abolished.

全文

MINISTRY OF TRANSPORTATION

SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness

Number: 25/2024/TT-BGTVT Hanoi,dated June 28, 2024

CIRCULAR

AMENDING AND SUPPLEMENTING CERTAIN PROVISIONS OF THE CIRCULAR NO. 50/2015/TT-BGTVT DATED SEPTEMBER 23, 2015 OF THE MINISTER OF TRANSPORT GUIDING THE IMPLEMENTATION OF CERTAIN PROVISIONS OF THE DECREE NO. 11/2010/NĐ-CP DATED FEBRUARY 24, 2010 OF THE GOVERNMENT ON MANAGEMENT AND PROTECTION OF ROAD INFRASTRUCTURE AND CIRCULAR NO. 03/2019/TT-BGTVT DATED JANUARY 11, 2019 OF THE MINISTER OF TRANSPORT ON WORKS RELATING TO PREVENTION, CONTROL, AND MITIGATION OF DISASTERS IN THE ROAD SECTOR

____________________ 

 

On the basis of Decree No. 86/2012/NĐ-CP dated October 19, 2012, issued by the Government detailing and guiding implementation of certain provisions of the Metrology Law;

On the basis of THE BIDDING LAW dated June 23, 2023;

Pursuant to the Law on Natural Disaster Prevention and Control dated June 19, 2013; the Law amending and supplementing certain articles of the Law on Natural Disaster Prevention and Control and the Law on Dike Construction dated June 17, 2020;

Pursuant to the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure;

Pursuant to the Decree No. 100/2013/NĐ-CP dated September 3, 2013 of the Government amending and supplementing certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure;

Pursuant to the Decree No. 64/2016/NĐ-CP dated July 1, 2016 of the Government amending and supplementing certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure;

Pursuant to the Decree No. 125/2018/NĐ-CP dated September 19, 20188 of the Government amending and supplementing certain provisions of the Decree No. 64/2016/NĐ-CP dated July 1, 2016 of the Government amending and supplementing certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure;

Pursuant to the Decree No. 117/2021/NĐ-CP dated December 22, 2021 of the Government amending and supplementing certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure;

Pursuant to the Decree No. 56/2022/NĐ-CP dated August 24, 2022 of the Government qstipulating the functions, tasks, powers, and organizational structure of the Ministry of Transport;

Pursuant to the Government Decree number Pursuant to the Decree No. 24/2024/NĐ-CP dated February 27, 2024 of the Government qstipulating detailed provisions and measures for implementation of the Law on Bidding regarding selection of contractors;

Considering the proposal of the Director of the Department of Road Infrastructure and the Director General of the Vietnam Highway Administration; KThe Minister of Transport issues this Circular amending and supplementing certain provisions of the Circular No. 50/2015/TT-BGTVT dated September 23, 2015 of the Minister of Transport guiding the implementation of certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure and the Circular No. 03/2019/TT-BGTVT dated January 11, 2019 of the Minister of Transport on works relating to prevention, control, and mitigation of disasters in the road sector

Article 1. Amending and supplementing certain provisions of the Circular No. 50/2015/TT-BGTVT dated September 23, 2015 of the Minister of Transport guiding the implementation of certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure (hereinafter referred to as Circular No. 50/2015/TT-BGTVT), the Circular No. 39/2021/TT-BGTVT dated December 31, 2021 of the Minister of Transport amending and supplementing certain provisions of the Circular No. 50/2015/TT-BGTVT (hereinafter referred to as Circular No. 39/2021/TT-BGTVT) and the Circular No. 06/2023/TT-BGTVT dated May 12, 2023 of the Minister of Transport amending and supplementing certain provisions of related circulars on management, operation, use, maintenance, and protection of roads (hereinafter referred to as Circular No. 06/2023/TT-BGTVT) as follows:.

1. Amending and supplementing Clause 1 Article 13 of the Circular No. 50/2015/TT-BGTVT (amended and supplemented by Clause 2 Article 1 of the Circular No. 39/2021/TT-BGTVT) as follows:

"1. The Vietnam Highway Administration shall approve the construction of essential works within the scope of protection of road infrastructure of expressways, except for power facilities with voltage up to 35 kV."

2. Amending and supplementing Clause 3 Article 22 of the Circular No. 50/2015/TT-BGTVT (amended and supplemented by Clause 5 Article 1 of the Circular No. 39/2021/TT-BGTVT, Point b Clause 1 Article 11 of the Circular No. 06/2023/TT-BGTVT) as follows:

"3. In cases where the opinion of the Ministry of Transport is required according to Clause 2 Article 1 of the Decree No. 117/2021/NĐ-CP dated December 22, 2021 amending and supplementing certain provisions of the Decree No. 11/2010/NĐ-CP dated February 24, 2010 of the Government on management and protection of road infrastructure, the People's Committee at provincial level shall submit the dossier for soliciting opinions according to Article 24 of this Circular to the Vietnam Highway Administration;

The Vietnam Highway Administration shall be responsible for reviewing the dossier of the connection request to reply to the People's Committee at provincial level."

3. Amending and supplementing Point h Clause 1 Article 24 of the Circular No. 50/2015/TT-BGTVT (amended and supplemented by Clause 7 Article 1 of the Circular No. 39/2021/TT-BGTVT) as follows:

"h) The opinion of the Vietnam Highway Administration for cases that do not fully meet the requirements for connecting to national highways as stipulated in Clause 2 Article 20 of this Circular."

4. Repealing Clause 2a Article 13 of the Circular No. 50/2015/TT-BGTVT dated September 23, 2015 of the Minister of Transport (supplemented by Clause 7 Article 11 of the Circular No. 06/2023/TT-BGTVT).

4. Repeal Clause 2a of Article 13 of Circular No. 50/2015/TT-BGTVT dated September 23, 2015, issued by the Minister of Transport (amended by Clause 7 of Article 11 of Circular No. 06/2023/TT-BGTVT).

Article 2. Repeal certain points, clauses, and articles of Circular No. 03/2019/TT-BGTVT dated January 11, 2019, issued by the Minister of Transport on flood prevention, control, and aftermath management in the road sector (hereinafter referred to as Circular No. 03/2019/TT-BGTVT) and Circular No. 22/2023/TT-BGTVT dated June 30, 2023, issued by the Minister of Transport amending and supplementing certain articles of Circular No. 03/2019/TT-BGTVT (hereinafter referred to as Circular No. 22/2023/TT-BGTVT).

Repeal Point c Clause 3 Article 13 of Circular No. 03/2019/TT-BGTVT (amended and supplemented by Clause 10 Article 1 of Circular No. 22/2023/TT-BGTVT).

Article 3. Implementation Provisions

1. This Circular takes effect from August 1, 2024.

2. In cases where applications for connection to national highways have been submitted to the Ministry of Transport before this Circular takes effect, they shall continue to be implemented according to the provisions of Circular No. 50/2015/TT-BGTVT (amended and supplemented by Circular No. 39/2021/TT-BGTVT and Circular No. 06/2023/TT-BGTVT).

3. For construction items to mitigate disaster consequences, address traffic congestion, and ensure traffic flow that have been or are being carried out before this Circular takes effect, the establishment, review, examination, and approval of completion documents shall continue to be implemented according to the provisions of Circular No. 03/2019/TT-BGTVT (amended and supplemented by Circular No. 22/2023/TT-BGTVT).

4. The Director of the Ministry's Office, the Inspector General of the Ministry, the Heads of Departments, the Directors of the Vietnam Highway Administration, the Directors of the Vietnam Expressway Administration, and the Heads of relevant agencies, organizations, and individuals are responsible for implementing this Circular./.

DEPUTY MINISTER
DEPUTY MINISTER
(Signed)
Nguyen Duy Lam
本文件的原始文件正在更新中,请先查看全文,稍后再来查看。

关系图

↑ 依据及影响本文件的文件
依据 13
24/2024/NĐ-CP Nghị định số 24/2024/NĐ-CP Quy định chi tiết một số điều và biện pháp thi hành Luật Đấu thầu về lựa chọn nhà thầu 已失效 22/2023/QH15 Luật Đấu thầu số 22/2023/QH15 生效中 125/2018/NĐ-CP Nghị định số 125/2018/NĐ-CP Sửa đổi, bổ sung một số điều của Nghị định số 64/2016/NĐ-CP ngày 01 tháng 7 năm 2016 của Chính phủ sửa đổi, bổ sung một số điều của Nghị định số 11/2010/NĐ-CP ngày 24 tháng 02 năm 2010 quy định về quản lý và bảo vệ kết cấu hạ tầng giao thông đường bộ 已失效 23/2008/QH12 Nghị quyết số 23/2008/QH12 Về kế hoạch phát triển kinh tế - xã hội năm 2009 生效中 100/2013/NĐ-CP Nghị định số 100/2013/NĐ-CP Sửa đổi, bổ sung một số điều của Nghị định số 11/2010/NĐ-CP ngày 24 tháng 02 năm 2010 của Chính phủ quy định về quản lý và bảo vệ kết cấu hạ tầng giao thông đường bộ 已失效 60/2020/QH14 Luật sửa đổi, bổ sung một số điều của Luật phòng, chống thiên tai và Luật đê điều số 60/2020/QH14 生效中 117/2021/NĐ-CP Nghị định số 117/2021/NĐ-CP Sửa đổi, bổ sung một số điều của Nghị định số 11/2010/NĐ-CP ngày 24 tháng 02 năm 2010 của Chính phủ quy định về quản lý và bảo vệ kết cấu hạ tầng giao thông đường bộ 已失效 11/2020/NĐ-CP Nghị định số 11/2020/NĐ-CP Quy định về thủ tục hành chính thuộc lĩnh vực Kho bạc Nhà nước 生效中 56/2022/NĐ-CP Nghị định số 56/2022/NĐ-CP Quy định chức năng, nhiệm vụ, quyền hạn và cơ cấu tổ chức của Bộ Giao thông vận tải 已失效 33/2013/QH13 Luật Phòng, chống thiên tai số 33/2013/QH13 生效中 64/2016/NĐ-CP Nghị định số 64/2016/NĐ-CP Sửa đổi, bổ sung một số điều của Nghị định số 11/2010/NĐ-CP ngày 24 tháng 02 năm 2010 của Chính phủ quy định về quản lý và bảo vệ kết cấu hạ tầng giao thông đường bộ 已失效 48/2024/QĐ-UBND Quyết định số 48/2024/QĐ-UBND Quy định về tổ chức lập, soát xét, thẩm quyền thẩm định, phê duyệt Hồ sơ hoàn thành khắc phục hậu quả thiên tai, xử lý ùn tắc, bảo đảm giao thông; Hồ sơ hoàn thành dự án khẩn cấp phòng, chống, khắc phục hậu quả thiên tai đối với hệ thống đường bộ địa phương trên địa bàn tỉnh Lai Châu và công trình hoặc dự án đường bộ đầu tư theo phương thức đối tác công tư trên hệ thống quốc lộ mà Ủy ban nhân dân tỉnh là cơ quan có thẩm quyền 已失效 36/2024/QĐ-UBND Quyết định số 36/2024/QĐ-UBND Ban hành Quy định một số nội dung về tổ chức lập, soát xét, thẩm định, phê duyệt hồ sơ hoàn thành khắc phục hậu quả thiên tai, xử lý ùn tắc, bảo đảm giao thông; hồ sơ hoàn thành dự án khẩn cấp phòng, chống, khắc phục hậu quả thiên tai trong lĩnh vực đường bộ trên địa bàn tỉnh Hòa Bình 已失效
25/2024/TT-BGTVT
Circular No. 25/2024/TT-BGTVT amends and supplements certain Articles of Circular No. 50/2015/TT-BGTVT dated September 23, 2015, issued by the Minister of Transport guiding the implementation of certain provisions of Decree No. 11/2010/NĐ-CP dated February 24, 2010, of the Government on management and protection of road traffic infrastructure and Circular No. 03/2019/TT-BGTVT dated January 11, 2019, issued by the Minister of Transport on flood prevention and mitigation work in the field of roads.
In effect
↓ 受本文件影响的文件

点击文件即可打开。红色边框=改变效力的关系。

译本

本文件提供以下语言版本: